GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: TRINITY COUNTY

DETERMINATION: TRI-2016-1

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE BASIC HOURLY RATE BASIC HOURLY RATE FOOTNOTE HEALTH AND WELFARE HEALTH AND WELFARE FOOTNOTE PENSION PENSION FOOTNOTE VACATION/ HOLIDAY VACATION/ HOLIDAY FOOTNOTE TRAINING TRAINING FOOTNOTE OTHER PAYMENTS OTHER PAYMENTS FOOTNOTE HOURS HOURS FOOTNOTE TOTAL HOURLY RATE DAILY OVERTIME HOURLY RATE DAILY OVERTIME HOURLY RATE FOOTNOTE SATURDAY OVERTIME HOURLY RATE SATURDAY OVERTIME HOURLY RATE FOOTNOTE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE FOOTNOTE HOLIDAY PROVISIONS SCOPE OF WORK PROVISIONS TRAVEL & SUBSISTENCE PROVISIONS
#BRICKLAYER, BLOCKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON 02/22/2016 04/30/2016** $36.990 A $9.790 $14.130 $3.000 B $0.800 $1.290 C 8 D $66.000 $85.990 E $85.990 E $105.990 HolidaysScope of WorkTravel & Subsistence
BRICKLAYER, BLOCKLAYER: POINTER, CLEANER, CAULKER, WATERPROOFER 08/22/2015 06/30/2016** $43.390 A $9.790 $10.790 $0.000 F $1.460 $0.400 8 D $65.830 $87.520 $87.520 G $109.220 HolidaysScope of WorkTravel & Subsistence
#BRICK TENDER 08/22/2015 06/30/2016** $32.270 H $7.540 $10.180 $0.000 F $0.410 $0.300 8 D $50.700 $66.830 E $66.830 E $82.970 HolidaysScope of WorkTravel & Subsistence
#CARPET, LINOLEUM, RESILIENT TILE LAYER 02/22/2016 12/31/2016** $32.860 A $9.950 $8.860 $0.000 I $0.600 $0.110 8 $52.380 $68.810 J $68.810 J $85.240 K HolidaysScope of WorkTravel & Subsistence
#ELECTRICIAN: COMM & SYSTEM INSTALLER 02/22/2016 11/30/2016** $27.850 $10.050 $2.700 L $0.000 $1.100 $0.110 M 8 $42.790 $57.200 $57.200 $71.610 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: COMM & SYSTEM TECH. 02/22/2016 11/30/2016** $32.030 $10.050 $2.700 L $0.000 $1.100 $0.110 M 8 $47.110 $63.690 $63.690 $80.260 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: INSIDE WIREMAN 02/22/2016 05/31/2016** $39.060 $11.630 $5.000 L $0.000 F $1.240 $5.470 N 8 $64.200 $84.630 $84.630 $105.050 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: CABLE SPLICER 02/22/2016 05/31/2016** $42.970 $11.630 $5.000 L $0.000 F $1.240 $5.470 N 8 $68.290 $90.760 $90.760 $113.240 HolidaysScope of WorkTravel & Subsistence
#FIELD SURVEYOR: CHIEF OF PARTY O 02/22/2016 02/28/2017** $38.750 $13.380 $11.280 P $3.690 Q $0.820 $0.160 8 $68.080 $87.460 R $87.460 S $106.830 HolidaysScope of WorkTravel & Subsistence
FIELD SURVEYOR: INSTRUMENTMAN O 02/22/2016 02/28/2017** $35.660 $13.380 $11.280 P $3.690 Q $0.820 $0.160 8 $64.990 $82.820 R $82.820 S $100.650 HolidaysScope of WorkTravel & Subsistence
FIELD SURVEYOR: CHAINMAN/RODMAN O 02/22/2016 02/28/2017** $32.780 $13.380 $11.280 P $3.690 Q $0.820 $0.160 8 $62.110 $78.500 R $78.500 S $94.890 HolidaysScope of WorkTravel & Subsistence
#GLAZIER 02/22/2016 12/31/2016** $34.520 A $9.950 $14.010 T $0.000 $0.590 $0.380 U 8 $59.450 $76.710 V $93.970 $93.970 HolidaysScope of WorkTravel & Subsistence
#MARBLE FINISHER W 08/22/2015 07/31/2016** $30.220 X $9.790 $3.930 $0.000 I $0.450 $0.550 8 $44.940 $60.050 Y $75.160 $75.160 HolidaysScope of WorkTravel & Subsistence
#MARBLE MASON W 08/22/2015 07/31/2016** $40.410 X $9.790 $14.390 $0.000 I $0.800 $0.770 8 $66.160 $86.360 Y $106.570 $106.570 HolidaysScope of WorkTravel & Subsistence
#PAINTER: BRUSH, SPRAY, PAPERHANGER 02/22/2016 12/31/2016** $31.780 Z $9.950 $6.890 $0.000 I $0.390 $0.360 8 D $49.370 $65.260 $65.260 AA $81.150 HolidaysScope of WorkTravel & Subsistence
PAINTER: SANDBLASTER, STEAM CLEANER, WATERBLASTER 02/22/2016 12/31/2016** $32.380 Z $9.950 $6.890 $0.000 I $0.390 $0.360 8 D $49.970 $66.160 $66.160 AA $82.350 HolidaysScope of WorkTravel & Subsistence
PAINTER: EXOTIC MATERIALS 02/22/2016 12/31/2016** $32.780 Z $9.950 $6.890 $0.000 I $0.390 $0.360 8 D $50.370 $66.760 $66.760 AA $83.150 HolidaysScope of WorkTravel & Subsistence
PAINTER: TAPER 02/22/2016 06/30/2016** $38.660 AB $9.950 $11.100 $0.000 I $0.460 $0.500 8 $60.670 $80.000 $80.000 D $99.330 AA HolidaysScope of WorkTravel & Subsistence
PAINTER: TAPER CLEAN-UP AC 02/22/2016 06/30/2016* $15.430 AD $9.950 $0.000 $0.000 $0.000 $0.000 8 $25.380 $33.100 $33.100 D $40.810 AA HolidaysScope of WorkTravel & Subsistence
#PLASTERER 08/22/2015 06/30/2016** $31.010 AE $13.030 $8.930 $3.000 $1.080 $1.150 8 $58.200 $72.830 $72.830 AF $87.470 HolidaysScope of WorkTravel & Subsistence
#PLASTER TENDER 08/22/2015 06/30/2016** $30.020 $7.540 $9.730 $2.630 $0.430 $1.030 AG 8 $51.380 $66.390 J $66.390 J $81.400 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: PLUMBER, STEAMFITTER, REFRIGERATION FITTER (HVAC) 02/22/2016 06/30/2016** $38.250 $11.530 $14.310 $0.000 F $1.800 $2.420 8 $68.310 $87.430 E $87.430 E $106.560 HolidaysScope of WorkTravel & Subsistence
PLUMBER: UNDERGROUND UTILITY PIPEFITTER 08/22/2015 06/30/2016** $26.600 $6.600 $3.000 AH $2.000 $0.450 $0.600 8 D $39.250 $52.550 $52.550 $65.850 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE PIPEFITTER 08/22/2015 06/30/2016** $26.600 $6.600 $3.000 AH $2.000 $0.450 $0.600 8 D $39.250 $52.550 $52.550 $65.850 HolidaysScope of WorkTravel & Subsistence
PLUMBER: UNDERGROUND UTILITY ASSISTANT JOURNEYMAN AI 08/22/2015 06/30/2016** $15.600 $6.600 $3.000 AH $2.000 $0.450 $0.600 8 D $28.250 $36.050 $36.050 $43.850 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE ASSISTANT JOURNEYMAN AI 08/22/2015 06/30/2016** $15.600 $6.600 $3.000 AH $2.000 $0.450 $0.600 8 D $28.250 $36.050 $36.050 $43.850 HolidaysScope of WorkTravel & Subsistence
PLUMBER: UNDERGROUND UTILITY TRADESMAN AJ 08/22/2015 06/30/2016** $10.900 $6.600 $3.000 AH $2.000 $0.450 $0.600 8 D $23.550 $29.000 $29.000 $34.450 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE TRADESMAN I AK 08/22/2015 06/30/2016** $10.550 $6.600 $0.000 AH $2.000 $0.450 $0.600 8 D $20.200 $25.480 $25.480 $30.750 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE TRADESMAN II AK 08/22/2015 06/30/2016** $10.900 $6.600 $3.000 AH $2.000 $0.450 $0.600 8 D $23.550 $29.000 $29.000 $34.450 HolidaysScope of WorkTravel & Subsistence
PLUMBER: FIRE SPRINKLER FITTER (PROTECTION AND CONTROL SYSTEMS, OVERHEAD AND UNDERGROUND) 02/22/2016 03/31/2016* $35.570 $8.770 $11.050 AL $0.000 $0.450 $0.250 8 $56.090 $73.880 $73.880 $91.660 HolidaysScope of WorkTravel & Subsistence
ROOFER 08/22/2013 09/30/2013* $10.000 & $7.250 $4.400 $0.000 $0.320 $0.000 8 $21.970 $26.970 $26.970 $26.970 HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER 08/22/2015 06/26/2016* $52.200 H $13.460 AM $26.420 AN $0.000 F $1.410 $1.150 8 $94.640 $123.640 AO $123.640 AO $152.640 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER TOTAL SHEET METAL CONTRACT OF $200000 OR LESS 08/22/2015 06/26/2016* $46.300 H $13.460 AM $25.140 AN $0.000 F $1.410 $1.150 8 $87.460 $113.190 AO $113.190 AO $138.910 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER SERVICE MECHANIC (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2015 06/26/2016* $35.720 H $12.940 AP $14.680 AN $0.000 F $1.310 $1.150 8 $65.800 $84.910 AQ $84.910 AQ $104.020 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER SERVICE TECHNICIAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2015 06/26/2016* $32.370 H $12.940 AP $9.410 AN $0.000 F $1.310 $1.150 8 $57.180 $74.160 AQ $74.160 AQ $91.150 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER AIR CONDITIONING SPECIALIST (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2015 06/26/2016* $28.810 H $12.940 AP $4.330 AN $0.000 F $1.290 $1.150 8 $48.520 $63.380 AO $63.380 AO $78.230 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER AIR CONDITIONING JOURNEYMAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2015 06/26/2016* $33.510 H $12.960 AM $9.690 AN $0.000 F $1.290 $1.150 8 $58.600 $76.100 AO $76.100 AO $93.610 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER METAL DECK & SIDING 02/22/2015 06/30/2015* $33.860 H $13.530 AH $18.000 AR $0.000 F $0.300 AS $0.000 8 $65.690 $83.620 AO $83.620 AO $101.550 HolidaysScope of WorkTravel & Subsistence
#TERRAZZO FINISHER AT 02/22/2016 06/30/2016** $33.780 AU $9.790 $5.140 $0.000 F $0.800 $0.830 8 $50.340 $65.120 AO $65.120 AO $79.900 HolidaysScope of WorkTravel & Subsistence
#TERRAZZO WORKER AT 02/22/2016 06/30/2016** $41.010 AU $9.790 $14.940 $0.000 F $0.800 $1.010 8 $67.550 $85.370 AO $85.370 AO $103.190 HolidaysScope of WorkTravel & Subsistence
#TILE FINISHER 08/22/2015 03/31/2016* $22.790 AV $8.830 $3.460 $0.700 $0.450 $1.130 8 $37.360 $48.760 $48.760 D $60.150 HolidaysScope of WorkTravel & Subsistence
TILE FINISHER RED CIRCLED FINISHER 08/22/2015 03/31/2016* $28.480 AV $8.830 $3.690 $1.300 $0.350 $1.140 8 $43.790 $58.030 $58.030 D $72.270 HolidaysScope of WorkTravel & Subsistence
#TILE SETTER 08/22/2015 03/31/2016* $39.520 AV $8.830 $4.690 $2.350 $0.690 $1.730 8 $57.810 $77.570 $77.570 D $97.330 HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER 08/22/2014 09/30/2014* $12.350 $2.150 $1.000 $0.480 $0.000 $0.000 8 $15.980 $22.160 AW $22.160 AW $22.160 AW HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER PUMP INSTALLER 08/22/2014 09/30/2014* $12.350 $2.150 $1.000 $0.480 $0.000 $0.000 8 $15.980 $22.160 AW $22.160 AW $22.160 AW HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER HELPER 08/22/2014 09/30/2014* $10.030 $2.150 $1.000 $0.430 $0.000 $0.000 8 $13.610 $18.630 AW $18.630 AW $18.630 AW HolidaysScope of WorkTravel & Subsistence

Go to increase page

FOOTNOTES

*
EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
#
INDICATES AN APPRENTICEABLE CRAFT. THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @ HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.
&
THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.
A
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
B
INCLUDES AN AMOUNT FACTORED AT THE OVERTIME MULTIPLIER RATE.
C
INCLUDES AMOUNT FOR INDUSTRY PROMOTION FUND, INTERNATIONAL MASONRY INSTITUTE, LABOR MANAGEMENT COOPERATION COMMITTEE, AND VACATION TRUST FUND.
D
SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
E
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
F
INCLUDED IN STRAIGHT-TIME HOURLY RATE.
G
RATE APPLIES TO THE FIRST 10 HOURS WORKED ON SATURDAY. ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
H
INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
I
INCLUDED IN BASIC HOURLY RATE.
J
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
K
DESIGNATED DAYS OFF SHALL BE PAID AT TIME AND ONE-HALF (1 1/2X). PLEASE REFER TO THE HOLIDAY PROVISION FOR A LIST OF DESIGNATED DAYS OFF.
L
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD.
M
IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE ADMINISTRATIVE MAINTENANCE FUND.
N
IN ADDITION, AN AMOUNT EQUAL TO 1.6% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE CONTRACT ADMINISTRATION FUND.
O
ALL CREWS, WITHOUT CONSIDERATION TO THE NUMBER OF INDIVIDUALS IN THE CREW, SHALL INCLUDE A CHIEF OF PARTY. A CREW CONSISTS OF ONE (1) OR MORE EMPLOYEES PERFORMING FIELD AND CONSTRUCTION SURVEY WORK.
P
INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
Q
INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.
R
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS, MONDAY THROUGH FRIDAY. ALL OTHER OVERTIME IS PAID AT THE SUNDAY/HOLIDAY RATE.
S
RATE APPLIES TO THE FIRST 12 OVERTIME HOURS WORKED. ALL OTHER OVERTIME IS PAID AT THE SUNDAY/HOLIDAY RATE. IN THE EVENT IT IS NOT REASONABLY POSSIBLE TO COMPLETE 40 HOURS OF WORK ON AN 8 HOUR DAY, MONDAY THROUGH FRIDAY, THEN THE BALANCE OF THE 40 HOURS, UP TO 8 HOURS, MAY BE WORKED ON SATURDAY AT THE STRAIGHT-TIME RATE.
T
INCLUDES AN AMOUNT FOR THE INDIVIDUAL ACCOUNT RETIRMENT PLAN
U
INCLUDES AMOUNTS FOR INDUSTRY FUND, WORK PRESERVATION FUND, AND LABOR MANAGEMENT COOPERATION INITIATIVE
V
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND FIRST 8 HOURS WORKED ON DESIGNATED DAYS OFF; ALL OTHER TIME IS PAID AT THE SATURDAY, SUNDAY AND HOLIDAY OVERTIME RATE.
W
EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFFOLD SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.
X
INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.
Y
RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
Z
INCLUDES AN AMOUNT FOR DUES CHECK-OFF, WAGE EQUALITY DUES, ORGANIZING DUES, BENEFICIAL AND HOLIDAY.
AA
DESIGNATED DAYS OFF SHALL BE PAID AT THE SATURDAY OVERTIME RATE; PLEASE REFER TO THE HOLIDAY PROVISIONS FOR A LIST OF DESIGNATED DAYS OFF.
AB
INCLUDES AMOUNTS FOR VACATION AND DUES CHECK OFF
AC
PLEASE NOTE THAT THE TAPER CLEAN-UP APPLIES ONLY TO THE TAPER CLASSIFICATION.
AD
INCLUDES AN AMOUNT FOR DUES CHECK OFF
AE
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF. PLASTERS OPERATING AND WORKING BEHIND PLASTER GUNS SHALL RECEIVE AN ADDITIONAL $2.00 PER DAY ABOVE THE WAGE RATE.
AF
RATE APPLIES TO THE FIRST 8 HOURS WORKED; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AG
AMOUNT IS FOR VALLEY MORTAR TRADES FUND ($1.00) AND INDUSTRY STABILIZATION FUND ($0.03)
AH
PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AI
THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE.
AJ
THERE SHALL BE NO MORE THAN THREE TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON EACH JOBSITE.
AK
THERE SHALL BE NO MORE THAN FOUR TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON EACH JOBSITE. MAINTENANCE WORK, BOTH DURING AND AFTER THE PLANT ESTABLISHMENT PERIOD, MAY BE PERFORMED BY LANDSCAPE TRADESMEN WITHOUT THE SUPERVISION OF A JOURNEYMAN PIPEFITTER.
AL
INCLUDES AN AMOUNT FOR SUPPLEMENTAL PENSION FUND.
AM
INCLUDES SMOHIT AND SHC. EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AN
INCLUDES AN AMOUNT FOR PENSION WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AO
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AP
INCLUDES SHC. EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AQ
RATE APPLIES TO FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY DURING THE EMPLOYEES NORMAL WORKING HOURS. ALL OTHER OVERTIME HOURS SHALL BE PAID AT THE SUNDAY AND HOLIDAY DOUBLE TIME RATE.
AR
INCLUDES AN AMOUNT FOR PENSION FACTORED AT THE OVERTIME MULTIPLIER RATE.
AS
INCLUDES $0.03 FOR SCHOLAR FUND.
AT
THE RATIO OF TERRAZZO FINISHER HOURS TO TERRAZZO WORKER HOURS SHALL NOT EXCEED TWO (2) TO ONE (1).
AU
INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
AV
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF, WHICH IS FACTORED IN THE OVERTIME RATES. ANY EMPLOYEE WORKING UNDERGROUND SHALL RECEIVE $1.00 PER HOUR IN ADDITION TO REGULAR WAGES.
AW
RATE APPLIES TO ALL TIME WORKED IN EXCESS OF 8 HOURS PER DAY OR 40 HOURS PER WEEK. DOUBLE-TIME IS PAID FOR WORK ON RECOGNIZED HOLIDAYS.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH THE DIRECTOR OF INDUSTRIAL RELATIONS. IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE. YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

TRAVEL AND/OR SUBSISTENCE: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH WORKER TO EXECUTE THE WORK. YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

Return to main page