Interim determination and provision selection page

General prevailing wage determinations
made by the director of industrial relations

Pursuant to California Labor Code part 7,
chapter 1, article 2, sections 1770, 1773, and 1773.1


Craft: Operating Engineer (Landscape Construction)

Page Classification Determination Holidays,
scope of work,
travel &
subsistence
Predetermined
increase
42 Operating Engineer (Landscape Construction)
(for projects advertised for bids on or after March 3, 2016 through March 15, 2017)
NC-63-3-75-2016-1 No increase *
42 Operating Engineer (Landscape Construction)
(for projects advertised for bids on or after March 16, 2017)
Interim
NC-63-3-75-2017-1
Increase

Return to main table



*   
A single asterisk after the expiration date of a determination indicates that no increase is required for projects advertised while that determination is in effect.  The determination remains in effect until it is canceled, modified, or superseded by a new determination by the Director of Industrial Relations.  A new determination will become effective 10 days after it is issued.  Contact the Office of the Director - Research Unit at (415) 703-4774 after 10 days from the expiration date, if no subsequent determination is issued.
 

To view the above current prevailing wage determinations, current predetermined increases, and the current holiday, advisory scope of work, and travel and subsistence provisions for each craft, you must first download a free copy of the Adobe Acrobat Reader available by clicking on the icon below:

get Adobe Acrobat button  Click on this icon to download a copy of the Adobe Acrobat Reader program.