GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: SAN BENITO COUNTY

DETERMINATION: SBE-2016-2

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE BASIC HOURLY RATE BASIC HOURLY RATE FOOTNOTE HEALTH AND WELFARE HEALTH AND WELFARE FOOTNOTE PENSION PENSION FOOTNOTE VACATION/ HOLIDAY VACATION/ HOLIDAY FOOTNOTE TRAINING TRAINING FOOTNOTE OTHER PAYMENTS OTHER PAYMENTS FOOTNOTE HOURS HOURS FOOTNOTE TOTAL HOURLY RATE DAILY OVERTIME HOURLY RATE DAILY OVERTIME HOURLY RATE FOOTNOTE SATURDAY OVERTIME HOURLY RATE SATURDAY OVERTIME HOURLY RATE FOOTNOTE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE FOOTNOTE HOLIDAY PROVISIONS SCOPE OF WORK PROVISIONS TRAVEL & SUBSISTENCE PROVISIONS
#BRICKLAYER, BLOCKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON 08/22/2016 04/30/2017** $39.700 A $9.850 $10.070 $3.000 B $0.800 $1.280 C 8 D $64.700 $86.050 E $86.050 E $107.400 HolidaysScope of WorkTravel & Subsistence
BRICKLAYER, BLOCKLAYER: POINTER, CLEANER, CAULKER, WATERPROOFER 08/22/2016 06/30/2017** $44.580 A $9.850 $11.320 $0.000 F $1.480 $0.400 8 D $67.630 $89.920 $89.920 G $112.210 HolidaysScope of WorkTravel & Subsistence
#BRICK TENDER 08/22/2016 06/30/2017** $32.770 H $7.840 $10.340 $0.000 F $0.450 $0.300 8 D $51.700 $68.080 E $68.080 E $84.470 HolidaysScope of WorkTravel & Subsistence
#CARPET, LINOLEUM, SOFT FLOOR LAYER 02/22/2016 12/31/2016** $46.820 A $9.950 $12.580 $0.000 I $0.630 $0.340 8 $70.320 $93.730 J $93.730 J $117.140 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, FLOOR COVERING HANDLER AFTER 3 YEARS 02/22/2016 12/31/2016** $23.390 A $9.950 $6.290 $0.000 I $0.050 $0.340 8 $40.020 $51.710 J $51.710 J $63.410 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, FLOOR COVERING HANDLER LESS THAN 3 YEARS 02/22/2016 12/31/2016** $18.700 A $9.950 $5.030 $0.000 I $0.050 $0.340 8 $34.070 $43.420 J $43.420 J $52.770 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, FLOOR COVERING HANDLER TRAINEE, FIRST 3 MONTHS 02/22/2016 12/31/2016** $14.950 A $9.950 $4.020 $0.000 I $0.050 $0.340 8 $29.310 $36.780 J $36.780 J $44.260 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, FLOOR COVERING HANDLER TRAINEE, SECOND 3 MONTHS 02/22/2016 12/31/2016** $16.830 A $9.950 $4.530 $0.000 I $0.050 $0.340 8 $31.700 $40.110 J $40.110 J $48.530 HolidaysScope of WorkTravel & Subsistence
#ELECTRICIAN: COMM & SYSTEM INSTALLER 02/22/2016 11/30/2016** $34.320 $10.050 $5.150 K $0.000 $1.100 $0.210 L 8 $52.030 $69.790 M $69.790 M $87.550 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: COMM & SYSTEM TECH. 02/22/2016 11/30/2016** $39.080 $10.050 $5.150 K $0.000 $1.100 $0.210 L 8 $56.960 $77.190 M $77.190 M $97.410 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: INSIDE WIREMAN, TECHNICIAN 02/22/2016 12/25/2016** $43.150 N $10.950 O $10.950 P $0.000 $0.950 O $0.740 Q 8 $68.030 $102.050 R $102.050 R $136.070 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: CABLE SPLICER 02/22/2016 12/25/2016** $48.540 N $10.950 O $10.950 P $0.000 $0.950 O $0.810 Q 8 $73.660 $110.480 R $110.480 R $147.310 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: INSIDE WIREMAN (WHEN WELDING) 02/22/2016 12/25/2016** $47.470 N $10.950 O $10.950 P $0.000 $0.950 O $0.790 Q 8 $72.530 $108.800 R $108.800 R $145.070 HolidaysScope of WorkTravel & Subsistence
#FIELD SURVEYOR: CHIEF OF PARTY S 02/22/2016 02/28/2017** $38.750 $13.380 $11.280 T $3.690 U $0.820 $0.160 8 $68.080 $87.460 V $87.460 W $106.830 HolidaysScope of WorkTravel & Subsistence
FIELD SURVEYOR: INSTRUMENTMAN S 02/22/2016 02/28/2017** $35.660 $13.380 $11.280 T $3.690 U $0.820 $0.160 8 $64.990 $82.820 V $82.820 W $100.650 HolidaysScope of WorkTravel & Subsistence
FIELD SURVEYOR: CHAINMAN/RODMAN S 02/22/2016 02/28/2017** $32.780 $13.380 $11.280 T $3.690 U $0.820 $0.160 8 $62.110 $78.500 V $78.500 W $94.890 HolidaysScope of WorkTravel & Subsistence
#GLAZIER 02/22/2016 12/31/2016** $44.530 A $9.950 $15.390 X $0.000 $0.550 $0.380 Y 8 $70.800 $93.070 Z $115.330 $115.330 HolidaysScope of WorkTravel & Subsistence
#MARBLE FINISHER AA 08/22/2016 01/31/2017** $31.170 AB $9.850 $4.180 $0.000 I $0.450 $0.590 8 $46.240 $61.830 AC $77.410 $77.410 HolidaysScope of WorkTravel & Subsistence
#MARBLE MASON AA 08/22/2016 01/31/2017** $41.770 AB $9.850 $15.020 $0.000 I $0.800 $0.820 8 $68.260 $89.140 AC $110.030 $110.030 HolidaysScope of WorkTravel & Subsistence
#PAINTER: BRUSH AND SPRAY 02/22/2016 12/31/2016** $37.750 H $9.950 $11.640 T $0.000 I $0.550 $0.380 8 D $60.270 $79.150 $79.150 AD $98.020 HolidaysScope of WorkTravel & Subsistence
PAINTER: INDUSTRIAL PAINTER 02/22/2016 12/31/2016** $38.250 H $9.950 $11.640 T $0.000 I $0.550 $0.380 8 D $60.770 $79.900 $79.900 AD $99.020 HolidaysScope of WorkTravel & Subsistence
PAINTER: SANDBLASTER, STEAM CLEANER, WATERBLASTER 02/22/2016 12/31/2016** $38.250 H $9.950 $11.640 T $0.000 I $0.550 $0.380 8 D $60.770 $79.900 $79.900 AD $99.020 HolidaysScope of WorkTravel & Subsistence
PAINTER: EXOTIC MATERIALS 02/22/2016 12/31/2016** $38.500 H $9.950 $11.640 T $0.000 I $0.550 $0.380 8 D $61.020 $80.270 $80.270 AD $99.520 HolidaysScope of WorkTravel & Subsistence
PAINTER: PAPERHANGER/WALLCOVERING 02/22/2016 12/31/2016** $38.750 H $9.950 $11.640 T $0.000 I $0.550 $0.380 8 D $61.270 $80.650 $80.650 AD $100.020 HolidaysScope of WorkTravel & Subsistence
PAINTER: TAPER 08/22/2016 12/31/2016** $39.610 AE $9.950 $12.100 $0.000 I $0.560 $0.500 8 $62.720 $82.530 $82.530 D $102.330 AD HolidaysScope of WorkTravel & Subsistence
PAINTER: TAPER CLEAN-UP AF 08/22/2016 12/31/2016* $15.810 AG $9.950 $0.000 $0.000 $0.000 $0.000 8 $25.760 $33.670 $33.670 D $41.570 AD HolidaysScope of WorkTravel & Subsistence
#PLASTERER 08/22/2016 06/30/2017* $31.760 AH $13.280 $10.000 $3.000 $1.090 $1.150 8 $60.280 $75.260 $75.260 AI $90.230 HolidaysScope of WorkTravel & Subsistence
#PLASTER TENDER AJ 08/22/2016 06/30/2017** $33.530 AK $7.840 $12.500 $0.000 I $0.450 $0.450 AL 8 $54.770 $69.830 AM $69.830 AM $84.890 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: UNDERGROUND UTILITY PIPEFITTER 08/22/2016 06/30/2017** $26.600 $8.600 $3.000 AN $2.000 $0.450 $0.600 8 $41.250 $54.550 $54.550 D $67.850 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE PIPEFITTER 08/22/2016 06/30/2017** $26.600 $8.600 $3.000 AN $2.000 $0.450 $0.600 8 $41.250 $54.550 $54.550 D $67.850 HolidaysScope of WorkTravel & Subsistence
PLUMBER: UNDERGROUND UTILITY ASSISTANT JOURNEYMAN AO 08/22/2016 06/30/2017** $15.600 $8.600 $3.000 AN $2.000 $0.450 $0.600 8 $30.250 $38.050 $38.050 D $45.850 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE ASSISTANT JOURNEYMAN AO 08/22/2016 06/30/2017** $15.600 $8.600 $3.000 AN $2.000 $0.450 $0.600 8 $30.250 $38.050 $38.050 D $45.850 HolidaysScope of WorkTravel & Subsistence
PLUMBER: UNDERGROUND UTILITY TRADESMAN AP 08/22/2016 06/30/2017** $12.000 $8.600 $3.000 AN $2.000 $0.450 $0.600 8 $26.650 $32.650 $32.650 D $38.650 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE TRADESMAN I AQ 08/22/2016 06/30/2017** $12.000 $8.600 $0.000 AN $2.000 $0.450 $0.600 8 $23.650 $29.650 $29.650 D $35.650 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE TRADESMAN II AQ 08/22/2016 06/30/2017** $12.000 $8.600 $3.000 AN $2.000 $0.450 $0.600 8 $26.650 $32.650 $32.650 D $38.650 HolidaysScope of WorkTravel & Subsistence
PLUMBER: PLUMBER, STEAMFITTER, REFRIGERATION FITTER (HVAC) 08/22/2016 06/30/2017** $58.910 A $15.710 AR $20.920 AS $0.000 F $1.450 $0.850 AT 8 $97.840 $130.800 E $130.800 E $163.750 AU HolidaysScope of WorkTravel & Subsistence
PLUMBER: CONSTRUCTION TRADESMAN (YEAR 2) 08/22/2016 06/30/2017* $19.230 A $10.700 AN $0.500 AN $0.000 F $0.000 $0.250 AV 8 $30.680 $40.300 E $40.300 E $49.910 HolidaysScope of WorkTravel & Subsistence
PLUMBER: CONSTRUCTION TRADESMAN (YEAR 3) 08/22/2016 06/30/2017* $24.830 A $10.700 AN $0.500 AN $0.000 F $0.000 $0.250 AV 8 $36.280 $48.700 E $48.700 E $61.110 HolidaysScope of WorkTravel & Subsistence
PLUMBER: CONSTRUCTION TRADESMAN (YEAR 4) 08/22/2016 06/30/2017* $26.210 A $10.700 AN $0.500 AN $0.000 F $0.000 $0.250 AV 8 $37.660 $50.770 E $50.770 E $63.870 HolidaysScope of WorkTravel & Subsistence
PLUMBER: CONSTRUCTION TRADESMAN (YEAR 5) 08/22/2016 06/30/2017* $29.200 A $10.700 AN $2.250 AN $0.000 F $0.000 $0.250 AV 8 $42.400 $57.010 E $57.010 E $71.600 HolidaysScope of WorkTravel & Subsistence
PLUMBER: SERVICE AND REPAIR 08/22/2016 06/30/2017** $58.910 A $15.710 AR $20.920 AS $0.000 F $1.450 $0.850 AT 8 $97.840 $130.800 $130.800 AW $130.800 HolidaysScope of WorkTravel & Subsistence
PLUMBER: FIRE SPRINKLER FITTER (PROTECTION AND CONTROL SYSTEMS, OVERHEAD AND UNDERGROUND) 08/22/2016 12/31/2016** $35.710 $8.770 $11.030 AX $0.000 $0.450 $0.250 8 $56.210 $74.070 $74.070 $91.920 HolidaysScope of WorkTravel & Subsistence
#ROOFER 08/22/2016 07/31/2017** $33.260 $9.330 $5.930 $3.610 $0.850 $0.640 8 $53.620 $70.250 J $70.250 AY $86.880 HolidaysScope of WorkTravel & Subsistence
ROOFER BITUMASTIC, ENAMELER, PIPE WRAPPER, COAL TAR PITCH BUILD-UP 08/22/2016 07/31/2017** $35.260 $9.330 $5.930 $3.610 $0.850 $0.640 8 $55.620 $73.250 J $73.250 AY $90.880 HolidaysScope of WorkTravel & Subsistence
ROOFER MASTIC WORKER, KETTLEMAN 08/22/2016 07/31/2017** $33.510 $9.330 $5.930 $3.610 $0.850 $0.640 8 $53.870 $70.630 J $70.630 AY $87.380 HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER ZONE 1 (UNDER 20 MILES) AZ 08/22/2016 12/31/2016** $44.140 H $13.380 AN $18.830 BA $0.000 F $1.420 $0.420 8 $78.190 $101.420 BB $101.420 BB $124.650 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER FOR SERVICE AND REPAIR AZ 08/22/2016 12/31/2016** $44.140 H $13.380 AN $18.830 BA $0.000 F $1.420 $0.420 8 $78.190 $101.420 BC $101.420 BD $124.650 BE HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER METAL DECK & SIDING 08/22/2016 06/30/2017* $35.640 H $13.980 AN $19.200 BF $0.000 F $0.310 BG $0.000 8 $69.130 $87.950 BB $87.950 BB $106.770 HolidaysScope of WorkTravel & Subsistence
#TERRAZZO FINISHER BH 08/22/2016 06/30/2017** $34.430 BI $9.850 $5.420 $0.000 F $0.800 $0.840 8 $51.340 $66.430 BB $66.430 BB $81.530 HolidaysScope of WorkTravel & Subsistence
#TERRAZZO WORKER BH 08/22/2016 06/30/2017** $42.410 BI $9.850 $14.970 $0.000 F $0.800 $1.020 8 $69.050 $87.560 BB $87.560 BB $106.060 HolidaysScope of WorkTravel & Subsistence
#TILE FINISHER 08/22/2016 09/30/2016** $24.760 BJ $8.830 $3.490 $0.700 $0.520 $1.460 8 $39.760 $52.140 $52.140 D $64.520 HolidaysScope of WorkTravel & Subsistence
TILE FINISHER RED CIRCLED FINISHER 08/22/2016 09/30/2016** $30.440 BJ $8.830 $3.720 $1.300 $0.520 $1.460 8 $46.270 $61.490 $61.490 D $76.710 HolidaysScope of WorkTravel & Subsistence
#TILE SETTER 08/22/2016 09/30/2016** $41.550 BJ $8.830 $4.720 $2.350 $0.790 $2.100 8 $60.340 $81.110 $81.110 D $101.890 HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER 08/22/1998 12/31/1998* $12.700 $3.200 $0.780 $0.630 BK $0.000 $0.000 8 $17.310 $23.660 BL $23.660 BL $23.660 BL HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER PUMP INSTALLER 08/22/1998 12/31/1998* $12.700 $3.200 $0.780 $0.630 BK $0.000 $0.000 8 $17.310 $23.660 BL $23.660 BL $23.660 BL HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER HELPER 08/22/1998 12/31/1998* $10.380 $3.200 $0.780 $0.520 BM $0.000 $0.000 8 $14.880 $20.070 BL $20.070 BL $20.070 BL HolidaysScope of WorkTravel & Subsistence

Go to increase page

FOOTNOTES

*
EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
#
INDICATES AN APPRENTICEABLE CRAFT. THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @ HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.
&
THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.
A
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
B
VACATION IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER
C
INCLUDES AMOUNT FOR INDUSTRY PROMOTION FUND, INTERNATIONAL MASONRY INSTITUTE, LABOR MANAGEMENT COOPERATION COMMITTEE, AND VACATION TRUST FUND.
D
SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
E
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
F
INCLUDED IN STRAIGHT-TIME HOURLY RATE.
G
RATE APPLIES TO THE FIRST 10 HOURS WORKED ON SATURDAY. ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
H
INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
I
INCLUDED IN BASIC HOURLY RATE.
J
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
K
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD.
L
IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES.
M
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
N
ALL OF SANTA CRUZ, MONTEREY, AND SAN BENITO COUNTIES WITHIN TWENTY-FIVE (25) AIR-MILES OF HIGHWAY 1 AND DOLAN ROAD IN MOSS LANDING, AND AN AREA EXTENDING FIVE (5) MILES EAST AND WEST OF HIGHWAY 101 SOUTH TO THE SAN LUIS OBISPO COUNTY LINE. FOR WAGE RATES IN AN AREA OUTSIDE OF THIS DESCRIPTION, PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT.
O
CONTRIBUTION IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER FOR EACH OVERTIME HOUR WORKED.
P
CONTRIBUTION IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER FOR EACH OVERTIME HOUR WORKED. IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8 THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
Q
CONTRIBUTION IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER FOR EACH OVERTIME HOUR WORKED. INCLUDES AN AMOUNT EQUAL TO 1.25% OF THE BASIC HOURLY RATE FOR ADMINISTRATIVE MAINTENANCE FUND
R
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY. ALL OTHER TIME AND WORK PERFORMED ON A SATURDAY THAT IMMEDIATELY FOLLOWS A DESIGNATED HOLIDAY THAT IS OBSERVED ON A FRIDAY ARE PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
S
ALL CREWS, WITHOUT CONSIDERATION TO THE NUMBER OF INDIVIDUALS IN THE CREW, SHALL INCLUDE A CHIEF OF PARTY. A CREW CONSISTS OF ONE (1) OR MORE EMPLOYEES PERFORMING FIELD AND CONSTRUCTION SURVEY WORK.
T
INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
U
INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.
V
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS, MONDAY THROUGH FRIDAY. ALL OTHER OVERTIME IS PAID AT THE SUNDAY/HOLIDAY RATE.
W
RATE APPLIES TO THE FIRST 12 OVERTIME HOURS WORKED. ALL OTHER OVERTIME IS PAID AT THE SUNDAY/HOLIDAY RATE. IN THE EVENT IT IS NOT REASONABLY POSSIBLE TO COMPLETE 40 HOURS OF WORK ON AN 8 HOUR DAY, MONDAY THROUGH FRIDAY, THEN THE BALANCE OF THE 40 HOURS, UP TO 8 HOURS, MAY BE WORKED ON SATURDAY AT THE STRAIGHT-TIME RATE.
X
INCLUDES AN AMOUNT PER HOUR WORKED FOR IUPAT, IARP, AND RETIREE PENSION.
Y
INCLUDES AMOUNTS FOR INDUSTRY FUND, WORK PRESERVATION FUND, AND LABOR MANAGEMENT COOPERATION INITIATIVE
Z
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND FIRST 8 HOURS WORKED ON DESIGNATED DAYS OFF; ALL OTHER TIME IS PAID AT THE SATURDAY, SUNDAY AND HOLIDAY OVERTIME RATE.
AA
EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFFOLD SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.
AB
INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.
AC
RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
AD
DESIGNATED DAYS OFF SHALL BE PAID AT THE SATURDAY OVERTIME RATE; PLEASE REFER TO THE HOLIDAY PROVISIONS FOR A LIST OF DESIGNATED DAYS OFF.
AE
INCLUDES AMOUNTS FOR VACATION AND DUES CHECK OFF
AF
PLEASE NOTE THAT THE TAPER CLEAN-UP APPLIES ONLY TO THE TAPER CLASSIFICATION.
AG
INCLUDES AN AMOUNT FOR DUES CHECK OFF
AH
INCLUDES AN AMOUNT WITHHELD FOR DUES CHECKOFF WHICH IS NOT FACTORED IN OVERTIME AND HOLIDAY WAGE RATES. EMPLOYEES WORKING ON AND BEHIND PLASTER GUNS SHALL RECEIVE AN ADDITIONAL $5.00 PER DAY ABOVE THE WAGE RATE.
AI
RATE APPLIES TO THE FIRST 8 HOURS WORKED; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AJ
ALL HOD CARRIERS WORKING ON THE HOSE SHALL RECEIVE $5.00 PER DAY OVER SCALE.
AK
INCLUDES AN AMOUNT FOR VACATION, DUES CHECK-OFF AND ORGANIZING DUES WHICH ARE NOT FACTORED INTO OVERTIME.
AL
AMOUNT IS FOR INDUSTRY PROMOTION FUND.
AM
RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
AN
PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AO
THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE.
AP
THERE SHALL BE NO MORE THAN THREE TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON EACH JOBSITE.
AQ
THERE SHALL BE NO MORE THAN FOUR TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON EACH JOBSITE. MAINTENANCE WORK, BOTH DURING AND AFTER THE PLANT ESTABLISHMENT PERIOD, MAY BE PERFORMED BY LANDSCAPE TRADESMEN WITHOUT THE SUPERVISION OF A JOURNEYMAN PIPEFITTER.
AR
INCLUDES AN AMOUNT FOR HEALTH AND WELFARE EXTENDED RESERVE WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AS
INCLUDES AN AMOUNT FOR 401A-PART B PENSION WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AT
$0.50 TO SUPPLEMENTAL UNEMPLOYMENT.
AU
APPLIES TO THE FOLLOWING HOLIDAYS: NEW YEARS DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. ALL OTHER HOLIDAYS USE THE SATURDAY OVERTIME RATE.
AV
AMOUNT IS FOR CONTRACT ADMINISTRATION
AW
SATURDAY MAY BE PAID AT STRAIGHT TIME IF THE WORK WEEK IS TUESDAY THROUGH SATURDAY.
AX
INCLUDES AN AMOUNT FOR SUPPLEMENTAL PENSION FUND.
AY
APPLIES TO THE FIRST 12 HOURS WORKED ON SATURDAY. ALL OTHER OVERTIME IS PAID AT THE SUNDAY/HOLIDAY RATE. IN THE EVENT THAT CONDITIONS OVER WHICH THE ROOFING CONTRACTOR HAS NO CONTROL (I.E. ADVERSE WEATHER, PROJECT DELAYS, LOGISTICAL PROBLEMS, GENERAL CONTRACTOR OR BUILDING OWNER REQUIREMENTS, ETC.) PREVENT EMPLOYEES FROM WORKING ON ONE OR MORE DAYS DURING THE REGULAR WORK WEEK, WORK PERFORMED ON SATURDAY MAY BE PAID AT THE STRAIGHT TIME RATES.
AZ
APPLIES TO JOBSITES UNDER 20 MILES FROM MARKET AND MAIN STREETS IN SALINAS, CA (MONTEREY COUNTY) AND 5TH AND SAN BENITO STREETS IN HOLLISTER, CA (SAN BENITO COUNTY). FOR RATES OUTSIDE THESE ZONES REFER TO THE TRAVEL AND SUBSISTENCE PROVISIONS APPLICABLE TO THIS DETERMINATION.
BA
INCLUDES AN AMOUNT FOR PENSION WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
BB
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
BC
FOR BOTH THE MONDAY-FRIDAY AND THE TUESDAY-SATURDAY SERVICE WORKWEEKS, RATE APPLIES TO THE FIRST FOUR (4) HOURS WORKED OUTSIDE OF THE EMPLOYEE'S NORMAL EIGHT (8) WORK HOURS; ALL OTHER OVERTIME SHALL BE PAID AT THE DOUBLE TIME RATE OF PAY.
BD
APPLIES TO THE FIRST EIGHT (8) HOURS WORKED FOR THE MONDAY-FRIDAY SERVICE WORKWEEK; ALL OTHER OVERTIME SHALL BE PAID AT THE DOUBLE TIME RATE OF PAY. FOR THE TUESDAY-SATURDAY SERVICE WORKWEEK ONLY, SATURDAY WILL BE WORKED AT STRAIGHT-TIME FOR THE EMPLOYEE'S NORMAL EIGHT (8) WORK HOURS.
BE
THIS RATE ALSO APPLIES TO ALL HOURS WORKED ON MONDAY FOR THE TUESDAY-SATURDAY SERVICE WORKWEEK.
BF
INCLUDES AN AMOUNT FOR PENSION FACTORED AT THE OVERTIME MULTIPLIER RATE.
BG
INCLUDES $0.04 FOR SCHOLAR FUND.
BH
THE RATIO OF TERRAZZO FINISHER HOURS TO TERRAZZO WORKER HOURS SHALL NOT EXCEED TWO (2) TO ONE (1).
BI
INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
BJ
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF, WHICH IS FACTORED IN THE OVERTIME RATES. ANY EMPLOYEE WORKING UNDERGROUND SHALL RECEIVE $1.00 PER HOUR IN ADDITION TO REGULAR WAGES.
BK
RATE APPLIES TO FIRST YEAR OF EMPLOYMENT ONLY; $0.88 AFTER 2 YEARS OF EMPLOYMENT.
BL
RATE APPLIES TO ALL TIME WORKED IN EXCESS OF 8 HOURS PER DAY OR 40 HOURS PER WEEK AND FOR ALL HOURS ON SUNDAYS AND HOLIDAYS. RATE DOES NOT INCLUDE ANY ADDITIONAL AMOUNT THAT MAY BE REQUIRED FOR VACATION/HOLIDAY PAYMENT.
BM
RATE APPLIES TO FIRST YEAR OF EMPLOYMENT ONLY; $0.72 AFTER 2 YEARS OF EMPLOYMENT.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH THE DIRECTOR OF INDUSTRIAL RELATIONS. IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE. YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

TRAVEL AND/OR SUBSISTENCE: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH WORKER TO EXECUTE THE WORK. YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

Return to main page