Northern California provision selection page

General prevailing wage determinations
made by the director of industrial relations

Pursuant to California Labor Code part 7,
chapter 1, article 2, sections 1770, 1773, and 1773.1


Craft: Steel Erector and Fabricator (Operating Engineer-Building Construction)

Page Classification Determination Holidays,
scope of work,
travel &
subsistence
Predetermined
increase
40B Steel Erector and Fabricator (Operating Engineer-Building Construction)
(For projects advertised for bids on or after September 1, 2015 through June 30, 2016)
NC-23-63-1-2015-2D1
No increase *
40B Steel Erector and Fabricator (Operating Engineer-Building Construction)
(For projects advertised for bids on or after July 1, 2016)
Interim NC-23-63-1-2016-1D1
Increase

Return to main table



*   
A single asterisk after the expiration date of a determination indicates that no increase is required for projects advertised while that determination is in effect.  The determination remains in effect until it is canceled, modified, or superseded by a new determination by the Director of Industrial Relations.  A new determination will become effective 10 days after it is issued.  Contact the Office of the Director - Research Unit at (415) 703-4774 after 10 days from the expiration date, if no subsequent determination is issued.


To view the above current prevailing wage determinations, current predetermined increases, and the current holiday, advisory scope of work, and travel and subsistence provisions for each craft, you must first download a free copy of the Adobe Acrobat Reader available by clicking on the icon below:

get Adobe Acrobat button  Click on this icon to download a copy of the Adobe Acrobat Reader program.