GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: SAN FRANCISCO COUNTY

DETERMINATION: SFR-2016-1

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE BASIC HOURLY RATE BASIC HOURLY RATE FOOTNOTE HEALTH AND WELFARE HEALTH AND WELFARE FOOTNOTE PENSION PENSION FOOTNOTE VACATION/ HOLIDAY VACATION/ HOLIDAY FOOTNOTE TRAINING TRAINING FOOTNOTE OTHER PAYMENTS OTHER PAYMENTS FOOTNOTE HOURS HOURS FOOTNOTE TOTAL HOURLY RATE DAILY OVERTIME HOURLY RATE DAILY OVERTIME HOURLY RATE FOOTNOTE SATURDAY OVERTIME HOURLY RATE SATURDAY OVERTIME HOURLY RATE FOOTNOTE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE FOOTNOTE HOLIDAY PROVISIONS SCOPE OF WORK PROVISIONS TRAVEL & SUBSISTENCE PROVISIONS
#BRICKLAYER, BLOCKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON 02/22/2016 04/30/2016** $36.990 A $9.790 $14.130 $3.000 B $0.800 $1.290 C 8 D $66.000 $85.990 E $85.990 E $105.990 HolidaysScope of WorkTravel & Subsistence
BRICKLAYER, BLOCKLAYER: POINTER, CLEANER, CAULKER, WATERPROOFER 08/22/2015 06/30/2016** $43.690 A $9.790 $10.790 $0.000 F $1.460 $0.400 8 D $66.130 $87.970 $87.970 G $109.820 HolidaysScope of WorkTravel & Subsistence
#BRICK TENDER 08/22/2015 04/30/2016** $32.180 A $10.000 $10.100 $0.000 F $0.390 $0.000 8 $52.670 $68.760 H $68.760 H $84.850 HolidaysScope of WorkTravel & Subsistence
#CARPET, LINOLEUM, SOFT FLOOR LAYER 02/22/2016 12/31/2016** $46.820 A $9.950 $12.580 $0.000 I $0.630 $0.340 8 $70.320 $93.730 J $93.730 J $117.140 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, FLOOR COVERING HANDLER AFTER 3 YEARS 02/22/2016 12/31/2016** $23.390 A $9.950 $6.290 $0.000 I $0.050 $0.340 8 $40.020 $51.710 J $51.710 J $63.410 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, FLOOR COVERING HANDLER LESS THAN 3 YEARS 02/22/2016 12/31/2016** $18.700 A $9.950 $5.030 $0.000 I $0.050 $0.340 8 $34.070 $43.420 J $43.420 J $52.770 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, FLOOR COVERING HANDLER TRAINEE, FIRST 3 MONTHS 02/22/2016 12/31/2016** $14.950 A $9.950 $4.020 $0.000 I $0.050 $0.340 8 $29.310 $36.780 J $36.780 J $44.260 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, FLOOR COVERING HANDLER TRAINEE, SECOND 3 MONTHS 02/22/2016 12/31/2016** $16.830 A $9.950 $4.530 $0.000 I $0.050 $0.340 8 $31.700 $40.110 J $40.110 J $48.530 HolidaysScope of WorkTravel & Subsistence
#ELECTRICIAN: COMM & SYSTEM INSTALLER 02/22/2016 11/30/2016** $34.820 $10.050 $5.650 K $0.000 $1.100 $0.210 L 8 $53.040 $71.060 M $71.060 M $89.080 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: COMM & SYSTEM TECH. 02/22/2016 11/30/2016** $39.650 $10.050 $5.650 K $0.000 $1.100 $0.210 L 8 $58.050 $78.570 M $78.570 M $99.090 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: INSIDE WIREMAN 08/22/2015 05/31/2016** $61.250 $13.480 $13.020 N $0.000 F $1.085 $0.380 7 O $91.050 $122.600 P $154.140 Q $154.140 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: CABLE SPLICER 08/22/2015 05/31/2016** $68.910 $13.480 $13.020 N $0.000 F $1.085 $0.380 7 O $98.940 $134.430 P $169.920 Q $169.920 HolidaysScope of WorkTravel & Subsistence
#FIELD SURVEYOR: CHIEF OF PARTY R 02/22/2016 02/28/2017** $38.750 $13.380 $11.280 S $3.690 T $0.820 $0.160 8 $68.080 $87.460 U $87.460 V $106.830 HolidaysScope of WorkTravel & Subsistence
FIELD SURVEYOR: INSTRUMENTMAN R 02/22/2016 02/28/2017** $35.660 $13.380 $11.280 S $3.690 T $0.820 $0.160 8 $64.990 $82.820 U $82.820 V $100.650 HolidaysScope of WorkTravel & Subsistence
FIELD SURVEYOR: CHAINMAN/RODMAN R 02/22/2016 02/28/2017** $32.780 $13.380 $11.280 S $3.690 T $0.820 $0.160 8 $62.110 $78.500 U $78.500 V $94.890 HolidaysScope of WorkTravel & Subsistence
#GLAZIER 02/22/2016 12/31/2016** $44.530 A $9.950 $15.390 W $0.000 $0.550 $0.380 X 8 $70.800 $93.070 Y $115.330 $115.330 HolidaysScope of WorkTravel & Subsistence
#MARBLE FINISHER Z 08/22/2015 07/31/2016** $30.220 AA $9.790 $3.930 $0.000 I $0.450 $0.550 8 $44.940 $60.050 AB $75.160 $75.160 HolidaysScope of WorkTravel & Subsistence
#MARBLE MASON Z 08/22/2015 07/31/2016** $40.410 AA $9.790 $14.390 $0.000 I $0.800 $0.770 8 $66.160 $86.360 AB $106.570 $106.570 HolidaysScope of WorkTravel & Subsistence
#PAINTER: BRUSH AND SPRAY 02/22/2016 12/31/2016** $41.370 AC $9.950 $11.640 S $0.000 I $0.550 $0.380 8 D $63.890 $84.570 $84.570 AD $105.260 HolidaysScope of WorkTravel & Subsistence
PAINTER: INDUSTRIAL PAINTER 02/22/2016 12/31/2016** $41.870 AC $9.950 $11.640 S $0.000 I $0.550 $0.380 8 D $64.390 $85.320 $85.320 AD $106.260 HolidaysScope of WorkTravel & Subsistence
PAINTER: SANDBLASTER, STEAM CLEANER, WATERBLASTER 02/22/2016 12/31/2016** $41.870 AC $9.950 $11.640 S $0.000 I $0.550 $0.380 8 D $64.390 $85.320 $85.320 AD $106.260 HolidaysScope of WorkTravel & Subsistence
PAINTER: EXOTIC MATERIALS 02/22/2016 12/31/2016** $42.120 AC $9.950 $11.640 S $0.000 I $0.550 $0.380 8 D $64.640 $85.700 $85.700 AD $106.760 HolidaysScope of WorkTravel & Subsistence
PAINTER: PAPERHANGER/WALLCOVERING 02/22/2016 12/31/2016** $42.370 AC $9.950 $11.640 S $0.000 I $0.550 $0.380 8 D $64.890 $86.070 $86.070 AD $107.260 HolidaysScope of WorkTravel & Subsistence
PAINTER: TAPER 02/22/2016 06/30/2016** $42.790 AE $9.950 $12.500 $0.000 I $0.460 $0.540 8 $66.240 $87.630 $87.630 D $109.030 AD HolidaysScope of WorkTravel & Subsistence
PAINTER: TAPER CLEAN-UP AF 02/22/2016 06/30/2016* $17.090 AG $9.950 $0.000 $0.000 $0.000 $0.000 8 $27.040 $35.580 $35.580 D $44.130 AD HolidaysScope of WorkTravel & Subsistence
#PLASTERER 08/22/2015 06/30/2016** $38.490 AH $13.030 $10.630 $0.000 F $1.090 $1.050 8 D $64.290 $80.920 AI $80.920 AI $97.540 HolidaysScope of WorkTravel & Subsistence
#PLASTER TENDER AJ 08/22/2015 06/30/2016* $32.030 AK $9.220 $13.300 $0.000 F $0.160 $0.450 8 $55.160 $69.180 AL $69.180 AL $83.190 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: PLUMBER, STEAMFITTER, REFRIGERATION FITTER (HVAC) 08/22/2015 06/30/2016** $66.000 AM $15.410 $21.930 $0.000 F $3.650 $3.450 AN 7 $110.440 $143.440 AO $143.440 AP $176.440 HolidaysScope of WorkTravel & Subsistence
PLUMBER: PLUMBING SERVICE AND REPAIR 08/22/2015 06/30/2016** $56.100 AM $14.290 $19.980 $0.000 F $2.100 $0.880 AN 8 $93.350 $121.400 AQ $121.400 G $149.450 HolidaysScope of WorkTravel & Subsistence
PLUMBER: AIR CONDITIONING & REFRIGERATION/HVAC - SERVICE WORK 08/22/2015 06/30/2016** $66.000 AM $15.410 $21.930 $0.000 F $3.650 $3.450 AN 8 $110.440 $143.440 AQ $143.440 G $176.440 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE/IRRIGATION PIPEFITTER 08/22/2015 06/30/2016** $56.100 A $14.000 $15.300 AR $0.000 F $1.810 $1.290 8 $88.500 $116.550 $116.550 AS $144.600 HolidaysScope of WorkTravel & Subsistence
PLUMBER: UNDERGROUND/UTILITY PIPEFITTER 08/22/2015 06/30/2016** $56.100 A $14.000 $15.300 AR $0.000 F $1.810 $1.290 8 $88.500 $116.550 $116.550 AS $144.600 HolidaysScope of WorkTravel & Subsistence
PLUMBER: SPRINKLER FITTER (FIRE PROTECTION AND FIRE CONTROL SYSTEMS) 02/22/2016 07/31/2016** $56.120 A $10.020 $16.550 $0.000 F $1.100 $0.400 8 $84.190 $112.250 $112.250 $140.310 HolidaysScope of WorkTravel & Subsistence
#ROOFER 08/22/2015 07/31/2016** $31.970 $9.140 $5.830 $3.530 $0.850 $0.550 AT 8 $51.870 $67.850 AU $67.850 AU $83.840 HolidaysScope of WorkTravel & Subsistence
ROOFER BITUMASTIC, ENAMELER, PIPE WRAPPER, COAL TAR PITCH BUILD-UP 08/22/2015 07/31/2016** $33.970 $9.140 $5.830 $3.530 $0.850 $0.550 AT 8 $53.870 $70.860 AU $70.860 AU $87.840 HolidaysScope of WorkTravel & Subsistence
ROOFER MASTIC WORKER, KETTLEMAN (2 KETTLES WITHOUT PUMPS) 08/22/2015 07/31/2016** $32.220 $9.140 $5.830 $3.530 $0.850 $0.550 AT 8 $52.120 $68.230 AU $68.230 AU $84.340 HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER 08/22/2015 06/26/2016* $52.200 AC $13.460 AV $26.420 AW $0.000 F $1.410 $1.150 7 $94.640 $123.640 AX $123.640 AX $152.640 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER TOTAL SHEET METAL CONTRACT OF $200000 OR LESS 08/22/2015 06/26/2016* $46.300 AC $13.460 AV $25.140 AW $0.000 F $1.410 $1.150 8 $87.460 $113.190 AY $113.190 AY $138.910 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER SERVICE MECHANIC (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2015 06/26/2016* $35.720 AC $12.940 AZ $14.680 AW $0.000 F $1.310 $1.150 8 $65.800 $84.910 BA $84.910 BA $104.020 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER SERVICE TECHNICIAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2015 06/26/2016* $32.370 AC $12.940 AZ $9.410 AW $0.000 F $1.310 $1.150 8 $57.180 $74.160 BA $74.160 BA $91.150 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER AIR CONDITIONING SPECIALIST (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2015 06/26/2016* $28.810 AC $12.940 AZ $4.330 AW $0.000 F $1.290 $1.150 8 $48.520 $63.380 AY $63.380 AY $78.230 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER AIR CONDITIONING JOURNEYMAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2015 06/26/2016* $33.510 AC $12.960 AV $9.690 AW $0.000 F $1.290 $1.150 8 $58.600 $76.100 AY $76.100 AY $93.610 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER METAL DECK & SIDING 02/22/2015 06/30/2015* $33.860 AC $13.530 AR $18.000 BB $0.000 F $0.300 BC $0.000 8 $65.690 $83.620 AY $83.620 AY $101.550 HolidaysScope of WorkTravel & Subsistence
#TERRAZZO FINISHER BD 02/22/2016 06/30/2016** $33.780 BE $9.790 $5.140 $0.000 F $0.800 $0.830 8 $50.340 $65.120 AY $65.120 AY $79.900 HolidaysScope of WorkTravel & Subsistence
#TERRAZZO WORKER BD 02/22/2016 06/30/2016** $41.010 BE $9.790 $14.940 $0.000 F $0.800 $1.010 8 $67.550 $85.370 AY $85.370 AY $103.190 HolidaysScope of WorkTravel & Subsistence
#TILE FINISHER 08/22/2015 03/31/2016* $22.790 BF $8.830 $3.460 $0.700 $0.450 $1.130 8 $37.360 $48.760 $48.760 D $60.150 HolidaysScope of WorkTravel & Subsistence
TILE FINISHER RED CIRCLED FINISHER 08/22/2015 03/31/2016* $28.480 BF $8.830 $3.690 $1.300 $0.350 $1.140 8 $43.790 $58.030 $58.030 D $72.270 HolidaysScope of WorkTravel & Subsistence
#TILE SETTER 08/22/2015 03/31/2016* $39.520 BF $8.830 $4.690 $2.350 $0.690 $1.730 8 $57.810 $77.570 $77.570 D $97.330 HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER 08/22/1998 12/31/1998* $12.700 $3.200 $0.780 $0.630 BG $0.000 $0.000 8 $17.310 $23.660 BH $23.660 BH $23.660 BH HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER PUMP INSTALLER 08/22/1998 12/31/1998* $12.700 $3.200 $0.780 $0.630 BG $0.000 $0.000 8 $17.310 $23.660 BH $23.660 BH $23.660 BH HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER HELPER 08/22/1998 12/31/1998* $10.380 $3.200 $0.780 $0.520 BI $0.000 $0.000 8 $14.880 $20.070 BH $20.070 BH $20.070 BH HolidaysScope of WorkTravel & Subsistence

Go to increase page

FOOTNOTES

*
EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
#
INDICATES AN APPRENTICEABLE CRAFT. THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @ HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.
&
THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.
A
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
B
INCLUDES AN AMOUNT FACTORED AT THE OVERTIME MULTIPLIER RATE.
C
INCLUDES AMOUNT FOR INDUSTRY PROMOTION FUND, INTERNATIONAL MASONRY INSTITUTE, LABOR MANAGEMENT COOPERATION COMMITTEE, AND VACATION TRUST FUND.
D
SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
E
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
F
INCLUDED IN STRAIGHT-TIME HOURLY RATE.
G
RATE APPLIES TO THE FIRST 10 HOURS WORKED ON SATURDAY. ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
H
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
I
INCLUDED IN BASIC HOURLY RATE.
J
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
K
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD.
L
IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES.
M
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
N
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
O
8 HOURS OF WORK IF MULTIPLE SHIFT IS WORKED.
P
RATE APPLIES TO THE FIRST 2 OVERTIME HOURS; ALL OTHER TIME IS PAID AT THE SATURDAY OVERTIME HOURLY RATE.
Q
SEVEN HOURS ON SATURDAY MAY BE WORKED AT THE DAILY OVERTIME RATE PROVIDED NO OVERTIME HOUR IS WORKED DURING THE WEEK.
R
ALL CREWS, WITHOUT CONSIDERATION TO THE NUMBER OF INDIVIDUALS IN THE CREW, SHALL INCLUDE A CHIEF OF PARTY. A CREW CONSISTS OF ONE (1) OR MORE EMPLOYEES PERFORMING FIELD AND CONSTRUCTION SURVEY WORK.
S
INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
T
INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.
U
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS, MONDAY THROUGH FRIDAY. ALL OTHER OVERTIME IS PAID AT THE SUNDAY/HOLIDAY RATE.
V
RATE APPLIES TO THE FIRST 12 OVERTIME HOURS WORKED. ALL OTHER OVERTIME IS PAID AT THE SUNDAY/HOLIDAY RATE. IN THE EVENT IT IS NOT REASONABLY POSSIBLE TO COMPLETE 40 HOURS OF WORK ON AN 8 HOUR DAY, MONDAY THROUGH FRIDAY, THEN THE BALANCE OF THE 40 HOURS, UP TO 8 HOURS, MAY BE WORKED ON SATURDAY AT THE STRAIGHT-TIME RATE.
W
INCLUDES AN AMOUNT PER HOUR WORKED FOR IUPAT, IARP, AND RETIREE PENSION.
X
INCLUDES AMOUNTS FOR INDUSTRY FUND, WORK PRESERVATION FUND, AND LABOR MANAGEMENT COOPERATION INITIATIVE
Y
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND FIRST 8 HOURS WORKED ON DESIGNATED DAYS OFF; ALL OTHER TIME IS PAID AT THE SATURDAY, SUNDAY AND HOLIDAY OVERTIME RATE.
Z
EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFFOLD SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.
AA
INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.
AB
RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
AC
INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
AD
DESIGNATED DAYS OFF SHALL BE PAID AT THE SATURDAY OVERTIME RATE; PLEASE REFER TO THE HOLIDAY PROVISIONS FOR A LIST OF DESIGNATED DAYS OFF.
AE
INCLUDES AMOUNTS FOR VACATION AND DUES CHECK OFF
AF
PLEASE NOTE THAT THE TAPER CLEAN-UP APPLIES ONLY TO THE TAPER CLASSIFICATION.
AG
INCLUDES AN AMOUNT FOR DUES CHECK OFF
AH
INCLUDE AMOUNTS WITHHELD FOR DUES CHECK OFF AND VACATION WHICH IS NOT FACTORED INTO OVERTIME. EMPLOYEES OPERATING AND WORKING BEHIND PLASTER GUNS SHALL RECEIVE AN ADDITIONAL $5.00 PER DAY ABOVE THE WAGE RATE. EMPLOYEES WORKING ON AN EXTERIOR SUSPENDED SCAFFOLD SHALL BE PAID AN ADDITIONAL $10.00 PER DAY ABOVE THE WAGE RATE.
AI
RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAYS AND DESIGNATED DAYS OFF. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
AJ
ALL HOD CARRIERS WORKING ON THE HOSE SHALL RECEIVE $5.00 PER DAY OVER SCALE.
AK
INCLUDES AN AMOUNT FOR VACATION, DUES CHECK-OFF AND ORGANIZING DUES WHICH ARE NOT FACTORED INTO OVERTIME.
AL
RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
AM
INCLUDES AN AMOUNT FOR VACATION/HOLIDAY.
AN
INCLUDES FUNDS FOR SUB/JURY DUTY, CRAFT, CONTRACT ADMINISTRATION/HIRING HALL, JURISDICTIONAL PROTECTION AND SCHOLARSHIP.
AO
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 9 HOURS ON SATURDAY ONLY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AP
THE FIRST 9 HOURS WORKED ON SATURDAY SHALL BE PAID AT TIME AND ONE-HALF.
AQ
RATE APPLIES TO THE FIRST 2 OVERTIME HOURS ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AR
PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AS
RATE APPLIES TO THE FIRST 8 HOURS WORKED; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AT
INCLUDES AMOUNTS FOR LABOR MANAGEMENT AND PROMOTION FUND
AU
RATE APPLIES FOR THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 12 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY/HOLIDAY RATE. IN THE EVENT THAT CONDITIONS OVER WHICH THE ROOFING CONTRACTOR HAS NO CONTROL (I.E. ADVERSE WEATHER, PROJECT DELAYS, LOGISTICAL PROBLEMS, GENERAL CONTRACTOR OR BUILDING OWNER REQUIREMENTS, ETC.) PREVENT EMPLOYEES FROM WORKING ON ONE OR MORE DAYS DURING THE REGULAR WORK WEEK, WORK PERFORMED ON SATURDAY MAY BE PAID AT THE STRAIGHT TIME RATES.
AV
INCLUDES SMOHIT AND SHC. EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AW
INCLUDES AN AMOUNT FOR PENSION WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AX
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 7 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AY
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AZ
INCLUDES SHC. EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
BA
RATE APPLIES TO FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY DURING THE EMPLOYEES NORMAL WORKING HOURS. ALL OTHER OVERTIME HOURS SHALL BE PAID AT THE SUNDAY AND HOLIDAY DOUBLE TIME RATE.
BB
INCLUDES AN AMOUNT FOR PENSION FACTORED AT THE OVERTIME MULTIPLIER RATE.
BC
INCLUDES $0.03 FOR SCHOLAR FUND.
BD
THE RATIO OF TERRAZZO FINISHER HOURS TO TERRAZZO WORKER HOURS SHALL NOT EXCEED TWO (2) TO ONE (1).
BE
INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
BF
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF, WHICH IS FACTORED IN THE OVERTIME RATES. ANY EMPLOYEE WORKING UNDERGROUND SHALL RECEIVE $1.00 PER HOUR IN ADDITION TO REGULAR WAGES.
BG
RATE APPLIES TO FIRST YEAR OF EMPLOYMENT ONLY; $0.88 AFTER 2 YEARS OF EMPLOYMENT.
BH
RATE APPLIES TO ALL TIME WORKED IN EXCESS OF 8 HOURS PER DAY OR 40 HOURS PER WEEK AND FOR ALL HOURS ON SUNDAYS AND HOLIDAYS. RATE DOES NOT INCLUDE ANY ADDITIONAL AMOUNT THAT MAY BE REQUIRED FOR VACATION/HOLIDAY PAYMENT.
BI
RATE APPLIES TO FIRST YEAR OF EMPLOYMENT ONLY; $0.72 AFTER 2 YEARS OF EMPLOYMENT.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH THE DIRECTOR OF INDUSTRIAL RELATIONS. IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE. YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

TRAVEL AND/OR SUBSISTENCE: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH WORKER TO EXECUTE THE WORK. YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

Return to main page