GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: SANTA CLARA COUNTY

DETERMINATION: STC-2017-2

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE BASIC HOURLY RATE BASIC HOURLY RATE FOOTNOTE HEALTH AND WELFARE HEALTH AND WELFARE FOOTNOTE PENSION PENSION FOOTNOTE VACATION/ HOLIDAY VACATION/ HOLIDAY FOOTNOTE TRAINING TRAINING FOOTNOTE OTHER PAYMENTS OTHER PAYMENTS FOOTNOTE HOURS HOURS FOOTNOTE TOTAL HOURLY RATE DAILY OVERTIME HOURLY RATE DAILY OVERTIME HOURLY RATE FOOTNOTE SATURDAY OVERTIME HOURLY RATE SATURDAY OVERTIME HOURLY RATE FOOTNOTE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE FOOTNOTE HOLIDAY PROVISIONS SCOPE OF WORK PROVISIONS TRAVEL & SUBSISTENCE PROVISIONS
#BRICKLAYER, BLOCKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON 08/22/2017 04/30/2018** $41.140 A $9.850 $10.100 $3.000 B $0.800 $1.290 C 8 D $66.180 $88.250 E $88.250 E $110.320 HolidaysScope of WorkTravel & Subsistence
BRICKLAYER, BLOCKLAYER: POINTER, CLEANER, CAULKER, WATERPROOFER 08/22/2017 06/30/2018* $46.210 A $9.850 $11.500 $0.000 F $1.490 $0.430 8 D $69.480 $92.590 $92.590 G $115.690 HolidaysScope of WorkTravel & Subsistence
#BRICK TENDER 08/22/2017 04/30/2018** $31.920 H $8.000 $11.040 $0.000 F $0.450 $0.000 8 I $51.410 $67.370 J $67.370 J $83.330 HolidaysScope of WorkTravel & Subsistence
#CARPET, LINOLEUM, SOFT FLOOR LAYER 02/22/2017 12/31/2017** $47.340 A $10.150 $13.860 $0.000 K $0.630 $0.340 8 $72.320 $95.990 L $95.990 L $119.660 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, FLOOR COVERING HANDLER AFTER 3 YEARS 02/22/2017 12/31/2017** $23.650 A $10.150 $6.930 $0.000 K $0.050 $0.340 8 $41.120 $52.940 L $52.940 L $64.770 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, FLOOR COVERING HANDLER LESS THAN 3 YEARS 02/22/2017 12/31/2017** $18.910 A $10.150 $5.540 $0.000 K $0.050 $0.340 8 $34.990 $44.440 L $44.440 L $53.900 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, FLOOR COVERING HANDLER TRAINEE, FIRST 3 MONTHS 02/22/2017 12/31/2017** $15.120 A $10.150 $4.430 $0.000 K $0.050 $0.340 8 $30.090 $37.650 L $37.650 L $45.210 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, FLOOR COVERING HANDLER TRAINEE, SECOND 3 MONTHS 02/22/2017 12/31/2017** $17.010 A $10.150 $4.990 $0.000 K $0.050 $0.340 8 $32.540 $41.040 L $41.040 L $49.550 HolidaysScope of WorkTravel & Subsistence
#ELECTRICIAN: COMM & SYSTEM INSTALLER 02/22/2017 11/30/2017* $35.070 $10.550 $5.900 M $0.000 $1.100 $0.210 N 8 $54.060 $72.210 O $72.210 O $90.360 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: COMM & SYSTEM TECH. 02/22/2017 11/30/2017* $39.930 $10.550 $5.900 M $0.000 $1.100 $0.210 N 8 $59.090 $79.750 O $79.750 O $100.420 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: INSIDE WIREMAN, TECHNICIAN 08/22/2017 05/31/2018* $60.520 P $13.980 $17.400 Q $0.000 $0.850 $0.540 R 8 $95.110 $126.270 S $126.270 S $157.440 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: CABLE SPLICER 08/22/2017 05/31/2018* $69.600 P $13.980 $17.400 Q $0.000 $0.850 $0.590 R 8 $104.510 $140.350 S $140.350 S $176.200 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: MATERIAL HANDLER T 08/22/2017 07/31/2018* $27.770 $10.700 $3.300 M $0.000 $0.000 $0.250 8 $42.850 $57.150 $57.150 $71.460 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: MATERIAL HANDLER - FOURTH SIX MONTHS T 08/22/2017 07/31/2018* $23.600 $10.700 $3.300 M $0.000 $0.000 $0.230 8 $38.540 $50.690 $50.690 $62.850 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: MATERIAL HANDLER - THIRD SIX MONTHS T 08/22/2017 07/31/2018* $20.830 $10.700 $3.300 M $0.000 $0.000 $0.210 8 $35.660 $46.390 $46.390 $57.120 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: MATERIAL HANDLER - SECOND SIX MONTHS T 08/22/2017 07/31/2018* $18.050 $10.700 $3.300 M $0.000 $0.000 $0.200 8 $32.790 $42.090 $42.090 $51.380 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: MATERIAL HANDLER - FIRST SIX MONTHS T 08/22/2017 07/31/2018* $16.660 $0.000 $0.000 M $0.000 $0.000 $0.190 8 $17.350 $25.930 $25.930 $34.510 HolidaysScope of WorkTravel & Subsistence
#FIELD SURVEYOR: CHIEF OF PARTY U 02/22/2017 02/27/2018* $40.150 $13.680 $11.510 V $3.710 W $0.870 $0.160 8 $70.080 $90.160 X $90.160 Y $110.230 HolidaysScope of WorkTravel & Subsistence
FIELD SURVEYOR: INSTRUMENTMAN U 02/22/2017 02/27/2018* $37.060 $13.680 $11.510 V $3.710 W $0.870 $0.160 8 $66.990 $85.520 X $85.520 Y $104.050 HolidaysScope of WorkTravel & Subsistence
FIELD SURVEYOR: CHAINMAN/RODMAN U 02/22/2017 02/27/2018* $34.180 $13.680 $11.510 V $3.710 W $0.870 $0.160 8 $64.110 $81.200 X $81.200 Y $98.290 HolidaysScope of WorkTravel & Subsistence
#GLAZIER 02/22/2017 12/31/2017** $45.080 A $10.150 $16.640 Z $0.000 $0.550 $0.380 AA 8 $72.800 $95.340 AB $117.880 $117.880 HolidaysScope of WorkTravel & Subsistence
#MARBLE FINISHER AC 02/22/2017 07/31/2017** $31.170 AD $9.850 $4.230 $0.000 K $0.450 $0.590 8 $46.290 $61.880 AE $77.460 $77.460 HolidaysScope of WorkTravel & Subsistence
#MARBLE MASON AC 02/22/2017 07/31/2017** $41.770 AD $9.850 $15.420 $0.000 K $0.800 $0.820 8 $68.660 $89.540 AE $110.430 $110.430 HolidaysScope of WorkTravel & Subsistence
#PAINTER: BRUSH AND SPRAY 08/22/2017 12/31/2017** $38.820 H $10.150 $12.120 V $0.000 K $0.560 $0.380 8 D $62.030 $81.440 $81.440 AF $100.850 HolidaysScope of WorkTravel & Subsistence
PAINTER: INDUSTRIAL PAINTER 08/22/2017 12/31/2017** $39.320 H $10.150 $12.120 V $0.000 K $0.560 $0.380 8 D $62.530 $82.190 $82.190 AF $101.850 HolidaysScope of WorkTravel & Subsistence
PAINTER: SANDBLASTER, STEAM CLEANER, WATERBLASTER 08/22/2017 12/31/2017** $39.320 H $10.150 $12.120 V $0.000 K $0.560 $0.380 8 D $62.530 $82.190 $82.190 AF $101.850 HolidaysScope of WorkTravel & Subsistence
PAINTER: EXOTIC MATERIALS 08/22/2017 12/31/2017** $39.570 H $10.150 $12.120 V $0.000 K $0.560 $0.380 8 D $62.780 $82.570 $82.570 AF $102.350 HolidaysScope of WorkTravel & Subsistence
PAINTER: PAPERHANGER/WALLCOVERING 08/22/2017 12/31/2017** $39.820 H $10.150 $12.120 V $0.000 K $0.560 $0.380 8 D $63.030 $82.940 $82.940 AF $102.850 HolidaysScope of WorkTravel & Subsistence
PAINTER: TAPER 02/22/2017 12/31/2017** $44.110 AG $10.150 $14.980 $0.000 K $0.560 $0.550 8 $70.350 $92.400 $92.400 D $114.460 AF HolidaysScope of WorkTravel & Subsistence
PAINTER: TAPER CLEAN-UP AH 02/22/2017 12/31/2017* $17.610 AI $10.150 $0.000 $0.000 $0.000 $0.000 8 $27.760 $36.570 $36.570 D $45.370 AF HolidaysScope of WorkTravel & Subsistence
#PLASTERER 08/22/2017 12/31/2017** $33.100 AJ $13.280 $11.300 $3.000 $1.150 $1.200 8 $63.030 $78.630 $78.630 AK $94.230 HolidaysScope of WorkTravel & Subsistence
#PLASTER TENDER AL 08/22/2017 06/30/2018** $34.700 AM $8.000 $12.770 $0.000 K $0.450 $0.450 AN 8 $56.370 $72.010 AO $72.010 AO $87.660 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: UNDERGROUND UTILITY PIPEFITTER 08/22/2017 06/30/2018** $26.850 $9.600 $3.000 AP $2.000 $0.450 $0.600 8 $42.500 $55.930 $55.930 D $69.350 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE PIPEFITTER 08/22/2017 06/30/2018** $26.850 $9.600 $3.000 AP $2.000 $0.450 $0.600 8 $42.500 $55.930 $55.930 D $69.350 HolidaysScope of WorkTravel & Subsistence
PLUMBER: UNDERGROUND UTILITY ASSISTANT JOURNEYMAN AQ 08/22/2017 06/30/2018** $15.850 $9.600 $3.000 AP $2.000 $0.450 $0.600 8 $31.500 $39.430 $39.430 D $47.350 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE ASSISTANT JOURNEYMAN AQ 08/22/2017 06/30/2018** $15.850 $9.600 $3.000 AP $2.000 $0.450 $0.600 8 $31.500 $39.430 $39.430 D $47.350 HolidaysScope of WorkTravel & Subsistence
PLUMBER: UNDERGROUND UTILITY TRADESMAN AR 08/22/2017 06/30/2018** $12.650 $9.600 $3.000 AP $2.000 $0.450 $0.600 8 $28.300 $34.630 $34.630 D $40.950 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE TRADESMAN I AS 08/22/2017 06/30/2018** $12.650 $9.600 $0.000 AP $2.000 $0.450 $0.600 8 $25.300 $31.630 $31.630 D $37.950 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE TRADESMAN II AS 08/22/2017 06/30/2018** $12.650 $9.600 $3.000 AP $2.000 $0.450 $0.600 8 $28.300 $34.630 $34.630 D $40.950 HolidaysScope of WorkTravel & Subsistence
PLUMBER: PLUMBER, STEAMFITTER, REFRIGERATION FITTER (HVAC) 08/22/2017 06/30/2018* $60.910 A $16.210 AT $21.920 AU $0.000 F $1.450 $0.850 AV 8 $101.340 $135.550 E $135.550 E $169.750 HolidaysScope of WorkTravel & Subsistence
PLUMBER: CONSTRUCTION TRADESMAN (YEAR 2) 08/22/2017 06/30/2018* $19.230 A $10.700 AP $0.500 AP $0.000 F $0.000 $0.250 AW 8 $30.680 $40.300 E $40.300 E $49.910 HolidaysScope of WorkTravel & Subsistence
PLUMBER: CONSTRUCTION TRADESMAN (YEAR 3) 08/22/2017 06/30/2018* $24.830 A $10.700 AP $0.500 AP $0.000 F $0.000 $0.250 AW 8 $36.280 $48.700 E $48.700 E $61.110 HolidaysScope of WorkTravel & Subsistence
PLUMBER: CONSTRUCTION TRADESMAN (YEAR 4) 08/22/2017 06/30/2018* $26.210 A $10.700 AP $0.500 AP $0.000 F $0.000 $0.250 AW 8 $37.660 $50.770 E $50.770 E $63.870 HolidaysScope of WorkTravel & Subsistence
PLUMBER: CONSTRUCTION TRADESMAN (YEAR 5) 08/22/2017 06/30/2018* $29.200 A $10.700 AP $2.250 AP $0.000 F $0.000 $0.250 AW 8 $42.400 $57.010 E $57.010 E $71.600 HolidaysScope of WorkTravel & Subsistence
PLUMBER: SERVICE AND REPAIR 08/22/2017 06/30/2018* $60.910 A $16.210 AT $21.920 AU $0.000 F $1.450 $0.850 AV 8 $101.340 $135.550 $135.550 AX $135.550 HolidaysScope of WorkTravel & Subsistence
PLUMBER: SPRINKLER FITTER (FIRE PROTECTION AND FIRE CONTROL SYSTEMS) 08/22/2017 07/31/2018* $61.920 A $10.270 $17.200 $0.000 F $1.100 $0.450 8 $90.940 $121.900 $121.900 $152.860 HolidaysScope of WorkTravel & Subsistence
#ROOFER ROOFER, KETTLEMAN 08/22/2017 07/31/2018* $38.310 AY $9.660 $6.960 $3.250 $0.850 $0.640 8 $59.670 $78.170 AZ $78.170 BA $96.670 HolidaysScope of WorkTravel & Subsistence
ROOFER HELPER 08/22/2017 07/31/2018* $34.610 AY $9.660 $6.960 $3.250 $0.850 $0.640 8 $55.970 $72.620 AZ $72.620 BA $89.270 HolidaysScope of WorkTravel & Subsistence
ROOFER KETTLEMAN (2 KETTLES) 08/22/2017 07/31/2018* $40.310 AY $9.660 $6.960 $3.250 $0.850 $0.640 8 $61.670 $81.170 AZ $81.170 BA $100.670 HolidaysScope of WorkTravel & Subsistence
ROOFER BITUMASTIC, ENAMELER, COAL TAR, PITCH AND MASTIC WORKER 08/22/2017 07/31/2018* $40.310 AY $9.660 $6.960 $3.250 $0.850 $0.640 8 $61.670 $81.170 AZ $81.170 BA $100.670 HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER 08/22/2017 07/01/2018* $57.090 H $14.200 BB $27.960 BC $0.000 F $1.430 $0.710 8 $101.390 $133.110 J $133.110 J $164.820 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER TOTAL SHEET METAL CONTRACT OF $200000 OR LESS 08/22/2017 07/01/2018* $50.290 H $14.200 BB $26.580 BC $0.000 F $1.430 $0.710 8 $93.210 $121.150 J $121.150 J $149.090 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER SERVICE MECHANIC (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2017 07/01/2018* $39.400 H $13.600 BD $15.080 BC $0.000 F $1.330 $0.710 8 $70.120 $91.070 BE $91.070 BE $112.020 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER SERVICE TECHNICIAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2017 07/01/2018* $35.500 H $13.600 BD $9.810 BC $0.000 F $1.330 $0.710 8 $60.950 $79.500 BE $79.500 BE $98.050 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER AIR CONDITIONING SPECIALIST (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2017 07/01/2018* $31.440 H $13.600 BD $4.630 BC $0.000 F $1.310 $0.710 8 $51.690 $67.910 J $67.910 J $84.130 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER AIR CONDITIONING JOURNEYMAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2017 07/01/2018* $36.740 H $13.600 BB $10.090 BC $0.000 F $1.310 $0.710 8 $62.450 $81.570 J $81.570 J $100.690 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER METAL DECK & SIDING 08/22/2016 06/30/2017* $35.640 H $13.980 AP $19.200 BF $0.000 F $0.310 BG $0.000 8 $69.130 $87.950 J $87.950 J $106.770 HolidaysScope of WorkTravel & Subsistence
#TERRAZZO FINISHER BH 08/22/2017 06/30/2018** $35.140 BI $9.850 $5.700 $0.000 F $0.800 $0.850 8 $52.340 $67.730 J $67.730 J $83.120 HolidaysScope of WorkTravel & Subsistence
#TERRAZZO WORKER BH 08/22/2017 06/30/2018** $44.110 BI $9.850 $15.000 $0.000 F $0.800 $1.040 8 $70.800 $90.000 J $90.000 J $109.200 HolidaysScope of WorkTravel & Subsistence
#TILE FINISHER 08/22/2017 09/30/2017** $26.480 BJ $8.980 $4.650 $1.000 $0.790 $1.550 8 $43.450 $56.690 $56.690 D $69.930 HolidaysScope of WorkTravel & Subsistence
TILE FINISHER RED CIRCLED FINISHER 08/22/2017 09/30/2017** $32.460 BJ $8.980 $5.100 $1.300 $0.790 $1.560 8 $50.190 $66.420 $66.420 D $82.650 HolidaysScope of WorkTravel & Subsistence
#TILE SETTER 08/22/2017 09/30/2017** $43.300 BJ $8.980 $6.150 $2.500 $1.120 $2.240 8 $64.290 $85.940 $85.940 D $107.590 HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER 08/22/1998 12/31/1998* $12.700 $3.200 $0.780 $0.630 BK $0.000 $0.000 8 $17.310 $23.660 BL $23.660 BL $23.660 BL HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER PUMP INSTALLER 08/22/1998 12/31/1998* $12.700 $3.200 $0.780 $0.630 BK $0.000 $0.000 8 $17.310 $23.660 BL $23.660 BL $23.660 BL HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER HELPER 02/22/2017 03/31/2017* $10.500 $3.200 $0.780 $0.520 BM $0.000 $0.000 8 $15.000 $20.250 BL $20.250 BL $20.250 BL HolidaysScope of WorkTravel & Subsistence

Go to increase page

FOOTNOTES

*
EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
#
INDICATES AN APPRENTICEABLE CRAFT. THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @ HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.
&
THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.
A
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
B
VACATION IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER
C
INCLUDES AMOUNT FOR INDUSTRY PROMOTION FUND, INTERNATIONAL MASONRY INSTITUTE, LABOR MANAGEMENT COOPERATION COMMITTEE, AND VACATION TRUST FUND.
D
SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
E
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
F
INCLUDED IN STRAIGHT-TIME HOURLY RATE.
G
RATE APPLIES TO THE FIRST 10 HOURS WORKED ON SATURDAY. ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
H
INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
I
IN THE EVENT A CREW ON A PROJECT IS PREVENTED FROM WORKING ON A REGULAR WEEK DAY DUE TO INCLEMENT WEATHER OR ACT OF GOD, THAT CREW WILL BE PERMITTED TO WORK ON THE FOLLOWING SATURDAY AT STRAIGHT TIME ON A VOLUNTARY BASIS.
J
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
K
INCLUDED IN BASIC HOURLY RATE.
L
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
M
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD.
N
IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES.
O
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
P
INCLUDES AMOUNT WITHHELD FOR WORKING DUES.
Q
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
R
INCLUDES AMOUNT EQUAL TO 0.5% OF THE HOURLY RATE FOR THE ADMINISTRATIVE MAINTENANCE FUND AND THE REMAINING AMOUNT IS FOR THE JOINT ELECTRICAL INDUSTRY FUND.
S
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS UP TO A MAXIMUM OF 10 HOURS IN ANY ONE WEEK OR THE FIRST 8 HOURS WORKED ON SATURDAY IF NO OVERTIME HAS BEEN WORKED DURING THE WEEK. IF OVERTIME IS WORKED MONDAY THROUGH FRIDAY, SUBTRACT THAT AMOUNT OF TIME FROM THE TIME ALLOWED AT TIME AND ONE HALF (1 1/2) ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY/HOLIDAY RATE.
T
THE MATERIAL HANDLER MAY BE UTILIZED IN CONJUNCTION WITH BOTH INSIDE AND LINE PROJECTS. THE RATIO OF MATERIAL HANDLER TO JOURNEYMEN SHALL BE ONE (1) MATERIAL HANDLER TO THREE (3) JOURNEYMEN.
U
ALL CREWS, WITHOUT CONSIDERATION TO THE NUMBER OF INDIVIDUALS IN THE CREW, SHALL INCLUDE A CHIEF OF PARTY. A CREW CONSISTS OF ONE (1) OR MORE EMPLOYEES PERFORMING FIELD AND CONSTRUCTION SURVEY WORK.
V
INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
W
INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.
X
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS, MONDAY THROUGH FRIDAY. ALL OTHER OVERTIME IS PAID AT THE SUNDAY/HOLIDAY RATE.
Y
RATE APPLIES TO THE FIRST 12 OVERTIME HOURS WORKED. ALL OTHER OVERTIME IS PAID AT THE SUNDAY/HOLIDAY RATE. IN THE EVENT IT IS NOT REASONABLY POSSIBLE TO COMPLETE 40 HOURS OF WORK ON AN 8 HOUR DAY, MONDAY THROUGH FRIDAY, THEN THE BALANCE OF THE 40 HOURS, UP TO 8 HOURS, MAY BE WORKED ON SATURDAY AT THE STRAIGHT-TIME RATE.
Z
INCLUDES AN AMOUNT PER HOUR WORKED FOR IUPAT, IARP, AND RETIREE PENSION.
AA
INCLUDES AMOUNTS FOR INDUSTRY FUND, WORK PRESERVATION FUND, AND LABOR MANAGEMENT COOPERATION INITIATIVE
AB
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND FIRST 8 HOURS WORKED ON DESIGNATED DAYS OFF; ALL OTHER TIME IS PAID AT THE SATURDAY, SUNDAY AND HOLIDAY OVERTIME RATE.
AC
EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFFOLD SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.
AD
INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.
AE
RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
AF
DESIGNATED DAYS OFF SHALL BE PAID AT THE SATURDAY OVERTIME RATE; PLEASE REFER TO THE HOLIDAY PROVISIONS FOR A LIST OF DESIGNATED DAYS OFF.
AG
INCLUDES AMOUNTS FOR VACATION AND DUES CHECK OFF
AH
PLEASE NOTE THAT THE TAPER CLEAN-UP APPLIES ONLY TO THE TAPER CLASSIFICATION.
AI
INCLUDES AN AMOUNT FOR DUES CHECK OFF
AJ
INCLUDES AN AMOUNT WITHHELD FOR DUES CHECKOFF WHICH IS NOT FACTORED IN OVERTIME AND HOLIDAY WAGE RATES. EMPLOYEES WORKING ON AND BEHIND PLASTER GUNS SHALL RECEIVE AN ADDITIONAL $5.00 PER DAY ABOVE THE WAGE RATE.
AK
RATE APPLIES TO THE FIRST 8 HOURS WORKED; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AL
ALL HOD CARRIERS WORKING ON THE HOSE SHALL RECEIVE $5.00 PER DAY OVER SCALE.
AM
INCLUDES AN AMOUNT FOR VACATION, DUES CHECK-OFF AND ORGANIZING DUES WHICH ARE NOT FACTORED INTO OVERTIME.
AN
AMOUNT IS FOR INDUSTRY PROMOTION FUND.
AO
RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
AP
PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AQ
THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE.
AR
THERE SHALL BE NO MORE THAN THREE TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON EACH JOBSITE.
AS
THERE SHALL BE NO MORE THAN FOUR TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON EACH JOBSITE. MAINTENANCE WORK, BOTH DURING AND AFTER THE PLANT ESTABLISHMENT PERIOD, MAY BE PERFORMED BY LANDSCAPE TRADESMEN WITHOUT THE SUPERVISION OF A JOURNEYMAN PIPEFITTER.
AT
INCLUDES AN AMOUNT FOR HEALTH AND WELFARE EXTENDED RESERVE WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AU
INCLUDES AN AMOUNT FOR 401A-PART B PENSION WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AV
$0.50 TO SUPPLEMENTAL UNEMPLOYMENT.
AW
AMOUNT IS FOR CONTRACT ADMINISTRATION
AX
SATURDAY MAY BE PAID AT STRAIGHT TIME IF THE WORK WEEK IS TUESDAY THROUGH SATURDAY.
AY
INCLUDES AN AMOUNT WITHHELD FOR DUES CHECK OFF WHICH IS NOT FACTORED IN OVERTIME AND HOLIDAY WAGE RATES.
AZ
RATE APPLIES TO THE FIRST 2 OVERTIME HOURS ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
BA
IN THE EVENT THAT CONDITIONS ON ONE OR MORE DAYS DURING THE REGULAR WORK WEEK PREVENT EMPLOYEES FROM WORKING ON SCHEDULED WORK DURING SUCH WEEK, WORK MAY BE PERFORMED ON SATURDAY AT STRAIGHT TIME RATES OF PAY.
BB
INCLUDES SMOHIT AND SHC. EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
BC
INCLUDES AN AMOUNT FOR PENSION WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
BD
INCLUDES SHC. EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
BE
RATE APPLIES TO FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY DURING THE EMPLOYEES NORMAL WORKING HOURS. ALL OTHER OVERTIME HOURS SHALL BE PAID AT THE SUNDAY AND HOLIDAY DOUBLE TIME RATE.
BF
INCLUDES AN AMOUNT FOR PENSION FACTORED AT THE OVERTIME MULTIPLIER RATE.
BG
INCLUDES $0.04 FOR SCHOLAR FUND.
BH
THE RATIO OF TERRAZZO FINISHER HOURS TO TERRAZZO WORKER HOURS SHALL NOT EXCEED TWO (2) TO ONE (1).
BI
INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
BJ
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF, WHICH IS FACTORED IN THE OVERTIME RATES. ANY EMPLOYEE WORKING UNDERGROUND SHALL RECEIVE $1.00 PER HOUR IN ADDITION TO REGULAR WAGES.
BK
RATE APPLIES TO FIRST YEAR OF EMPLOYMENT ONLY; $0.88 AFTER 2 YEARS OF EMPLOYMENT.
BL
RATE APPLIES TO ALL TIME WORKED IN EXCESS OF 8 HOURS PER DAY OR 40 HOURS PER WEEK AND FOR ALL HOURS ON SUNDAYS AND HOLIDAYS. RATE DOES NOT INCLUDE ANY ADDITIONAL AMOUNT THAT MAY BE REQUIRED FOR VACATION/HOLIDAY PAYMENT.
BM
RATE APPLIES TO FIRST YEAR OF EMPLOYMENT ONLY; $0.72 AFTER 2 YEARS OF EMPLOYMENT.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH THE DIRECTOR OF INDUSTRIAL RELATIONS. IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE. YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

TRAVEL AND/OR SUBSISTENCE: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH WORKER TO EXECUTE THE WORK. YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

Return to main page