GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: SOLANO COUNTY

DETERMINATION: SOL-2016-2

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE BASIC HOURLY RATE BASIC HOURLY RATE FOOTNOTE HEALTH AND WELFARE HEALTH AND WELFARE FOOTNOTE PENSION PENSION FOOTNOTE VACATION/ HOLIDAY VACATION/ HOLIDAY FOOTNOTE TRAINING TRAINING FOOTNOTE OTHER PAYMENTS OTHER PAYMENTS FOOTNOTE HOURS HOURS FOOTNOTE TOTAL HOURLY RATE DAILY OVERTIME HOURLY RATE DAILY OVERTIME HOURLY RATE FOOTNOTE SATURDAY OVERTIME HOURLY RATE SATURDAY OVERTIME HOURLY RATE FOOTNOTE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE FOOTNOTE HOLIDAY PROVISIONS SCOPE OF WORK PROVISIONS TRAVEL & SUBSISTENCE PROVISIONS
#BRICKLAYER, BLOCKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON 08/22/2016 04/30/2017** $37.890 A $9.850 $14.160 $3.000 B $0.800 $1.300 C 8 D $67.000 $87.440 E $87.440 E $107.890 HolidaysScope of WorkTravel & Subsistence
BRICKLAYER, BLOCKLAYER: POINTER, CLEANER, CAULKER, WATERPROOFER 08/22/2016 06/30/2017** $44.580 A $9.850 $11.320 $0.000 F $1.480 $0.400 8 D $67.630 $89.920 $89.920 G $112.210 HolidaysScope of WorkTravel & Subsistence
#BRICK TENDER 08/22/2016 06/30/2017** $33.020 H $7.840 $10.340 $0.000 F $0.450 $0.300 8 D $51.950 $68.460 E $68.460 E $84.970 HolidaysScope of WorkTravel & Subsistence
#CARPET, LINOLEUM, SOFT FLOOR LAYER 02/22/2016 12/31/2016** $46.820 A $9.950 $12.580 $0.000 I $0.630 $0.340 8 $70.320 $93.730 J $93.730 J $117.140 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, FLOOR COVERING HANDLER AFTER 3 YEARS 02/22/2016 12/31/2016** $23.390 A $9.950 $6.290 $0.000 I $0.050 $0.340 8 $40.020 $51.710 J $51.710 J $63.410 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, FLOOR COVERING HANDLER LESS THAN 3 YEARS 02/22/2016 12/31/2016** $18.700 A $9.950 $5.030 $0.000 I $0.050 $0.340 8 $34.070 $43.420 J $43.420 J $52.770 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, FLOOR COVERING HANDLER TRAINEE, FIRST 3 MONTHS 02/22/2016 12/31/2016** $14.950 A $9.950 $4.020 $0.000 I $0.050 $0.340 8 $29.310 $36.780 J $36.780 J $44.260 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, FLOOR COVERING HANDLER TRAINEE, SECOND 3 MONTHS 02/22/2016 12/31/2016** $16.830 A $9.950 $4.530 $0.000 I $0.050 $0.340 8 $31.700 $40.110 J $40.110 J $48.530 HolidaysScope of WorkTravel & Subsistence
#ELECTRICIAN: COMM & SYSTEM INSTALLER 02/22/2016 11/30/2016** $34.320 $10.050 $5.150 K $0.000 $1.100 $0.210 L 8 $52.030 $69.790 M $69.790 M $87.550 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: COMM & SYSTEM TECH. 02/22/2016 11/30/2016** $39.080 $10.050 $5.150 K $0.000 $1.100 $0.210 L 8 $56.960 $77.190 M $77.190 M $97.410 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: INSIDE WIREMAN, TECHNICIAN 08/22/2016 05/31/2017** $46.210 A $13.200 N $6.550 O $0.000 $1.380 $1.070 P 8 $69.990 $94.320 E $94.320 E $118.650 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: CABLE SPLICER 08/22/2016 05/31/2017** $52.000 A $13.200 N $6.550 O $0.000 $1.380 $1.210 P 8 $76.090 $103.470 E $103.470 E $130.860 HolidaysScope of WorkTravel & Subsistence
#FIELD SURVEYOR: CHIEF OF PARTY Q 02/22/2016 02/28/2017** $38.750 $13.380 $11.280 R $3.690 S $0.820 $0.160 8 $68.080 $87.460 T $87.460 U $106.830 HolidaysScope of WorkTravel & Subsistence
FIELD SURVEYOR: INSTRUMENTMAN Q 02/22/2016 02/28/2017** $35.660 $13.380 $11.280 R $3.690 S $0.820 $0.160 8 $64.990 $82.820 T $82.820 U $100.650 HolidaysScope of WorkTravel & Subsistence
FIELD SURVEYOR: CHAINMAN/RODMAN Q 02/22/2016 02/28/2017** $32.780 $13.380 $11.280 R $3.690 S $0.820 $0.160 8 $62.110 $78.500 T $78.500 U $94.890 HolidaysScope of WorkTravel & Subsistence
#GLAZIER V 02/22/2016 12/31/2016** $44.530 A $9.950 $15.390 W $0.000 $0.550 $0.380 X 8 $70.800 $93.070 Y $115.330 $115.330 HolidaysScope of WorkTravel & Subsistence
GLAZIER GLAZIER Z 02/22/2016 12/31/2016** $34.520 A $9.950 $14.010 AA $0.000 $0.590 $0.380 X 8 $59.450 $76.710 Y $93.970 $93.970 HolidaysScope of WorkTravel & Subsistence
#MARBLE FINISHER AB 08/22/2016 01/31/2017** $31.170 AC $9.850 $4.180 $0.000 I $0.450 $0.590 8 $46.240 $61.830 AD $77.410 $77.410 HolidaysScope of WorkTravel & Subsistence
#MARBLE MASON AB 08/22/2016 01/31/2017** $41.770 AC $9.850 $15.020 $0.000 I $0.800 $0.820 8 $68.260 $89.140 AD $110.030 $110.030 HolidaysScope of WorkTravel & Subsistence
#PAINTER: BRUSH AND SPRAY 02/22/2016 12/31/2016** $37.750 H $9.950 $11.640 R $0.000 I $0.550 $0.380 8 D $60.270 $79.150 $79.150 AE $98.020 HolidaysScope of WorkTravel & Subsistence
PAINTER: INDUSTRIAL PAINTER 02/22/2016 12/31/2016** $38.250 H $9.950 $11.640 R $0.000 I $0.550 $0.380 8 D $60.770 $79.900 $79.900 AE $99.020 HolidaysScope of WorkTravel & Subsistence
PAINTER: SANDBLASTER, STEAM CLEANER, WATERBLASTER 02/22/2016 12/31/2016** $38.250 H $9.950 $11.640 R $0.000 I $0.550 $0.380 8 D $60.770 $79.900 $79.900 AE $99.020 HolidaysScope of WorkTravel & Subsistence
PAINTER: EXOTIC MATERIALS 02/22/2016 12/31/2016** $38.500 H $9.950 $11.640 R $0.000 I $0.550 $0.380 8 D $61.020 $80.270 $80.270 AE $99.520 HolidaysScope of WorkTravel & Subsistence
PAINTER: PAPERHANGER/WALLCOVERING 02/22/2016 12/31/2016** $38.750 H $9.950 $11.640 R $0.000 I $0.550 $0.380 8 D $61.270 $80.650 $80.650 AE $100.020 HolidaysScope of WorkTravel & Subsistence
PAINTER: TAPER 08/22/2016 12/31/2016** $43.740 AF $9.950 $13.500 $0.000 I $0.560 $0.540 8 $68.290 $90.160 $90.160 D $112.030 AE HolidaysScope of WorkTravel & Subsistence
PAINTER: TAPER CLEAN-UP AG 08/22/2016 12/31/2016* $17.470 AH $9.950 $0.000 $0.000 $0.000 $0.000 8 $27.420 $36.150 $36.150 D $44.890 AE HolidaysScope of WorkTravel & Subsistence
#PLASTERER 08/22/2016 06/30/2017* $31.580 AI $13.280 $10.000 $3.000 $1.090 $1.150 8 $60.100 $74.990 $74.990 AJ $89.870 HolidaysScope of WorkTravel & Subsistence
#PLASTER TENDER 08/22/2016 06/30/2017** $30.520 $7.840 $10.410 $2.630 $0.450 $1.030 AK 8 $52.880 $68.140 J $68.140 J $83.400 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: PLUMBER, STEAMFITTER, REFRIGERATION FITTER (HVAC) 08/22/2016 12/31/2016** $49.500 AL $16.000 $14.450 N $0.000 $1.700 $0.740 8 $82.390 $107.140 E $107.140 E $131.890 HolidaysScope of WorkTravel & Subsistence
PLUMBER: PLUMBER LIGHT COMMERCIAL FOR TOTAL PLUMBING BID OF $250000 OR LESS 02/22/2016 06/30/2016* $30.850 AL $11.700 $7.800 N $0.000 $0.900 $0.490 8 D $51.740 $67.170 E $67.170 E $82.590 HolidaysScope of WorkTravel & Subsistence
PLUMBER: UNDERGROUND UTILITY PIPEFITTER 08/22/2016 06/30/2017** $26.600 $8.600 $3.000 N $2.000 $0.450 $0.600 8 $41.250 $54.550 $54.550 D $67.850 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE PIPEFITTER 08/22/2016 06/30/2017** $26.600 $8.600 $3.000 N $2.000 $0.450 $0.600 8 $41.250 $54.550 $54.550 D $67.850 HolidaysScope of WorkTravel & Subsistence
PLUMBER: UNDERGROUND UTILITY ASSISTANT JOURNEYMAN AM 08/22/2016 06/30/2017** $15.600 $8.600 $3.000 N $2.000 $0.450 $0.600 8 $30.250 $38.050 $38.050 D $45.850 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE ASSISTANT JOURNEYMAN AM 08/22/2016 06/30/2017** $15.600 $8.600 $3.000 N $2.000 $0.450 $0.600 8 $30.250 $38.050 $38.050 D $45.850 HolidaysScope of WorkTravel & Subsistence
PLUMBER: UNDERGROUND UTILITY TRADESMAN AN 08/22/2016 06/30/2017** $12.000 $8.600 $3.000 N $2.000 $0.450 $0.600 8 $26.650 $32.650 $32.650 D $38.650 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE TRADESMAN I AO 08/22/2016 06/30/2017** $12.000 $8.600 $0.000 N $2.000 $0.450 $0.600 8 $23.650 $29.650 $29.650 D $35.650 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE TRADESMAN II AO 08/22/2016 06/30/2017** $12.000 $8.600 $3.000 N $2.000 $0.450 $0.600 8 $26.650 $32.650 $32.650 D $38.650 HolidaysScope of WorkTravel & Subsistence
PLUMBER: SPRINKLER FITTER (FIRE PROTECTION AND FIRE CONTROL SYSTEMS) 08/22/2016 12/31/2016** $59.120 A $10.020 $16.550 $0.000 F $1.100 $0.400 8 $87.190 $116.750 $116.750 $146.310 HolidaysScope of WorkTravel & Subsistence
#ROOFER 08/22/2016 07/31/2017** $33.260 $9.330 $5.930 $3.610 $0.850 $0.640 8 $53.620 $70.250 J $70.250 AP $86.880 HolidaysScope of WorkTravel & Subsistence
ROOFER BITUMASTIC, ENAMELER, PIPE WRAPPER, COAL TAR PITCH BUILD-UP 08/22/2016 07/31/2017** $35.260 $9.330 $5.930 $3.610 $0.850 $0.640 8 $55.620 $73.250 J $73.250 AP $90.880 HolidaysScope of WorkTravel & Subsistence
ROOFER MASTIC WORKER, KETTLEMAN 08/22/2016 07/31/2017** $33.510 $9.330 $5.930 $3.610 $0.850 $0.640 8 $53.870 $70.630 J $70.630 AP $87.380 HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER 08/22/2016 07/02/2017** $54.580 H $13.200 AQ $27.180 AR $0.000 F $1.420 $1.510 8 $97.890 $128.210 AS $128.210 AS $158.530 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER TOTAL SHEET METAL CONTRACT OF $200000 OR LESS 08/22/2016 07/02/2017** $48.230 H $13.200 AQ $25.850 AR $0.000 F $1.420 $1.510 8 $90.210 $117.010 AS $117.010 AS $143.800 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER SERVICE MECHANIC (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2016 07/02/2017** $37.460 H $13.050 AT $14.880 AR $0.000 F $1.320 $1.160 8 $67.870 $87.850 AU $87.850 AU $107.830 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER SERVICE TECHNICIAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2016 07/02/2017** $33.860 H $13.050 AT $9.610 AR $0.000 F $1.320 $1.160 8 $59.000 $76.730 AU $76.730 AU $94.460 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER AIR CONDITIONING SPECIALIST (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2016 07/02/2017** $30.100 H $13.050 AT $4.430 AR $0.000 F $1.300 $1.160 8 $50.040 $65.540 AS $65.540 AS $81.040 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER AIR CONDITIONING JOURNEYMAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2016 07/02/2017** $35.050 H $13.050 AQ $9.890 AR $0.000 F $1.300 $1.160 8 $60.450 $78.720 AS $78.720 AS $97.000 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER METAL DECK & SIDING 08/22/2016 06/30/2017* $35.640 H $13.980 N $19.200 AV $0.000 F $0.310 AW $0.000 8 $69.130 $87.950 AS $87.950 AS $106.770 HolidaysScope of WorkTravel & Subsistence
#TERRAZZO FINISHER AX 08/22/2016 06/30/2017** $34.430 AY $9.850 $5.420 $0.000 F $0.800 $0.840 8 $51.340 $66.430 AS $66.430 AS $81.530 HolidaysScope of WorkTravel & Subsistence
#TERRAZZO WORKER AX 08/22/2016 06/30/2017** $42.410 AY $9.850 $14.970 $0.000 F $0.800 $1.020 8 $69.050 $87.560 AS $87.560 AS $106.060 HolidaysScope of WorkTravel & Subsistence
#TILE FINISHER 08/22/2016 09/30/2016** $24.760 AZ $8.830 $3.490 $0.700 $0.520 $1.460 8 $39.760 $52.140 $52.140 D $64.520 HolidaysScope of WorkTravel & Subsistence
TILE FINISHER RED CIRCLED FINISHER 08/22/2016 09/30/2016** $30.440 AZ $8.830 $3.720 $1.300 $0.520 $1.460 8 $46.270 $61.490 $61.490 D $76.710 HolidaysScope of WorkTravel & Subsistence
#TILE SETTER 08/22/2016 09/30/2016** $41.550 AZ $8.830 $4.720 $2.350 $0.790 $2.100 8 $60.340 $81.110 $81.110 D $101.890 HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER DRILLER, PUMP REPAIRMAN 08/22/2007 01/31/2008* $20.170 $8.120 $3.690 $0.800 BA $0.000 $0.000 8 $32.780 $42.870 BB $42.870 BB $42.870 BB HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER PUMP INSTALLER 08/22/2007 01/31/2008* $17.860 $8.120 $3.690 $0.720 BC $0.000 $0.000 8 $30.390 $39.320 BB $39.320 BB $39.320 BB HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER HELPER 08/22/2007 01/31/2008* $12.470 $8.120 $3.690 $0.530 BD $0.000 $0.000 8 $24.810 $31.040 BB $31.040 BB $31.040 BB HolidaysScope of WorkTravel & Subsistence

Go to increase page

FOOTNOTES

*
EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
#
INDICATES AN APPRENTICEABLE CRAFT. THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @ HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.
&
THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.
A
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
B
VACATION IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER
C
INCLUDES AMOUNT FOR INDUSTRY PROMOTION FUND, INTERNATIONAL MASONRY INSTITUTE, LABOR MANAGEMENT COOPERATION COMMITTEE, AND VACATION TRUST FUND.
D
SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
E
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
F
INCLUDED IN STRAIGHT-TIME HOURLY RATE.
G
RATE APPLIES TO THE FIRST 10 HOURS WORKED ON SATURDAY. ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
H
INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
I
INCLUDED IN BASIC HOURLY RATE.
J
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
K
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD.
L
IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES.
M
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
N
PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
O
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
P
IN ADDITION TO THE AMOUNT SHOWN, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER FOR EACH OVERTIME HOUR, $0.19 IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE LABOR MANAGEMENT COOPERATION COMMITTEE FUND.
Q
ALL CREWS, WITHOUT CONSIDERATION TO THE NUMBER OF INDIVIDUALS IN THE CREW, SHALL INCLUDE A CHIEF OF PARTY. A CREW CONSISTS OF ONE (1) OR MORE EMPLOYEES PERFORMING FIELD AND CONSTRUCTION SURVEY WORK.
R
INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
S
INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.
T
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS, MONDAY THROUGH FRIDAY. ALL OTHER OVERTIME IS PAID AT THE SUNDAY/HOLIDAY RATE.
U
RATE APPLIES TO THE FIRST 12 OVERTIME HOURS WORKED. ALL OTHER OVERTIME IS PAID AT THE SUNDAY/HOLIDAY RATE. IN THE EVENT IT IS NOT REASONABLY POSSIBLE TO COMPLETE 40 HOURS OF WORK ON AN 8 HOUR DAY, MONDAY THROUGH FRIDAY, THEN THE BALANCE OF THE 40 HOURS, UP TO 8 HOURS, MAY BE WORKED ON SATURDAY AT THE STRAIGHT-TIME RATE.
V
RATE APPLIES TO REMAINDER OF SOLANO COUNTY, EXCEPT THE FOLLOWING CITIES: DIXON, EL MIRA, RIO VISTA, AND VACAVILLE.
W
INCLUDES AN AMOUNT PER HOUR WORKED FOR IUPAT, IARP, AND RETIREE PENSION.
X
INCLUDES AMOUNTS FOR INDUSTRY FUND, WORK PRESERVATION FUND, AND LABOR MANAGEMENT COOPERATION INITIATIVE
Y
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND FIRST 8 HOURS WORKED ON DESIGNATED DAYS OFF; ALL OTHER TIME IS PAID AT THE SATURDAY, SUNDAY AND HOLIDAY OVERTIME RATE.
Z
RATE APPLIES TO CITIES OF DIXON, ELMIRA, RIO VISTA, AND VACAVILLE.
AA
INCLUDES AN AMOUNT FOR THE INDIVIDUAL ACCOUNT RETIRMENT PLAN
AB
EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFFOLD SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.
AC
INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.
AD
RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
AE
DESIGNATED DAYS OFF SHALL BE PAID AT THE SATURDAY OVERTIME RATE; PLEASE REFER TO THE HOLIDAY PROVISIONS FOR A LIST OF DESIGNATED DAYS OFF.
AF
INCLUDES AMOUNTS FOR VACATION AND DUES CHECK OFF
AG
PLEASE NOTE THAT THE TAPER CLEAN-UP APPLIES ONLY TO THE TAPER CLASSIFICATION.
AH
INCLUDES AN AMOUNT FOR DUES CHECK OFF
AI
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF. PLASTERERS OPERATING AND WORKING BEHIND PLASTER GUNS SHALL RECEIVE AN ADDITIONAL $5.00 PER DAY ABOVE THE WAGE RATE.
AJ
RATE APPLIES TO THE FIRST 8 HOURS WORKED; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AK
AMOUNT IS FOR VALLEY MORTAR TRADES FUND ($1.00) AND INDUSTRY STABILIZATION FUND ($0.03)
AL
INCLUDES AN AMOUNT FOR DUES CHECK OFF.
AM
THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE.
AN
THERE SHALL BE NO MORE THAN THREE TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON EACH JOBSITE.
AO
THERE SHALL BE NO MORE THAN FOUR TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON EACH JOBSITE. MAINTENANCE WORK, BOTH DURING AND AFTER THE PLANT ESTABLISHMENT PERIOD, MAY BE PERFORMED BY LANDSCAPE TRADESMEN WITHOUT THE SUPERVISION OF A JOURNEYMAN PIPEFITTER.
AP
APPLIES TO THE FIRST 12 HOURS WORKED ON SATURDAY. ALL OTHER OVERTIME IS PAID AT THE SUNDAY/HOLIDAY RATE. IN THE EVENT THAT CONDITIONS OVER WHICH THE ROOFING CONTRACTOR HAS NO CONTROL (I.E. ADVERSE WEATHER, PROJECT DELAYS, LOGISTICAL PROBLEMS, GENERAL CONTRACTOR OR BUILDING OWNER REQUIREMENTS, ETC.) PREVENT EMPLOYEES FROM WORKING ON ONE OR MORE DAYS DURING THE REGULAR WORK WEEK, WORK PERFORMED ON SATURDAY MAY BE PAID AT THE STRAIGHT TIME RATES.
AQ
INCLUDES SMOHIT AND SHC. EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AR
INCLUDES AN AMOUNT FOR PENSION WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AS
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AT
INCLUDES SHC. EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AU
RATE APPLIES TO FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY DURING THE EMPLOYEES NORMAL WORKING HOURS. ALL OTHER OVERTIME HOURS SHALL BE PAID AT THE SUNDAY AND HOLIDAY DOUBLE TIME RATE.
AV
INCLUDES AN AMOUNT FOR PENSION FACTORED AT THE OVERTIME MULTIPLIER RATE.
AW
INCLUDES $0.04 FOR SCHOLAR FUND.
AX
THE RATIO OF TERRAZZO FINISHER HOURS TO TERRAZZO WORKER HOURS SHALL NOT EXCEED TWO (2) TO ONE (1).
AY
INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
AZ
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF, WHICH IS FACTORED IN THE OVERTIME RATES. ANY EMPLOYEE WORKING UNDERGROUND SHALL RECEIVE $1.00 PER HOUR IN ADDITION TO REGULAR WAGES.
BA
RATE APPLIES TO FIRST TWO YEARS OF EMPLOYMENT ONLY; $1.35 AFTER 2 YEARS; $1.45 AFTER 5 YEARS; $1.60 AFTER 10 YEARS
BB
COMPUTATION IS BASED ON THE LOWEST VACATION AMOUNT. THESE RATES SHOULD BE INCREASED BY ANY ADDITIONAL VACATION/HOLIDAY PAY THAT IS REQUIRED.
BC
RATE APPLIES TO FIRST TWO YEARS OF EMPLOYMENT ONLY; $1.27 AFTER 2 YEARS; $1.37 AFTER 5 YEARS; $1.52 AFTER 10 YEARS.
BD
RATE APPLIES TO FIRST TWO YEARS OF EMPLOYMENT ONLY; $1.08 AFTER 2 YEARS; $1.18 AFTER 5 YEARS; $1.33 AFTER 10 YEARS.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH THE DIRECTOR OF INDUSTRIAL RELATIONS. IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE. YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

TRAVEL AND/OR SUBSISTENCE: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH WORKER TO EXECUTE THE WORK. YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

Return to main page