GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: TULARE COUNTY

DETERMINATION: TUL-2016-1

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE DATE OF NEXT INCREASE 1 AMOUNT OF INCREASE 1 INCREASE FOOTNOTE 1 DATE OF NEXT INCREASE 2 AMOUNT OF INCREASE 2 INCREASE FOOTNOTE 2 DATE OF NEXT INCREASE 3 AMOUNT OF INCREASE 3 INCREASE FOOTNOTE 3 DATE OF NEXT INCREASE 4 AMOUNT OF INCREASE 4 INCREASE FOOTNOTE 4 DATE OF NEXT INCREASE 5 AMOUNT OF INCREASE 5 INCREASE FOOTNOTE 5
CARPET, LINOLEUM, RESILIENT TILE LAYER 02/22/2016 12/31/2016** 01/01/2017 $1.250 A 01/01/2018 $1.250 A
ELECTRICIAN: COMM & SYSTEM INSTALLER 02/22/2016 11/30/2016** 12/01/2016 $1.760 A
ELECTRICIAN: COMM & SYSTEM TECH. 02/22/2016 11/30/2016** 12/01/2016 $2.000 A
ELECTRICIAN: INSIDE WIREMAN, TECHNICIAN 02/22/2016 08/31/2016** 09/01/2016 $0.770 B 03/01/2017 $0.770 B 09/01/2017 $0.770 B 03/01/2018 $0.770 B
ELECTRICIAN: CABLE SPLICER 02/22/2016 08/31/2016** 09/01/2016 $0.770 B 03/01/2017 $0.770 B 09/01/2017 $0.770 B 03/01/2018 $0.770 B
FIELD SURVEYOR: CHIEF OF PARTY C 02/22/2016 02/28/2017** 03/01/2017 $2.000 A
FIELD SURVEYOR: INSTRUMENTMAN C 02/22/2016 02/28/2017** 03/01/2017 $2.000 A
FIELD SURVEYOR: CHAINMAN/RODMAN C 02/22/2016 02/28/2017** 03/01/2017 $2.000 A
MARBLE FINISHER D 08/22/2015 07/31/2016** 08/01/2016 $1.300 A 02/01/2017 $0.050 A 08/01/2017 $1.850 A 08/01/2018 $2.200 A
PAINTER TAPER 02/22/2016 12/31/2016** 01/01/2017 $3.560 A 01/01/2018 $3.000 A
PAINTER: 02/22/2016 12/31/2016** 01/01/2017 $1.650 A 07/01/2017 $0.500 A
PAINTER: PAPERHANGER, SPRAY PAINTER 02/22/2016 12/31/2016** 01/01/2017 $1.650 A 07/01/2017 $0.500 A
PAINTER: SANDBLASTER 02/22/2016 12/31/2016** 01/01/2017 $1.650 A 07/01/2017 $0.500 A
PAINTER: REMEDIAL PATCHER 02/22/2016 12/31/2016** 01/01/2017 $1.650 A 07/01/2017 $0.500 A
PLASTERER 08/22/2015 06/30/2016** 07/01/2016 $2.910 A
PLASTER TENDER 08/22/2015 06/30/2016** 07/01/2016 $1.500 A 07/01/2017 $1.600 A 07/01/2018 $1.650 A
PLUMBER: PLUMBER, STEAMFITTER, REFRIGERATION FITTER (HVAC) 02/22/2016 06/30/2016** 07/01/2016 $1.000 A 01/01/2017 $1.250 A 07/01/2017 $1.250 A 01/01/2018 $1.250 A 07/01/2018 $1.250 A
PLUMBER: UNDERGROUND UTILITY PIPEFITTER 08/22/2015 06/30/2016** 07/01/2016 $0.800 E
PLUMBER: LANDSCAPE PIPEFITTER 08/22/2015 06/30/2016** 07/01/2016 $0.800 E
PLUMBER: UNDERGROUND UTILITY ASSISTANT JOURNEYMAN F 08/22/2015 06/30/2016** 07/01/2016 $0.800 E
PLUMBER: LANDSCAPE ASSISTANT JOURNEYMAN F 08/22/2015 06/30/2016** 07/01/2016 $0.800 E
PLUMBER: UNDERGROUND UTILITY TRADESMAN G 08/22/2015 06/30/2016** 07/01/2016 $0.800 E
PLUMBER: LANDSCAPE TRADESMAN I H 08/22/2015 06/30/2016** 07/01/2016 $0.800 E
PLUMBER: LANDSCAPE TRADESMAN II H 08/22/2015 06/30/2016** 07/01/2016 $0.800 E
TERRAZZO FINISHER I 02/22/2016 06/30/2016** 07/01/2016 $1.000 A 07/01/2017 $1.000 A 07/01/2018 $1.250 A
TERRAZZO WORKER I 02/22/2016 06/30/2016** 07/01/2016 $1.500 A 07/01/2017 $1.750 A 07/01/2018 $2.000 A

Return to wage page

FOOTNOTES

**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
A
THE PREDETERMINED INCREASE SHOWN IS TO BE ALLOCATED TO WAGES AND/OR EMPLOYER PAYMENTS. PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 WHEN THE PREDETERMINED INCREASE BECOMES DUE TO CONFIRM THE DISTRIBUTION. PLEASE ALSO EXAMINE THE IMPORTANT NOTICES TO SEE IF ANY MODIFICATIONS HAVE BEEN ISSUED, AS THERE MAY BE REDUCTIONS TO PREDETERMINED INCREASES.
B
$0.75 TO THE BASIC HOURLY RATE AND $0.02 TO NEBF.
C
ALL CREWS, WITHOUT CONSIDERATION TO THE NUMBER OF INDIVIDUALS IN THE CREW, SHALL INCLUDE A CHIEF OF PARTY. A CREW CONSISTS OF ONE (1) OR MORE EMPLOYEES PERFORMING FIELD AND CONSTRUCTION SURVEY WORK.
D
EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFFOLD SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.
E
$0.10 TO THE BASIC HOURLY RATE, $0.60 TO HEALTH AND WELFARE, AND $0.10 TO VACATION
F
THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE.
G
THERE SHALL BE NO MORE THAN THREE TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON EACH JOBSITE.
H
THERE SHALL BE NO MORE THAN FOUR TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON EACH JOBSITE. MAINTENANCE WORK, BOTH DURING AND AFTER THE PLANT ESTABLISHMENT PERIOD, MAY BE PERFORMED BY LANDSCAPE TRADESMEN WITHOUT THE SUPERVISION OF A JOURNEYMAN PIPEFITTER.
I
THE RATIO OF TERRAZZO FINISHER HOURS TO TERRAZZO WORKER HOURS SHALL NOT EXCEED TWO (2) TO ONE (1).

Return to main page