Index 2017-2 San Diego basic trade journeyman rates

General prevailing wage determinations
made by the director of industrial relations

Pursuant to California Labor Code part 7,
chapter 1, article 2, sections 1770, 1773, and 1773.1


Page Determination Holidays,
scope of work,
travel &
subsistence
Predetermined
increase
27C Building/Construction Inspector and Field Soils and Materials Tester +
Increase
22 Carpenter
Increase
31 Cement Mason
Increase
28 Cranes, Pile Driving and Hoisting Equipment (Operating Engineer) +
Increase
23 Drywall Installer (Carpenter)
Increase
29 Laborer (Building Construction)
Increase
30 Laborer (Engineering Construction)
Increase
30B Landscape Irrigation Laborer
No increase *
25 Operating Engineer +
Increase
18E Parking and Highway Improvement (Striping, slurry & seal coat operations-Laborer)
No increase *
32 Teamster
Increase
18-B Tree Maintenance (Laborer)
Increase
24 Tunnel (Operating Engineer)
Increase
30C Tunnel Worker (Laborer - Engineering Construction)
No increase *

Return to main table


+   Includes shift pay determinations.
*   A single asterisk after the expiration date of a determination indicates that no increase is required for projects advertised while that determination is in effect.  The determination remains in effect until it is canceled, modified, or superseded by a new determination by the Director of Industrial Relations.  A new determination will become effective 10 days after it is issued.  Contact the Office of the Director - Research Unit at (415) 703-4774 after 10 days from the expiration date, if no subsequent determination is issued.


To view the above current prevailing wage determinations, current predetermined increases, and the current holiday, advisory scope of work, and travel and subsistence provisions for each craft, you must first download a free copy of the Adobe Acrobat Reader available by clicking on the icon below:

get Adobe Acrobat button