GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: TULARE COUNTY

DETERMINATION: TUL-2016-1

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE BASIC HOURLY RATE BASIC HOURLY RATE FOOTNOTE HEALTH AND WELFARE HEALTH AND WELFARE FOOTNOTE PENSION PENSION FOOTNOTE VACATION/ HOLIDAY VACATION/ HOLIDAY FOOTNOTE TRAINING TRAINING FOOTNOTE OTHER PAYMENTS OTHER PAYMENTS FOOTNOTE HOURS HOURS FOOTNOTE TOTAL HOURLY RATE DAILY OVERTIME HOURLY RATE DAILY OVERTIME HOURLY RATE FOOTNOTE SATURDAY OVERTIME HOURLY RATE SATURDAY OVERTIME HOURLY RATE FOOTNOTE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE FOOTNOTE HOLIDAY PROVISIONS SCOPE OF WORK PROVISIONS TRAVEL & SUBSISTENCE PROVISIONS
#BRICKLAYER, STONEMASON, MARBLE MASON, CEMENT BLOCKLAYER, POINTER, CAULKER, CLEANER 08/22/2015 04/30/2016* $36.590 A $7.500 $5.900 $0.000 $0.760 B $0.350 8 C $51.100 $69.400 D $69.400 D $87.690 HolidaysScope of WorkTravel & Subsistence
#BRICKLAYER: MASON FINISHER 08/22/2015 04/30/2016* $26.550 A $7.500 $6.900 $0.000 $0.670 E $0.350 8 C $41.970 $55.240 D $55.240 D $68.520 HolidaysScope of WorkTravel & Subsistence
BRICK TENDER 08/22/2014 09/30/2014* $11.000 & $6.840 $10.130 $0.000 $0.410 $0.000 8 $28.380 $33.880 $33.880 $33.880 HolidaysScope of WorkTravel & Subsistence
#CARPET, LINOLEUM, RESILIENT TILE LAYER 02/22/2016 12/31/2016** $31.390 F $9.950 $7.520 $0.000 $0.560 $0.100 8 $49.520 $65.210 G $65.210 G $80.910 H HolidaysScope of WorkTravel & Subsistence
#ELECTRICIAN: COMM & SYSTEM INSTALLER 02/22/2016 11/30/2016** $29.980 $10.050 $5.150 I $0.000 $1.100 $0.210 J 8 $47.540 $63.050 K $63.050 K $78.570 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: COMM & SYSTEM TECH. 02/22/2016 11/30/2016** $34.140 $10.050 $5.150 I $0.000 $1.100 $0.210 J 8 $51.840 $69.510 K $69.510 K $87.180 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: INSIDE WIREMAN, TECHNICIAN 02/22/2016 08/31/2016** $36.000 $10.250 $7.800 I $0.000 L $1.000 $0.700 8 $56.830 $75.370 M $75.370 M $93.910 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: CABLE SPLICER 02/22/2016 08/31/2016** $39.500 $10.250 $7.800 I $0.000 L $1.000 $0.700 8 $60.440 $80.780 M $80.780 M $101.120 HolidaysScope of WorkTravel & Subsistence
#FIELD SURVEYOR: CHIEF OF PARTY N 02/22/2016 02/28/2017** $38.750 $13.380 $11.280 O $3.690 P $0.820 $0.160 8 $68.080 $87.460 Q $87.460 R $106.830 HolidaysScope of WorkTravel & Subsistence
FIELD SURVEYOR: INSTRUMENTMAN N 02/22/2016 02/28/2017** $35.660 $13.380 $11.280 O $3.690 P $0.820 $0.160 8 $64.990 $82.820 Q $82.820 R $100.650 HolidaysScope of WorkTravel & Subsistence
FIELD SURVEYOR: CHAINMAN/RODMAN N 02/22/2016 02/28/2017** $32.780 $13.380 $11.280 O $3.690 P $0.820 $0.160 8 $62.110 $78.500 Q $78.500 R $94.890 HolidaysScope of WorkTravel & Subsistence
GLAZIER 08/22/2013 09/30/2013* $11.000 & $0.000 $0.000 $0.550 $0.000 $0.000 8 $11.550 $17.050 $17.050 $17.050 HolidaysScope of WorkTravel & Subsistence
#MARBLE FINISHER S 08/22/2015 07/31/2016** $30.220 T $9.790 $3.930 $0.000 U $0.450 $0.550 8 $44.940 $60.050 V $75.160 $75.160 HolidaysScope of WorkTravel & Subsistence
#PAINTER TAPER 02/22/2016 12/31/2016** $31.440 W $9.950 $10.000 $0.000 $0.550 $0.410 8 $52.350 $68.070 $68.070 X $83.790 Y HolidaysScope of WorkTravel & Subsistence
#PAINTER: 02/22/2016 12/31/2016** $27.230 F $9.950 $5.570 O $0.000 $0.410 $0.410 8 X $43.570 $57.190 $57.190 $70.800 Z HolidaysScope of WorkTravel & Subsistence
PAINTER: PAPERHANGER, SPRAY PAINTER 02/22/2016 12/31/2016** $28.230 F $9.950 $5.570 O $0.000 $0.410 $0.410 8 X $44.570 $58.690 $58.690 $72.800 Z HolidaysScope of WorkTravel & Subsistence
PAINTER: SANDBLASTER 02/22/2016 12/31/2016** $28.730 F $9.950 $5.570 O $0.000 $0.410 $0.410 8 X $45.070 $59.440 $59.440 $73.800 Z HolidaysScope of WorkTravel & Subsistence
PAINTER: REMEDIAL PATCHER 02/22/2016 12/31/2016** $28.480 F $9.950 $5.570 O $0.000 $0.410 $0.410 8 X $44.820 $59.060 $59.060 $73.300 Z HolidaysScope of WorkTravel & Subsistence
#PLASTERER 08/22/2015 06/30/2016** $30.000 F $13.030 $8.930 $3.000 $1.080 $1.150 8 $57.190 $71.330 $71.330 AA $85.470 HolidaysScope of WorkTravel & Subsistence
#PLASTER TENDER 08/22/2015 06/30/2016** $30.020 $7.540 $9.730 $2.630 $0.430 $1.030 AB 8 $51.380 $66.390 G $66.390 G $81.400 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: PLUMBER, STEAMFITTER, REFRIGERATION FITTER (HVAC) 02/22/2016 06/30/2016** $38.150 $11.530 $14.310 $0.000 L $1.550 $2.770 8 $68.310 $87.390 AC $87.390 AC $106.460 HolidaysScope of WorkTravel & Subsistence
PLUMBER: PIPE TRADESMAN 02/22/2016 06/30/2016* $13.000 $9.340 $1.000 $0.000 L $0.000 $0.710 8 $24.050 $30.550 AC $30.550 AC $37.050 HolidaysScope of WorkTravel & Subsistence
PLUMBER: UNDERGROUND UTILITY PIPEFITTER 08/22/2015 06/30/2016** $26.600 $6.600 $3.000 AD $2.000 $0.450 $0.600 8 X $39.250 $52.550 $52.550 $65.850 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE PIPEFITTER 08/22/2015 06/30/2016** $26.600 $6.600 $3.000 AD $2.000 $0.450 $0.600 8 X $39.250 $52.550 $52.550 $65.850 HolidaysScope of WorkTravel & Subsistence
PLUMBER: UNDERGROUND UTILITY ASSISTANT JOURNEYMAN AE 08/22/2015 06/30/2016** $15.600 $6.600 $3.000 AD $2.000 $0.450 $0.600 8 X $28.250 $36.050 $36.050 $43.850 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE ASSISTANT JOURNEYMAN AE 08/22/2015 06/30/2016** $15.600 $6.600 $3.000 AD $2.000 $0.450 $0.600 8 X $28.250 $36.050 $36.050 $43.850 HolidaysScope of WorkTravel & Subsistence
PLUMBER: UNDERGROUND UTILITY TRADESMAN AF 08/22/2015 06/30/2016** $10.900 $6.600 $3.000 AD $2.000 $0.450 $0.600 8 X $23.550 $29.000 $29.000 $34.450 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE TRADESMAN I AG 08/22/2015 06/30/2016** $10.550 $6.600 $0.000 AD $2.000 $0.450 $0.600 8 X $20.200 $25.480 $25.480 $30.750 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE TRADESMAN II AG 08/22/2015 06/30/2016** $10.900 $6.600 $3.000 AD $2.000 $0.450 $0.600 8 X $23.550 $29.000 $29.000 $34.450 HolidaysScope of WorkTravel & Subsistence
PLUMBER: FIRE SPRINKLER FITTER (PROTECTION AND CONTROL SYSTEMS, OVERHEAD AND UNDERGROUND) 02/22/2016 03/31/2016* $34.310 $8.770 $11.030 AH $0.000 $0.450 $0.250 8 $54.810 $71.970 $71.970 $89.120 HolidaysScope of WorkTravel & Subsistence
#ROOFER 02/22/2016 08/31/2016* $26.770 AI $6.480 $6.650 $0.000 L $0.300 $0.020 AJ 8 $40.220 $53.600 $53.600 AK $66.990 HolidaysScope of WorkTravel & Subsistence
ROOFER PITCH WORK 02/22/2016 08/31/2016* $28.770 AI $6.480 $6.650 $0.000 L $0.300 $0.020 AJ 8 $42.220 $56.600 $56.600 AK $70.990 HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER (HVAC) 02/22/2014 03/31/2014* $34.490 AL $10.780 $17.400 $0.000 $1.480 $0.000 8 $64.150 $81.400 $81.400 $81.400 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER (HVAC) METAL DECK & SIDING 02/22/2014 03/31/2014* $34.490 AL $10.780 $17.400 $0.000 $1.480 $0.000 8 $64.150 $81.400 $81.400 $81.400 HolidaysScope of WorkTravel & Subsistence
#TERRAZZO FINISHER AM 02/22/2016 06/30/2016** $33.780 AN $9.790 $5.140 $0.000 L $0.800 $0.830 8 $50.340 $65.120 D $65.120 D $79.900 HolidaysScope of WorkTravel & Subsistence
#TERRAZZO WORKER AM 02/22/2016 06/30/2016** $41.010 AN $9.790 $14.940 $0.000 L $0.800 $1.010 8 $67.550 $85.370 D $85.370 D $103.190 HolidaysScope of WorkTravel & Subsistence
#TILE FINISHER 08/22/2015 03/31/2016* $21.850 AO $8.830 $2.700 $1.300 $0.400 $1.120 8 $36.200 $47.130 $47.130 X $58.050 HolidaysScope of WorkTravel & Subsistence
#TILE SETTER 08/22/2015 03/31/2016* $30.780 AO $8.830 $4.120 $2.350 $0.640 $1.630 8 $48.350 $63.740 $63.740 X $79.130 HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER 05/22/1986 12/15/1986* $10.530 $0.990 $0.250 $0.460 AP $0.000 $0.000 8 $12.230 $17.500 AQ $17.500 AQ $22.760 AQ HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER PUMP INSTALLER 05/22/1986 12/15/1986* $11.030 $0.990 $0.260 $0.490 AR $0.000 $0.000 8 $12.770 $18.280 AQ $18.280 AQ $23.800 AQ HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER HELPER 02/22/2016 03/30/2016* $10.000 $0.990 $0.220 $0.410 AS $0.000 $0.000 8 $11.620 $16.620 AQ $16.620 AQ $21.620 AQ HolidaysScope of WorkTravel & Subsistence

Go to increase page

FOOTNOTES

*
EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
#
INDICATES AN APPRENTICEABLE CRAFT. THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @ HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.
&
THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.
A
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF AND CONTRACT COMPLIANCE.
B
INCLUDES AN AMOUNT, $0.50, FOR THE IMI TRAINING FUND.
C
SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER, OR REASONS BEYOND THE CONTROL OF THE EMPLOYER.
D
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
E
INCLUDES AN AMOUNT, $0.41, FOR THE IMI TRAINING FUND.
F
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
G
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
H
DESIGNATED DAYS OFF SHALL BE PAID AT TIME AND ONE-HALF (1 1/2X). PLEASE REFER TO THE HOLIDAY PROVISION FOR A LIST OF DESIGNATED DAYS OFF.
I
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD.
J
IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES.
K
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
L
INCLUDED IN STRAIGHT-TIME HOURLY RATE.
M
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAYS. ALL OTHER TIME IS PAID AT THE SUNDAY/HOLIDAY OVERTIME RATE.
N
ALL CREWS, WITHOUT CONSIDERATION TO THE NUMBER OF INDIVIDUALS IN THE CREW, SHALL INCLUDE A CHIEF OF PARTY. A CREW CONSISTS OF ONE (1) OR MORE EMPLOYEES PERFORMING FIELD AND CONSTRUCTION SURVEY WORK.
O
INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
P
INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.
Q
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS, MONDAY THROUGH FRIDAY. ALL OTHER OVERTIME IS PAID AT THE SUNDAY/HOLIDAY RATE.
R
RATE APPLIES TO THE FIRST 12 OVERTIME HOURS WORKED. ALL OTHER OVERTIME IS PAID AT THE SUNDAY/HOLIDAY RATE. IN THE EVENT IT IS NOT REASONABLY POSSIBLE TO COMPLETE 40 HOURS OF WORK ON AN 8 HOUR DAY, MONDAY THROUGH FRIDAY, THEN THE BALANCE OF THE 40 HOURS, UP TO 8 HOURS, MAY BE WORKED ON SATURDAY AT THE STRAIGHT-TIME RATE.
S
EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFFOLD SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.
T
INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.
U
INCLUDED IN BASIC HOURLY RATE.
V
RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
W
INCLUDES AN AMOUNT FOR DUES CHECK OFF
X
SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
Y
DESIGNATED DAYS OFF SHALL BE PAID AT THE SATURDAY OVERTIME RATE; PLEASE REFER TO THE HOLIDAY PROVISIONS FOR A LIST OF DESIGNATED DAYS OFF.
Z
SUNDAY IS PAID AT SATURDAY OVERTIME HOURLY RATE.
AA
RATE APPLIES TO THE FIRST 8 HOURS WORKED; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AB
AMOUNT IS FOR VALLEY MORTAR TRADES FUND ($1.00) AND INDUSTRY STABILIZATION FUND ($0.03)
AC
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AD
PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AE
THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE.
AF
THERE SHALL BE NO MORE THAN THREE TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON EACH JOBSITE.
AG
THERE SHALL BE NO MORE THAN FOUR TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON EACH JOBSITE. MAINTENANCE WORK, BOTH DURING AND AFTER THE PLANT ESTABLISHMENT PERIOD, MAY BE PERFORMED BY LANDSCAPE TRADESMEN WITHOUT THE SUPERVISION OF A JOURNEYMAN PIPEFITTER.
AH
INCLUDES AN AMOUNT FOR SUPPLEMENTAL PENSION FUND.
AI
INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
AJ
INCLUDES AN AMOUNT FOR THE ROOFERS AND WATERPROOFERS RESEARCH AND EDUCATION JOINT TRUST FUND.
AK
WHEN ADVERSE WEATHER OR JOB SCHEDULING PROBLEMS EXIST CAUSING AN EMPLOYEE TO WORK LESS THAN FORTY (40) HOURS IN A WEEK SATURDAY MAY BE USED AS A MAKE-UP DAY AT STRAIGHT TIME WAGE RATES.
AL
BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE BASED ON THE DAVIS-BACON WAGE DETERMINATION FOR THIS CRAFT.
AM
THE RATIO OF TERRAZZO FINISHER HOURS TO TERRAZZO WORKER HOURS SHALL NOT EXCEED TWO (2) TO ONE (1).
AN
INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
AO
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF, WHICH IS FACTORED IN THE OVERTIME RATES. ANY EMPLOYEE WORKING UNDERGROUND SHALL RECEIVE $1.00 PER HOUR IN ADDITION TO REGULAR WAGES.
AP
RATE APPLIES TO THE FIRST YEAR OF EMPLOYMENT ONLY: 67� AFTER 2 YEARS; 87� AFTER 8 YEARS; $1.07 AFTER 15 YEARS.
AQ
RATE APPLIES TO ALL TIME WORKED IN EXCESS OF 8 HOURS PER DAY OR 40 HOURS PER WEEK AND FOR ALL HOURS ON SUNDAY. DOUBLE-TIME IS PAID FOR WORK ON HOLIDAYS. RATE DOES NOT INCLUDE ANY ADDITIONAL AMOUNT THAT MAY BE REQUIRED FOR VACATION/HOLIDAY PAYMENT.
AR
RATE APPLIES TO THE FIRST YEAR OF EMPLOYMENT ONLY: 70� AFTER 2 YEARS; 92� AFTER 8 YEARS; $1.13 AFTER 15 YEARS.
AS
RATE APPLIES TO FIRST YEAR OF EMPLOYMENT ONLY. $0.59 AFTER 2 YEARS; $0.76 AFTER 8 YEARS; $0.94 AFTER 15 YEARS.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH THE DIRECTOR OF INDUSTRIAL RELATIONS. IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE. YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

TRAVEL AND/OR SUBSISTENCE: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH WORKER TO EXECUTE THE WORK. YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

Return to main page