GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: SAN FRANCISCO COUNTY

DETERMINATION: SFR-2016-1

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE DATE OF NEXT INCREASE 1 AMOUNT OF INCREASE 1 INCREASE FOOTNOTE 1 DATE OF NEXT INCREASE 2 AMOUNT OF INCREASE 2 INCREASE FOOTNOTE 2 DATE OF NEXT INCREASE 3 AMOUNT OF INCREASE 3 INCREASE FOOTNOTE 3 DATE OF NEXT INCREASE 4 AMOUNT OF INCREASE 4 INCREASE FOOTNOTE 4
BRICKLAYER, BLOCKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON 02/22/2016 04/30/2016** 05/01/2016 $1.000 A 05/01/2017 $1.500 A 05/01/2018 $1.750 A
BRICKLAYER, BLOCKLAYER: POINTER, CLEANER, CAULKER, WATERPROOFER 08/22/2015 06/30/2016** 07/01/2016 $1.650 A 07/01/2017 $1.700 A
BRICK TENDER 08/22/2015 04/30/2016** 05/01/2016 $0.800 A 05/01/2017 $1.200 A 05/01/2018 $1.400 A
CARPET, LINOLEUM, SOFT FLOOR LAYER 02/22/2016 12/31/2016** 01/01/2017 $2.000 A 01/01/2018 $2.000 A 01/01/2019 $2.000 A
CARPET, LINOLEUM, FLOOR COVERING HANDLER AFTER 3 YEARS 02/22/2016 12/31/2016** 01/01/2017 $1.000 A 01/01/2018 $1.000 A 01/01/2019 $1.000 A
CARPET, LINOLEUM, FLOOR COVERING HANDLER LESS THAN 3 YEARS 02/22/2016 12/31/2016** 01/01/2017 $0.800 A 01/01/2018 $0.800 A 01/01/2019 $0.800 A
CARPET, LINOLEUM, FLOOR COVERING HANDLER TRAINEE, FIRST 3 MONTHS 02/22/2016 12/31/2016** 01/01/2017 $0.640 A 01/01/2018 $0.640 A 01/01/2019 $0.640 A
CARPET, LINOLEUM, FLOOR COVERING HANDLER TRAINEE, SECOND 3 MONTHS 02/22/2016 12/31/2016** 01/01/2017 $0.720 A 01/01/2018 $0.720 A 01/01/2019 $0.720 A
ELECTRICIAN: COMM & SYSTEM INSTALLER 02/22/2016 11/30/2016** 12/01/2016 $2.000 A
ELECTRICIAN: COMM & SYSTEM TECH. 02/22/2016 11/30/2016** 12/01/2016 $2.000 A
ELECTRICIAN: INSIDE WIREMAN 08/22/2015 05/31/2016** 06/01/2016 $3.250 A 06/01/2017 $3.750 A
ELECTRICIAN: CABLE SPLICER 08/22/2015 05/31/2016** 06/01/2016 $3.250 A 06/01/2017 $3.750 A
FIELD SURVEYOR: CHIEF OF PARTY B 02/22/2016 02/28/2017** 03/01/2017 $2.000 A
FIELD SURVEYOR: INSTRUMENTMAN B 02/22/2016 02/28/2017** 03/01/2017 $2.000 A
FIELD SURVEYOR: CHAINMAN/RODMAN B 02/22/2016 02/28/2017** 03/01/2017 $2.000 A
GLAZIER 02/22/2016 12/31/2016** 01/01/2017 $2.000 C 01/01/2018 $1.750 D
MARBLE FINISHER E 08/22/2015 07/31/2016** 08/01/2016 $1.300 A 02/01/2017 $0.050 A 08/01/2017 $1.850 A 08/01/2018 $2.200 A
MARBLE MASON E 08/22/2015 07/31/2016** 08/01/2016 $2.100 A 02/01/2017 $0.400 A 08/01/2017 $3.000 A 08/01/2018 $3.250 A
PAINTER: BRUSH AND SPRAY 02/22/2016 12/31/2016** 01/01/2017 $1.760 F
PAINTER: INDUSTRIAL PAINTER 02/22/2016 12/31/2016** 01/01/2017 $1.760 F
PAINTER: SANDBLASTER, STEAM CLEANER, WATERBLASTER 02/22/2016 12/31/2016** 01/01/2017 $1.760 F
PAINTER: EXOTIC MATERIALS 02/22/2016 12/31/2016** 01/01/2017 $1.760 F
PAINTER: PAPERHANGER/WALLCOVERING 02/22/2016 12/31/2016** 01/01/2017 $1.760 F
PAINTER: TAPER 02/22/2016 06/30/2016** 07/01/2016 $2.050 A 01/01/2017 $2.050 G 01/01/2018 $2.050 G
PLASTERER 08/22/2015 06/30/2016** 07/01/2016 $1.700 A
PLUMBER: PLUMBER, STEAMFITTER, REFRIGERATION FITTER (HVAC) 08/22/2015 06/30/2016** 07/01/2016 $3.500 A
PLUMBER: PLUMBING SERVICE AND REPAIR 08/22/2015 06/30/2016** 07/01/2016 $2.980 A
PLUMBER: AIR CONDITIONING & REFRIGERATION/HVAC - SERVICE WORK 08/22/2015 06/30/2016** 07/01/2016 $3.500 A
PLUMBER: LANDSCAPE/IRRIGATION PIPEFITTER 08/22/2015 06/30/2016** 07/01/2016 $2.980 A
PLUMBER: UNDERGROUND/UTILITY PIPEFITTER 08/22/2015 06/30/2016** 07/01/2016 $2.980 A
PLUMBER: SPRINKLER FITTER (FIRE PROTECTION AND FIRE CONTROL SYSTEMS) 02/22/2016 07/31/2016** 08/01/2016 $3.000 A 07/31/2017 $3.750 A
ROOFER 08/22/2015 07/31/2016** 08/01/2016 $2.250 A 08/01/2017 $2.500 A
ROOFER BITUMASTIC, ENAMELER, PIPE WRAPPER, COAL TAR PITCH BUILD-UP 08/22/2015 07/31/2016** 08/01/2016 $2.250 A 08/01/2017 $2.500 A
ROOFER MASTIC WORKER, KETTLEMAN (2 KETTLES WITHOUT PUMPS) 08/22/2015 07/31/2016** 08/01/2016 $2.250 A 08/01/2017 $2.500 A
TERRAZZO FINISHER H 02/22/2016 06/30/2016** 07/01/2016 $1.000 A 07/01/2017 $1.000 A 07/01/2018 $1.250 A
TERRAZZO WORKER H 02/22/2016 06/30/2016** 07/01/2016 $1.500 A 07/01/2017 $1.750 A 07/01/2018 $2.000 A

Return to wage page

FOOTNOTES

**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
A
THE PREDETERMINED INCREASE SHOWN IS TO BE ALLOCATED TO WAGES AND/OR EMPLOYER PAYMENTS. PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 WHEN THE PREDETERMINED INCREASE BECOMES DUE TO CONFIRM THE DISTRIBUTION. PLEASE ALSO EXAMINE THE IMPORTANT NOTICES TO SEE IF ANY MODIFICATIONS HAVE BEEN ISSUED, AS THERE MAY BE REDUCTIONS TO PREDETERMINED INCREASES.
B
ALL CREWS, WITHOUT CONSIDERATION TO THE NUMBER OF INDIVIDUALS IN THE CREW, SHALL INCLUDE A CHIEF OF PARTY. A CREW CONSISTS OF ONE (1) OR MORE EMPLOYEES PERFORMING FIELD AND CONSTRUCTION SURVEY WORK.
C
$0.75 TO PENSION AND $1.25 TO WAGES AND/OR EMPLOYER PAYMENTS.
D
$0.75 TO PENSION AND $1.00 TO WAGES AND/OR EMPLOYER PAYMENTS.
E
EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFFOLD SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.
F
$0.01 TO TRAINING, $1.75 TO WAGES AND/OR FRINGES.
G
$0.48 TO PENSION AND $1.57 TO BE ALLOCATED TO WAGES AND/OR EMPLOYER PAYMENTS. PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 WHEN THE PREDETERMINED INCREASE BECOMES DUE TO CONFIRM THE DISTRIBUTION. PLEASE ALSO EXAMINE THE IMPORTANT NOTICES TO SEE IF ANY MODIFICATIONS HAVE BEEN ISSUED, AS THERE MAY BE REDUCTIONS TO PREDETERMINED INCREASES.
H
THE RATIO OF TERRAZZO FINISHER HOURS TO TERRAZZO WORKER HOURS SHALL NOT EXCEED TWO (2) TO ONE (1).