GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: ALAMEDA COUNTY

DETERMINATION: ALA-2016-1

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE BASIC HOURLY RATE BASIC HOURLY RATE FOOTNOTE HEALTH AND WELFARE HEALTH AND WELFARE FOOTNOTE PENSION PENSION FOOTNOTE VACATION/ HOLIDAY VACATION/ HOLIDAY FOOTNOTE TRAINING TRAINING FOOTNOTE OTHER PAYMENTS OTHER PAYMENTS FOOTNOTE HOURS HOURS FOOTNOTE TOTAL HOURLY RATE DAILY OVERTIME HOURLY RATE DAILY OVERTIME HOURLY RATE FOOTNOTE SATURDAY OVERTIME HOURLY RATE SATURDAY OVERTIME HOURLY RATE FOOTNOTE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE FOOTNOTE HOLIDAY PROVISIONS SCOPE OF WORK PROVISIONS TRAVEL & SUBSISTENCE PROVISIONS
#BRICKLAYER, BLOCKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON 02/22/2016 04/30/2016** $38.800 A $9.790 $10.040 $3.000 B $0.800 $1.270 C 8 D $63.700 $84.600 E $84.600 E $105.500 HolidaysScope of WorkTravel & Subsistence
BRICKLAYER, BLOCKLAYER: POINTER, CLEANER, CAULKER, WATERPROOFER 08/22/2015 06/30/2016** $43.390 A $9.790 $10.790 $0.000 F $1.460 $0.400 8 D $65.830 $87.520 $87.520 G $109.220 HolidaysScope of WorkTravel & Subsistence
#BRICK TENDER 08/22/2015 04/30/2016** $32.180 A $10.000 $10.100 $0.000 F $0.390 $0.000 8 $52.670 $68.760 H $68.760 H $84.850 HolidaysScope of WorkTravel & Subsistence
#CARPET, LINOLEUM, SOFT FLOOR LAYER 02/22/2016 12/31/2016** $46.820 A $9.950 $12.580 $0.000 I $0.630 $0.340 8 $70.320 $93.730 J $93.730 J $117.140 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, FLOOR COVERING HANDLER AFTER 3 YEARS 02/22/2016 12/31/2016** $23.390 A $9.950 $6.290 $0.000 I $0.050 $0.340 8 $40.020 $51.710 J $51.710 J $63.410 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, FLOOR COVERING HANDLER LESS THAN 3 YEARS 02/22/2016 12/31/2016** $18.700 A $9.950 $5.030 $0.000 I $0.050 $0.340 8 $34.070 $43.420 J $43.420 J $52.770 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, FLOOR COVERING HANDLER TRAINEE, FIRST 3 MONTHS 02/22/2016 12/31/2016** $14.950 A $9.950 $4.020 $0.000 I $0.050 $0.340 8 $29.310 $36.780 J $36.780 J $44.260 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, FLOOR COVERING HANDLER TRAINEE, SECOND 3 MONTHS 02/22/2016 12/31/2016** $16.830 A $9.950 $4.530 $0.000 I $0.050 $0.340 8 $31.700 $40.110 J $40.110 J $48.530 HolidaysScope of WorkTravel & Subsistence
#ELECTRICIAN: COMM & SYSTEM INSTALLER 02/22/2016 11/30/2016** $34.320 $10.050 $5.150 K $0.000 $1.100 $0.210 L 8 $52.030 $69.790 M $69.790 M $87.550 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: COMM & SYSTEM TECH. 02/22/2016 11/30/2016** $39.080 $10.050 $5.150 K $0.000 $1.100 $0.210 L 8 $56.960 $77.190 M $77.190 M $97.410 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: INSIDE WIREMAN, 08/22/2015 05/31/2016* $50.400 $16.910 $13.120 N $0.000 F $1.810 $1.120 O 8 $84.870 $111.090 P $137.310 $137.310 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: CABLE SPLICER-WELDER 08/22/2015 05/31/2016* $56.700 $16.910 $13.120 N $0.000 F $1.810 $1.190 O 8 $91.430 $120.930 P $150.430 $150.430 HolidaysScope of WorkTravel & Subsistence
#FIELD SURVEYOR: CHIEF OF PARTY Q 02/22/2016 02/28/2017** $38.750 $13.380 $11.280 R $3.690 S $0.820 $0.160 8 $68.080 $87.460 T $87.460 U $106.830 HolidaysScope of WorkTravel & Subsistence
FIELD SURVEYOR: INSTRUMENTMAN Q 02/22/2016 02/28/2017** $35.660 $13.380 $11.280 R $3.690 S $0.820 $0.160 8 $64.990 $82.820 T $82.820 U $100.650 HolidaysScope of WorkTravel & Subsistence
FIELD SURVEYOR: CHAINMAN/RODMAN Q 02/22/2016 02/28/2017** $32.780 $13.380 $11.280 R $3.690 S $0.820 $0.160 8 $62.110 $78.500 T $78.500 U $94.890 HolidaysScope of WorkTravel & Subsistence
#GLAZIER 02/22/2016 12/31/2016** $44.530 A $9.950 $15.390 V $0.000 $0.550 $0.380 W 8 $70.800 $93.070 X $115.330 $115.330 HolidaysScope of WorkTravel & Subsistence
#MARBLE FINISHER Y 08/22/2015 07/31/2016** $30.220 Z $9.790 $3.930 $0.000 I $0.450 $0.550 8 $44.940 $60.050 AA $75.160 $75.160 HolidaysScope of WorkTravel & Subsistence
#MARBLE MASON Y 08/22/2015 07/31/2016** $40.410 Z $9.790 $14.390 $0.000 I $0.800 $0.770 8 $66.160 $86.360 AA $106.570 $106.570 HolidaysScope of WorkTravel & Subsistence
#PAINTER: BRUSH AND SPRAY 02/22/2016 12/31/2016** $37.750 AB $9.950 $11.640 R $0.000 I $0.550 $0.380 8 D $60.270 $79.150 $79.150 AC $98.020 HolidaysScope of WorkTravel & Subsistence
PAINTER: INDUSTRIAL PAINTER 02/22/2016 12/31/2016** $38.250 AB $9.950 $11.640 R $0.000 I $0.550 $0.380 8 D $60.770 $79.900 $79.900 AC $99.020 HolidaysScope of WorkTravel & Subsistence
PAINTER: SANDBLASTER, STEAM CLEANER, WATERBLASTER 02/22/2016 12/31/2016** $38.250 AB $9.950 $11.640 R $0.000 I $0.550 $0.380 8 D $60.770 $79.900 $79.900 AC $99.020 HolidaysScope of WorkTravel & Subsistence
PAINTER: EXOTIC MATERIALS 02/22/2016 12/31/2016** $38.500 AB $9.950 $11.640 R $0.000 I $0.550 $0.380 8 D $61.020 $80.270 $80.270 AC $99.520 HolidaysScope of WorkTravel & Subsistence
PAINTER: PAPERHANGER/WALLCOVERING 02/22/2016 12/31/2016** $38.750 AB $9.950 $11.640 R $0.000 I $0.550 $0.380 8 D $61.270 $80.650 $80.650 AC $100.020 HolidaysScope of WorkTravel & Subsistence
PAINTER: TAPER 02/22/2016 06/30/2016** $42.790 AD $9.950 $12.500 $0.000 I $0.460 $0.540 8 $66.240 $87.630 $87.630 D $109.030 AC HolidaysScope of WorkTravel & Subsistence
PAINTER: TAPER CLEAN-UP AE 02/22/2016 06/30/2016* $17.090 AF $9.950 $0.000 $0.000 $0.000 $0.000 8 $27.040 $35.580 $35.580 D $44.130 AC HolidaysScope of WorkTravel & Subsistence
#PLASTERER 08/22/2015 06/30/2016** $38.490 AG $13.030 $10.630 $0.000 F $1.090 $1.050 8 D $64.290 $80.920 AH $80.920 AH $97.540 HolidaysScope of WorkTravel & Subsistence
#PLASTER TENDER AI 08/22/2015 06/30/2016* $32.400 AJ $9.330 $12.770 $0.000 F $0.340 $0.580 8 $55.420 $69.070 AK $69.070 AK $82.720 HolidaysScope of WorkTravel & Subsistence
PLASTER TENDER GUN MAN AI 08/22/2015 06/30/2016* $33.150 AJ $9.330 $12.770 $0.000 F $0.340 $0.580 8 $56.170 $70.190 AK $70.190 AK $84.220 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: PLUMBER, PIPEFITTER, STEAMFITTER 08/22/2015 06/30/2016** $53.460 A $17.550 AL $13.840 AM $0.000 $3.700 $0.300 8 $94.350 $123.830 E $123.830 E $153.310 HolidaysScope of WorkTravel & Subsistence
PLUMBER: UNDERGROUND UTILITY PIPEFITTER 08/22/2015 06/30/2016** $26.600 $6.600 $3.000 AN $2.000 $0.450 $0.600 8 D $39.250 $52.550 $52.550 $65.850 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE PIPEFITTER 08/22/2015 06/30/2016** $26.600 $6.600 $3.000 AN $2.000 $0.450 $0.600 8 D $39.250 $52.550 $52.550 $65.850 HolidaysScope of WorkTravel & Subsistence
PLUMBER: UNDERGROUND UTILITY ASSISTANT JOURNEYMAN AO 08/22/2015 06/30/2016** $15.600 $6.600 $3.000 AN $2.000 $0.450 $0.600 8 D $28.250 $36.050 $36.050 $43.850 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE ASSISTANT JOURNEYMAN AO 08/22/2015 06/30/2016** $15.600 $6.600 $3.000 AN $2.000 $0.450 $0.600 8 D $28.250 $36.050 $36.050 $43.850 HolidaysScope of WorkTravel & Subsistence
PLUMBER: UNDERGROUND UTILITY TRADESMAN AP 08/22/2015 06/30/2016** $10.900 $6.600 $3.000 AN $2.000 $0.450 $0.600 8 D $23.550 $29.000 $29.000 $34.450 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE TRADESMAN I AQ 08/22/2015 06/30/2016** $10.550 $6.600 $0.000 AN $2.000 $0.450 $0.600 8 D $20.200 $25.480 $25.480 $30.750 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE TRADESMAN II AQ 08/22/2015 06/30/2016** $10.900 $6.600 $3.000 AN $2.000 $0.450 $0.600 8 D $23.550 $29.000 $29.000 $34.450 HolidaysScope of WorkTravel & Subsistence
PLUMBER: SPRINKLER FITTER (FIRE PROTECTION AND FIRE CONTROL SYSTEMS) 02/22/2016 07/31/2016** $56.120 A $10.020 $16.550 $0.000 F $1.100 $0.400 8 $84.190 $112.250 $112.250 $140.310 HolidaysScope of WorkTravel & Subsistence
#ROOFER 08/22/2015 07/31/2016** $32.470 $8.420 $5.630 $3.610 $0.850 $0.640 8 $51.620 $67.860 J $67.860 AR $84.090 HolidaysScope of WorkTravel & Subsistence
ROOFER BITUMASTIC, ENAMELER, PIPE WRAPPER, COAL TAR PITCH BUILD-UP 08/22/2015 07/31/2016** $34.470 $8.420 $5.630 $3.610 $0.850 $0.640 8 $53.620 $70.860 J $70.860 AR $88.090 HolidaysScope of WorkTravel & Subsistence
ROOFER MASTIC WORKER, KETTLEMAN 08/22/2015 07/31/2016** $32.720 $8.420 $5.630 $3.610 $0.850 $0.640 8 $51.870 $68.230 J $68.230 AR $84.590 HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER 08/22/2015 06/26/2016* $52.200 AB $13.460 AS $26.420 AT $0.000 F $1.410 $1.150 8 $94.640 $123.640 AU $123.640 AU $152.640 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER TOTAL SHEET METAL CONTRACT OF $200000 OR LESS 08/22/2015 06/26/2016* $46.300 AB $13.460 AS $25.140 AT $0.000 F $1.410 $1.150 8 $87.460 $113.190 AU $113.190 AU $138.910 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER SERVICE MECHANIC (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2015 06/26/2016* $35.720 AB $12.940 AV $14.680 AT $0.000 F $1.310 $1.150 8 $65.800 $84.910 AW $84.910 AW $104.020 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER SERVICE TECHNICIAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2015 06/26/2016* $32.370 AB $12.940 AV $9.410 AT $0.000 F $1.310 $1.150 8 $57.180 $74.160 AW $74.160 AW $91.150 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER AIR CONDITIONING SPECIALIST (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2015 06/26/2016* $28.810 AB $12.940 AV $4.330 AT $0.000 F $1.290 $1.150 8 $48.520 $63.380 AU $63.380 AU $78.230 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER AIR CONDITIONING JOURNEYMAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2015 06/26/2016* $33.510 AB $12.960 AS $9.690 AT $0.000 F $1.290 $1.150 8 $58.600 $76.100 AU $76.100 AU $93.610 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER METAL DECK & SIDING 02/22/2015 06/30/2015* $33.860 AB $13.530 AN $18.000 AX $0.000 F $0.300 AY $0.000 8 $65.690 $83.620 AU $83.620 AU $101.550 HolidaysScope of WorkTravel & Subsistence
#TERRAZZO FINISHER AZ 02/22/2016 06/30/2016** $33.780 BA $9.790 $5.140 $0.000 F $0.800 $0.830 8 $50.340 $65.120 AU $65.120 AU $79.900 HolidaysScope of WorkTravel & Subsistence
#TERRAZZO WORKER AZ 02/22/2016 06/30/2016** $41.010 BA $9.790 $14.940 $0.000 F $0.800 $1.010 8 $67.550 $85.370 AU $85.370 AU $103.190 HolidaysScope of WorkTravel & Subsistence
#TILE FINISHER 08/22/2015 03/31/2016* $22.790 BB $8.830 $3.460 $0.700 $0.450 $1.130 8 $37.360 $48.760 $48.760 D $60.150 HolidaysScope of WorkTravel & Subsistence
TILE FINISHER RED CIRCLED FINISHER 08/22/2015 03/31/2016* $28.480 BB $8.830 $3.690 $1.300 $0.350 $1.140 8 $43.790 $58.030 $58.030 D $72.270 HolidaysScope of WorkTravel & Subsistence
#TILE SETTER 08/22/2015 03/31/2016* $39.520 BB $8.830 $4.690 $2.350 $0.690 $1.730 8 $57.810 $77.570 $77.570 D $97.330 HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER 08/22/1998 12/31/1998* $12.700 $3.200 $0.780 $0.630 BC $0.000 $0.000 8 $17.310 $23.660 BD $23.660 BD $23.660 BD HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER PUMP INSTALLER 08/22/1998 12/31/1998* $12.700 $3.200 $0.780 $0.630 BC $0.000 $0.000 8 $17.310 $23.660 BD $23.660 BD $23.660 BD HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER HELPER 08/22/1998 12/31/1998* $10.380 $3.200 $0.780 $0.520 BE $0.000 $0.000 8 $14.880 $20.070 BD $20.070 BD $20.070 BD HolidaysScope of WorkTravel & Subsistence

Go to increase page

FOOTNOTES

*
EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
#
INDICATES AN APPRENTICEABLE CRAFT. THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @ HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.
&
THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.
A
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
B
INCLUDES AN AMOUNT FACTORED AT THE OVERTIME MULTIPLIER RATE.
C
INCLUDES AMOUNT FOR INDUSTRY PROMOTION FUND, INTERNATIONAL MASONRY INSTITUTE, LABOR MANAGEMENT COOPERATION COMMITTEE, AND VACATION TRUST FUND.
D
SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
E
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
F
INCLUDED IN STRAIGHT-TIME HOURLY RATE.
G
RATE APPLIES TO THE FIRST 10 HOURS WORKED ON SATURDAY. ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
H
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
I
INCLUDED IN BASIC HOURLY RATE.
J
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
K
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD.
L
IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES.
M
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
N
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
O
INCLUDES AN AMOUNT (1.05% OF THE BASIC HOURLY RATE) FOR THE CONTRACT ADMINISTRATION FUND, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER.
P
THIS APPLIES TO DAILY OVERTIME RATE FOR THE FIRST SHIFT IN A MULTISHIFT OPERATION AND THE FIRST 2 HOURS OF DAILY OVERTIME FOR NON-SHIFT WORK. ALL OTHER NON-SHIFT WORK IS PAID AT THE SATURDAY, SUNDAY AND HOLIDAY RATE.
Q
ALL CREWS, WITHOUT CONSIDERATION TO THE NUMBER OF INDIVIDUALS IN THE CREW, SHALL INCLUDE A CHIEF OF PARTY. A CREW CONSISTS OF ONE (1) OR MORE EMPLOYEES PERFORMING FIELD AND CONSTRUCTION SURVEY WORK.
R
INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
S
INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.
T
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS, MONDAY THROUGH FRIDAY. ALL OTHER OVERTIME IS PAID AT THE SUNDAY/HOLIDAY RATE.
U
RATE APPLIES TO THE FIRST 12 OVERTIME HOURS WORKED. ALL OTHER OVERTIME IS PAID AT THE SUNDAY/HOLIDAY RATE. IN THE EVENT IT IS NOT REASONABLY POSSIBLE TO COMPLETE 40 HOURS OF WORK ON AN 8 HOUR DAY, MONDAY THROUGH FRIDAY, THEN THE BALANCE OF THE 40 HOURS, UP TO 8 HOURS, MAY BE WORKED ON SATURDAY AT THE STRAIGHT-TIME RATE.
V
INCLUDES AN AMOUNT PER HOUR WORKED FOR IUPAT, IARP, AND RETIREE PENSION.
W
INCLUDES AMOUNTS FOR INDUSTRY FUND, WORK PRESERVATION FUND, AND LABOR MANAGEMENT COOPERATION INITIATIVE
X
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND FIRST 8 HOURS WORKED ON DESIGNATED DAYS OFF; ALL OTHER TIME IS PAID AT THE SATURDAY, SUNDAY AND HOLIDAY OVERTIME RATE.
Y
EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFFOLD SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.
Z
INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.
AA
RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
AB
INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
AC
DESIGNATED DAYS OFF SHALL BE PAID AT THE SATURDAY OVERTIME RATE; PLEASE REFER TO THE HOLIDAY PROVISIONS FOR A LIST OF DESIGNATED DAYS OFF.
AD
INCLUDES AMOUNTS FOR VACATION AND DUES CHECK OFF
AE
PLEASE NOTE THAT THE TAPER CLEAN-UP APPLIES ONLY TO THE TAPER CLASSIFICATION.
AF
INCLUDES AN AMOUNT FOR DUES CHECK OFF
AG
INCLUDE AMOUNTS WITHHELD FOR DUES CHECK OFF AND VACATION WHICH IS NOT FACTORED INTO OVERTIME. EMPLOYEES OPERATING AND WORKING BEHIND PLASTER GUNS SHALL RECEIVE AN ADDITIONAL $5.00 PER DAY ABOVE THE WAGE RATE. EMPLOYEES WORKING ON AN EXTERIOR SUSPENDED SCAFFOLD SHALL BE PAID AN ADDITIONAL $10.00 PER DAY ABOVE THE WAGE RATE.
AH
RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAYS AND DESIGNATED DAYS OFF. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
AI
ALL HOD CARRIERS WORKING ON THE HOSE SHALL RECEIVE $5.00 PER DAY OVER SCALE.
AJ
INCLUDES AN AMOUNT FOR VACATION, DUES CHECK-OFF AND ORGANIZING DUES WHICH ARE NOT FACTORED INTO OVERTIME.
AK
RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
AL
IN ADDITION, AN AMOUNT OF $0.50 FOR HEALTH REIMBURSEMENT ACCOUNT IS ADDED TO THE TOTAL HOURLY RATE AND FACTORED INTO OVERTIME. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AM
IN ADDITION, AN AMOUNT OF $5.00 FOR 401A SUPPLEMENTAL PENSION IS ADDED TO THE TOTAL HOURLY RATE AND FACTORED INTO OVERTIME. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AN
PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AO
THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE.
AP
THERE SHALL BE NO MORE THAN THREE TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON EACH JOBSITE.
AQ
THERE SHALL BE NO MORE THAN FOUR TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON EACH JOBSITE. MAINTENANCE WORK, BOTH DURING AND AFTER THE PLANT ESTABLISHMENT PERIOD, MAY BE PERFORMED BY LANDSCAPE TRADESMEN WITHOUT THE SUPERVISION OF A JOURNEYMAN PIPEFITTER.
AR
APPLIES TO THE FIRST 12 HOURS WORKED ON SATURDAY. ALL OTHER OVERTIME IS PAID AT THE SUNDAY/HOLIDAY RATE. IN THE EVENT THAT CONDITIONS OVER WHICH THE ROOFING CONTRACTOR HAS NO CONTROL (I.E. ADVERSE WEATHER, PROJECT DELAYS, LOGISTICAL PROBLEMS, GENERAL CONTRACTOR OR BUILDING OWNER REQUIREMENTS, ETC.) PREVENT EMPLOYEES FROM WORKING ON ONE OR MORE DAYS DURING THE REGULAR WORK WEEK, WORK PERFORMED ON SATURDAY MAY BE PAID AT THE STRAIGHT TIME RATES.
AS
INCLUDES SMOHIT AND SHC. EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AT
INCLUDES AN AMOUNT FOR PENSION WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AU
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AV
INCLUDES SHC. EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AW
RATE APPLIES TO FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY DURING THE EMPLOYEES NORMAL WORKING HOURS. ALL OTHER OVERTIME HOURS SHALL BE PAID AT THE SUNDAY AND HOLIDAY DOUBLE TIME RATE.
AX
INCLUDES AN AMOUNT FOR PENSION FACTORED AT THE OVERTIME MULTIPLIER RATE.
AY
INCLUDES $0.03 FOR SCHOLAR FUND.
AZ
THE RATIO OF TERRAZZO FINISHER HOURS TO TERRAZZO WORKER HOURS SHALL NOT EXCEED TWO (2) TO ONE (1).
BA
INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
BB
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF, WHICH IS FACTORED IN THE OVERTIME RATES. ANY EMPLOYEE WORKING UNDERGROUND SHALL RECEIVE $1.00 PER HOUR IN ADDITION TO REGULAR WAGES.
BC
RATE APPLIES TO FIRST YEAR OF EMPLOYMENT ONLY; $0.88 AFTER 2 YEARS OF EMPLOYMENT.
BD
RATE APPLIES TO ALL TIME WORKED IN EXCESS OF 8 HOURS PER DAY OR 40 HOURS PER WEEK AND FOR ALL HOURS ON SUNDAYS AND HOLIDAYS. RATE DOES NOT INCLUDE ANY ADDITIONAL AMOUNT THAT MAY BE REQUIRED FOR VACATION/HOLIDAY PAYMENT.
BE
RATE APPLIES TO FIRST YEAR OF EMPLOYMENT ONLY; $0.72 AFTER 2 YEARS OF EMPLOYMENT.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH THE DIRECTOR OF INDUSTRIAL RELATIONS. IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE. YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

TRAVEL AND/OR SUBSISTENCE: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH WORKER TO EXECUTE THE WORK. YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

Return to main page