Lead Work Notification
Lead-Work Pre-Job Notification
Employers are required to inform the nearest Cal/OSHA District Office in writing using the Lead‑work Pre‑job Notification form, at least 24 hours before the start of work that involves lead-containing materials, as follows:
- As required by subsection (p)(1) to (p)(4) of T8 CCR 1532.1.
- For tasks listed in subsection (d)(2) of T8 CCR 1532.1.
- Sent by either of the following methods:
- Letter
- Fax
- Phone call with a follow-up in writing (within 24 hours)
- When an employer intends to initiate unforeseen lead-work on an urgent basis within 24 hours, the notification requirement may be met by giving telephone notice to Cal/OSHA at any time prior to commencement of the work, followed by written notification sent or mailed within 24 hours of telephoning Cal/OSHA.
No notification is needed if:
- Disturbance is under 100 square or 100 linear feet of lead-containing materials
- Torch cutting or welding tasks last less than 1 hour per shift.
- If lead content is under 0.5% by weight, 5,000 parts per million (ppm) by weight, or 1.0 mg/cm2.
Written notification must include:
- Employer's name and contact info
- Job location
- Specific site of lead work
- Start date
- Completion date or duration of work
- Number of workers planned to do the lead work
- Structure type
- Lead material quantity
- Lead work description and practices
- Work supervisor
- Lead content in materials (if known)
Employers must update Cal/OSHA before or upon adoption of any changes to the:
- Work starting date,
- Surface area to be disturbed, or
- Type of lead-related work performed
- Work practices to be utilized
For an employer conducting ongoing, lead-related operations and maintenance work on stationary steel structures, the employer needs to notify Cal/OSHA:
- Once for each structure
- if the duration of the operations and maintenance work is less than one year.
- At least once per year with a supplemental written notification updating all of the information required by subsection (p)(2) for each structure.
- If the duration of the work is more than one year