GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: LOS ANGELES COUNTY

DETERMINATION: LOS-2016-1

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE BASIC HOURLY RATE BASIC HOURLY RATE FOOTNOTE HEALTH AND WELFARE HEALTH AND WELFARE FOOTNOTE PENSION PENSION FOOTNOTE VACATION/ HOLIDAY VACATION/ HOLIDAY FOOTNOTE TRAINING TRAINING FOOTNOTE OTHER PAYMENTS OTHER PAYMENTS FOOTNOTE HOURS HOURS FOOTNOTE TOTAL HOURLY RATE DAILY OVERTIME HOURLY RATE DAILY OVERTIME HOURLY RATE FOOTNOTE SATURDAY OVERTIME HOURLY RATE SATURDAY OVERTIME HOURLY RATE FOOTNOTE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE FOOTNOTE HOLIDAY PROVISIONS SCOPE OF WORK PROVISIONS TRAVEL & SUBSISTENCE PROVISIONS
#BRICKLAYER, STONEMASON, MARBLE MASON, CEMENT BLOCKLAYER, POINTER, CAULKER, CLEANER 08/22/2015 04/30/2016* $37.930 A $7.500 $6.900 $0.000 $0.780 B $0.350 8 C $53.460 $72.430 D $72.430 D $91.390 HolidaysScope of WorkTravel & Subsistence
#BRICKLAYER: MASON FINISHER 08/22/2015 04/30/2016* $26.550 A $7.500 $6.900 $0.000 $0.670 E $0.350 8 C $41.970 $55.240 D $55.240 D $68.520 HolidaysScope of WorkTravel & Subsistence
#BRICK TENDER F 08/22/2015 06/30/2016* $29.570 $6.860 $6.500 $3.900 G $0.650 $0.470 8 C $47.950 $62.740 $62.740 $77.520 HolidaysScope of WorkTravel & Subsistence
#BRICK TENDER: FORKLIFT OPERATOR 08/22/2015 06/30/2016* $30.020 $6.860 $6.500 $3.900 G $0.650 $0.470 8 C $48.400 $63.410 $63.410 $78.420 HolidaysScope of WorkTravel & Subsistence
#CARPET, LINOLEUM, RESILIENT TILE LAYER 02/22/2016 04/30/2016* $29.850 H $5.080 $6.300 $2.050 $0.630 $0.200 8 $44.110 $59.040 $59.040 I $73.960 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, MATERIAL HANDLER J 02/22/2016 04/30/2016* $10.000 H $5.080 $2.280 $0.550 $0.630 $0.100 8 $18.640 $23.640 $23.640 I $28.640 HolidaysScope of WorkTravel & Subsistence
#DRYWALL FINISHER DRYWALL FINISHER K 02/22/2016 09/30/2016* $32.050 L $7.950 $5.130 $3.070 $0.670 $0.470 8 $49.340 $65.360 $65.360 M $81.390 HolidaysScope of WorkTravel & Subsistence
DRYWALL FINISHER DRYWALL FINISHER 02/22/2016 09/30/2016* $36.180 H $7.950 $5.130 $3.070 $0.670 $0.470 8 $53.470 $71.560 $71.560 M $89.650 HolidaysScope of WorkTravel & Subsistence
#ELECTRICIAN: COMM & SYSTEM INSTALLER 02/22/2016 12/25/2016** $30.730 $8.310 $4.120 N $0.000 $0.650 $0.250 O 8 $44.980 $60.810 P $60.810 P $76.630 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: INSIDE WIREMAN, RADIO MONITOR TECHNICIAN 02/22/2016 07/31/2016** $40.800 $11.540 $14.170 Q $0.000 R $0.660 $0.450 8 $68.840 $89.860 P $89.860 P $110.870 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: CABLE SPLICER-WELDER 02/22/2016 07/31/2016** $42.840 $11.540 $14.170 Q $0.000 R $0.660 $0.450 8 $70.950 $93.010 P $93.010 P $115.070 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: TUNNEL WIREMAN 02/22/2016 07/31/2016** $44.880 $11.540 $14.170 Q $0.000 R $0.660 $0.450 8 $73.050 $96.160 P $96.160 P $119.270 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: TUNNEL CABLE SPLICER 02/22/2016 07/31/2016** $47.120 $11.540 $14.170 Q $0.000 R $0.660 $0.450 8 $75.350 $99.620 P $99.620 P $123.890 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: TRANSPORTATION SYSTEMS ELECTRICIAN 02/22/2016 07/31/2016** $40.800 $11.540 $14.170 Q $0.000 R $0.660 $0.450 8 $68.840 $89.860 P $89.860 P $110.870 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: TRANSPORTATION SYSTEMS ELECTRICIAN (CABLE SPLICING, WELDING, AND NETA TESTING) 02/22/2016 07/31/2016** $42.840 $11.540 $14.170 Q $0.000 R $0.660 $0.450 8 $70.950 $93.010 P $93.010 P $115.070 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: TRANSPORTATION SYSTEMS TECHNICIAN S 02/22/2016 07/31/2016** $30.600 $11.540 $14.170 Q $0.000 R $0.660 $0.450 8 $58.340 $74.100 P $74.100 P $89.860 HolidaysScope of WorkTravel & Subsistence
#FIELD SURVEYOR: CHIEF OF PARTY (018.167-010) T 02/22/2016 09/30/2016* $44.810 $11.200 $9.650 $4.150 G $0.900 $0.150 8 $70.860 $93.260 P $93.260 P $115.670 HolidaysScope of WorkTravel & Subsistence
FIELD SURVEYOR: INSTRUMENTMAN (018.167-034) T 02/22/2016 09/30/2016* $42.310 $11.200 $9.650 $4.150 G $0.900 $0.150 8 $68.360 $89.510 P $89.510 P $110.670 HolidaysScope of WorkTravel & Subsistence
FIELD SURVEYOR: CHAINMAN/RODMAN (869.567-010) T 02/22/2016 09/30/2016* $41.730 $11.200 $9.650 $4.150 G $0.900 $0.150 8 $67.780 $88.650 P $88.650 P $109.510 HolidaysScope of WorkTravel & Subsistence
#GLAZIER 02/22/2016 05/31/2016** $40.700 U $7.000 V $13.030 $0.000 W $0.770 $0.530 8 $62.030 $81.380 X $81.380 X $100.730 HolidaysScope of WorkTravel & Subsistence
#MARBLE FINISHER 08/22/2015 05/31/2016** $28.450 Y $9.160 $2.710 $0.000 $0.810 $0.330 8 Z $41.460 $55.690 AA $55.690 AB $69.910 AC HolidaysScope of WorkTravel & Subsistence
#PAINTER INDUSTRIAL PAINTER AD 08/22/2015 06/30/2016* $32.020 L $8.050 $3.040 $1.050 $0.790 $0.820 8 $45.770 $61.780 AE $61.780 AE $61.780 AE HolidaysScope of WorkTravel & Subsistence
#PAINTER: PAINTER, LEAD ABATEMENT AD 08/22/2015 06/30/2016* $30.720 L $8.050 $3.040 $1.050 $0.690 $0.820 8 $44.370 $59.730 AE $59.730 AE $59.730 AE HolidaysScope of WorkTravel & Subsistence
PAINTER: REPAINT PAINTER, LEAD ABATEMENT AD 08/22/2015 06/30/2016* $27.290 L $8.050 $3.040 $1.050 $0.690 $0.820 8 $40.940 $54.580 AF $54.580 AF $54.580 AF HolidaysScope of WorkTravel & Subsistence
PAINTER: PAINTER, LEAD ABATEMENT AG 08/22/2015 06/30/2016* $26.410 L $8.050 $3.040 $1.050 $0.690 $0.820 8 $40.060 $53.260 AE $53.260 AE $53.260 AE HolidaysScope of WorkTravel & Subsistence
PAINTER: REPAINT PAINTER, LEAD ABATEMENT AG 08/22/2015 06/30/2016* $24.190 L $8.050 $3.040 $1.050 $0.690 $0.820 8 $37.840 $49.930 AF $49.930 AF $49.930 AF HolidaysScope of WorkTravel & Subsistence
PAINTER: INDUSTRIAL REPAINT PAINTER AD 08/22/2015 06/30/2016* $28.450 L $8.050 $3.040 $1.050 $0.790 $0.820 8 $42.200 $56.430 AF $56.430 AF $56.430 AF HolidaysScope of WorkTravel & Subsistence
#PLASTERER 08/22/2015 08/02/2016** $32.910 $8.930 $4.210 $5.530 AH $0.630 $0.990 8 AI $53.200 $69.650 AE $69.650 AJ $86.110 HolidaysScope of WorkTravel & Subsistence
#PLASTER TENDER AK 08/22/2015 08/02/2016** $32.710 $7.000 $5.900 $5.050 AH $1.020 $1.020 8 $52.700 $69.060 AL $69.060 AM $85.410 HolidaysScope of WorkTravel & Subsistence
PLASTER TENDER PLASTER CLEAN-UP LABORER 08/22/2015 08/02/2016** $30.160 $7.000 $5.900 $5.050 AH $1.020 $1.020 8 $50.150 $65.230 AL $65.230 AM $80.310 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: PLUMBER, INDUSTRIAL AND GENERAL PIPEFITTER 08/22/2015 06/30/2016** $42.930 Y $7.110 $11.050 AN $3.030 AO $2.550 $1.000 AP 8 $67.670 $89.850 AQ $89.850 AQ $110.520 HolidaysScope of WorkTravel & Subsistence
PLUMBER: SEWER AND STORM DRAIN PIPELAYER 08/22/2015 06/30/2016** $33.110 Y $7.110 $8.200 AN $1.000 AO $2.170 $1.000 AP 8 $52.590 $68.850 $68.850 AR $84.600 HolidaysScope of WorkTravel & Subsistence
PLUMBER: SEWER AND STORM DRAIN PIPE TRADESMAN AS 08/22/2015 06/30/2016** $17.060 Y $7.110 $0.380 $0.000 $1.600 $0.850 AP 8 $27.000 $34.730 $34.730 AR $42.460 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE/IRRIGATION FITTER 08/22/2015 06/30/2016** $27.620 Y $7.110 $11.050 AN $2.490 AO $1.940 $0.800 AP 8 AR $51.010 $66.070 $66.070 $79.880 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE/IRRIGATION TRADESMAN AT 08/22/2015 06/30/2016* $13.390 Y $2.000 $0.880 AN $0.000 $0.100 $0.750 AP 8 AR $17.120 $23.820 $23.820 $30.510 HolidaysScope of WorkTravel & Subsistence
PLUMBER: REFRIGERATION SERVICE AND REPAIR (HVACR) 02/22/2016 09/04/2016* $42.500 H $10.520 $8.840 AU $0.000 R $1.300 $0.600 AV 8 $63.760 $85.010 $85.010 AW $105.110 AC HolidaysScope of WorkTravel & Subsistence
PLUMBER: REFRIGERATION SERVICE AND REPAIR TRADESMAN (HVACR) 02/22/2016 09/04/2016* $12.900 H $10.520 $1.400 $0.000 R $0.500 $0.480 AV 8 $25.800 $32.250 $32.250 AW $38.250 AC HolidaysScope of WorkTravel & Subsistence
PLUMBER: FIRE SPRINKLER FITTER (PROTECTION AND CONTROL SYSTEMS, OVERHEAD AND UNDERGROUND) AX 02/22/2016 03/31/2016* $35.570 $8.770 $11.050 AY $0.000 $0.450 $0.250 8 $56.090 $73.880 $73.880 $91.660 HolidaysScope of WorkTravel & Subsistence
PLUMBER: FIRE SPRINKLER FITTER (PROTECTION AND CONTROL SYSTEMS, OVERHEAD AND UNDERGROUND) AZ 02/22/2016 08/31/2017* $40.060 $8.920 $14.300 $0.000 R $1.350 $0.550 BA 8 $65.180 $85.210 $85.210 BB $105.240 HolidaysScope of WorkTravel & Subsistence
#ROOFER 02/22/2016 07/31/2016** $35.320 BC $7.560 $6.390 BD $0.000 BE $0.400 $0.570 BF 8 $50.240 $66.070 AQ $66.070 AQ $81.910 HolidaysScope of WorkTravel & Subsistence
ROOFER PITCH WORK 02/22/2016 07/31/2016** $37.070 BC $7.560 $6.390 BD $0.000 BE $0.400 $0.570 BF 8 $51.990 $68.700 AQ $68.700 AQ $85.410 HolidaysScope of WorkTravel & Subsistence
ROOFER PREPARER 02/22/2016 07/31/2016** $36.320 BC $7.560 $6.390 BD $0.000 BE $0.400 $0.570 BF 8 $51.240 $67.570 AQ $67.570 AQ $83.910 HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER BG 08/22/2015 06/30/2016** $41.260 L $9.870 $14.710 BH $0.000 $0.820 $0.650 8 $67.310 $87.940 BI $87.940 BI $108.570 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER SHEET METAL WORKER BJ 08/22/2015 06/30/2016** $31.530 H $9.870 $13.720 BK $0.000 $1.670 $0.350 8 C $57.140 $72.900 BL $72.900 BL $88.670 AC HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER LIGHT COMMERCIAL SHEET METAL WORKER UP TO AND INCLUDING 10000 SQUARE FEET. BJ 08/22/2015 06/30/2016** $25.220 H $9.870 $13.720 BK $0.000 $1.670 $0.350 8 C $50.830 $63.440 $63.440 $63.440 HolidaysScope of WorkTravel & Subsistence
#TERRAZZO FINISHER 08/22/2014 08/31/2015* $27.530 H $7.510 $3.270 $0.000 R $0.490 $0.120 8 AR $38.920 $52.690 AA $52.690 AB $66.450 AC HolidaysScope of WorkTravel & Subsistence
#TERRAZZO WORKER 08/22/2014 08/31/2015* $34.570 H $8.300 $3.270 $0.000 R $0.570 $0.120 8 AR $46.830 $64.110 AA $64.110 AB $81.400 AC HolidaysScope of WorkTravel & Subsistence
#TILE FINISHER 08/22/2015 05/31/2016** $23.780 Y $8.430 $1.800 $0.000 $0.750 $0.280 8 Z $35.040 $46.930 AA $46.930 AB $58.820 AC HolidaysScope of WorkTravel & Subsistence
#TILE LAYER 08/22/2015 05/31/2016** $35.140 Y $9.250 $5.680 $0.000 $0.910 $0.370 8 Z $51.350 $68.920 AA $68.920 AB $86.490 AC HolidaysScope of WorkTravel & Subsistence

Go to increase page

FOOTNOTES

*
EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
#
INDICATES AN APPRENTICEABLE CRAFT. THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @ HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.
&
THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.
A
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF AND CONTRACT COMPLIANCE.
B
INCLUDES AN AMOUNT, $0.52, FOR THE IMI TRAINING FUND.
C
SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER, OR REASONS BEYOND THE CONTROL OF THE EMPLOYER.
D
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
E
INCLUDES AN AMOUNT, $0.41, FOR THE IMI TRAINING FUND.
F
THE RATIO OF BRICK TENDERS TO BRICKLAYERS SHALL BE AS FOLLOWS: ONE (1) BRICK TENDER TO NO MORE THAN THREE (3) BRICKLAYERS DURING THE INSTALLATION OF BLOCK ON A TYPICAL MASONRY PROJECT.
G
INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.
H
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
I
RATE APPLIES TO THE FIRST 12 HOURS ON SATURDAY, ALL OTHER TIME IS PAID AT DOUBLE TIME.
J
A MATERIAL HANDLER MAY BE UTILIZED IN RATIO OF ONE (1) MATERIAL HANDLER WITH ANY FIVE (5) JOURNEYMEN ON ANY GIVEN PROJECT.
K
RATE ONLY APPLIES TO WORK PERFORMED IN ANTELOPE VALLEY WHICH IS HIGHWAY 5, SOUTH ON U.S. 5 TO HIGHWAY N2; EAST ON HIGHWAY N2 TO PALMDALE BLVD TO HIGHWAY 14; SOUTH TO HIGHWAY 18; EAST TO HIGHWAY 395.
L
INCLUDES AMOUNT WITHHELD FOR WORKING DUES.
M
RATE APPLIES TO FIRST 8 HOURS ONLY. DOUBLE TIME THEREAFTER. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORK WEEK DUE TO INCLEMENT WEATHER.
N
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD.
O
INCLUDES AN AMOUNT FOR THE NATIONAL LABOR-MANAGEMENT COOPERATION FUND AND THE ADMINISTRATIVE MAINTENANCE FUND.
P
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
Q
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
R
INCLUDED IN STRAIGHT-TIME HOURLY RATE.
S
THE MAXIMUM ALLOWABLE RATIO IS ONE TRANSPORTATION SYSTEMS TECHNICIAN TO ONE JOURNEYMAN ON EACH JOB.
T
DICTIONARY OF OCCUPATIONAL TITLES, FOURTH EDITION, 1977, U.S. DEPARTMENT OF LABOR.
U
INCLUDES AMOUNT WITHHELD FOR DUES CHECKOFF, WHICH IS FACTORED IN THE OVERTIME RATES. INCLUDES $2.00 OF VACATION THAT IS NOT FACTORED IN THE OVERTIME RATES.
V
INCLUDES AN AMOUNT PER HOUR WORKED OR PAID TO DISABILITY FUND.
W
INCLUDED IN STRAIGHT-TIME HOURLY RATE WHICH IS NOT FACTORED IN THE OVERTIME RATES.
X
RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
Y
INCLUDES AMOUNT WITHHELD FOR ADMINISTRATIVE DUES.
Z
SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO A WORK STOPPAGE SUCH AS RAIN OR ANY OTHER STOPPAGE THAT IS BEYOND THE CONTROL OF THE CONTRACTOR.
AA
RATE APPLIES TO FIRST TWO DAILY OVERTIME HOURS WORKED; ALL OTHER OVERTIME IS PAID AT THE HOLIDAY OVERTIME HOURLY RATE.
AB
RATE APPLIES TO THE FIRST 8 HOURS WORKED ON A SIXTH OR SEVENTH CONSECUTIVE DAY DURING ANY ONE CALENDAR WEEK UP TO 50 HOURS IN ANY ONE CALENDAR WEEK. ALL OTHER TIME IS PAID AT THE HOLIDAY RATE.
AC
RATE APPLIES TO WORK ON HOLIDAYS ONLY; SUNDAYS ARE PAID AT THE SATURDAY OVERTIME HOURLY RATE.
AD
AN ADDITIONAL $0.25 PER HOUR WILL BE ADDED TO THE BASIC HOURLY RATE WHEN PERFORMING PAPERHANGING WORK.
AE
DOUBLE TIME SHALL BE PAID FOR ALL HOURS WORKED OVER 12 HOURS IN ANY ONE DAY.
AF
ON REPAINT WAGE WORK ANY 8 HOURS IN A 24 HOUR PERIOD MONDAY THROUGH SUNDAY SHALL BE THE WORK DAY AND ANY 40 HOURS IN A WEEK SHALL BE THE WORK WEEK, PROVIDED THAT THE 40 HOURS IS WORKED IN 5 CONSECUTIVE DAYS (LEGAL HOLIDAYS WILL NOT BE COUNTED IN THE 5 CONSECUTIVE DAYS). FOR ALL WORK UNDER THIS CRAFT/CLASSIFICATION DOUBLE TIME SHALL BE PAID FOR ALL HOURS WORKED OVER 12 HOURS IN ANY ONE DAY.
AG
RATE ONLY APPLIES TO WORK PERFORMED IN ANTELOPE VALLEY, WHICH IS HIGHWAY 5, SOUTH ON U.S. 5 TO HIGHWAY N2; EAST ON HIGHWAY N2 TO PALMDALE BLVD TO HIGHWAY 14; SOUTH TO HIGHWAY 18; EAST TO HIGHWAY 395. AN ADDITIONAL $0.25 IS ADDED TO THE BASIC HOURLY RATE WHEN PERFORMING PAPERHANGING WORK.
AH
INCLUDES AN AMOUNT PER HOUR WORKED OR PAID FOR SUPPLEMENTAL DUES.
AI
SATURDAY IN THE SAME WORKWEEK MAY BE WORKED AT THE STRAIGHT-TIME HOURLY RATE IF IT IS NOT POSSIBLE TO COMPLETE FORTY HOURS OF WORK MONDAY THROUGH FRIDAY WHEN THE JOB IS SHUT DOWN DUE TO INCLEMENT WEATHER OR SIMILAR ACT OF GOD, OR BEYOND THE CONTRACTOR'S CONTROL.
AJ
RATE APPLIES TO THE FIRST 8 HOURS WORKED; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AK
THE RATIO OF PLASTER TENDERS TO PLASTERERS SHALL BE AS FOLLOWS: THERE SHALL BE A PLASTER TENDER ON THE JOBSITE WHENEVER THERE IS A PLASTERER PERFORMING WORK ON THE JOBSITE, EXCEPT ON SMALL PATCH WORK WHERE ONLY ONE PLASTERER IS PERFORMING WORK. FOR INSIDE BROWN COATINGS THERE SHALL BE 2 PLASTER TENDERS FOR UP TO EVERY 3 PLASTERERS. FOR INSIDE FINISH COATINGS THERE SHALL BE 1 PLASTER TENDER FOR UP TO EVERY 3 PLASTERERS. ON OUTSIDE FINISH AND BROWN COATINGS AND FOR ALL OTHER WORK, THERE SHALL BE 1 PLASTER TENDER FOR UP TO EVERY 2 PLASTERERS.
AL
ALL WORK PERFORMED AFTER TWELVE (12) HOURS IN A DAY SHALL BE PAID AT THE SUNDAY/HOLIDAY RATE.
AM
RATE APPLIES TO THE FIRST EIGHT HOURS ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE. SATURDAY WORK MAY BE PAID AT THE STRAIGHT TIME RATE IF THE JOB IS SHUT DOWN DURING THE NORMAL WORK WEEK DUE TO INCLEMENT WEATHER.
AN
INCLUDES AMOUNT FOR NATIONAL PENSION AND RETIREE'S X-MAS FUND.
AO
FACTORED AT 1.5 TIMES FOR ALL OVERTIME.
AP
INCLUDES AN AMOUNT FOR THE P.I.P.E. LABOR MANAGEMENT COOPERATION COMMITTEE AND THE CONTRACTOR EDUCATION & DEVELOPMENT FUND.
AQ
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AR
SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
AS
PIPE TRADESMEN SHALL NOT BE PERMITTED ON ANY JOB WITHOUT A JOURNEYMAN.
AT
TRADESMEN SHALL ONLY BE USED IF THE FIRST WORKER ON THE JOB IS A LANDSCAPE/IRRIGATION FITTER, SECOND WORKER MUST BE A LANDSCAPE/IRRIGATION FITTER OR APPRENTICE LANDSCAPE/IRRIGATION FITTER. THE 3RD AND 4TH MAY BE A TRADESMAN. THE 5TH MUST BE A LANDSCAPE/IRRIGATION FITTER AND THEREAFTER TRADESMEN WILL BE REFERRED ON A 50-50 BASIS, TO JOURNEYMAN OR APPRENTICE.
AU
INCLUDES AN AMOUNT FOR 401A PLAN.
AV
INCLUDES AN AMOUNT FOR THE P.I.P.E. LABOR MANAGEMENT COOPERATION COMMITTEE TRUST FUND AND FOR PROMOTION FUND.
AW
SATURDAY MAY BE PAID AT STRAIGHT TIME IF THE WORK WEEK IS TUESDAY THROUGH SATURDAY.
AX
RATE APPLIES TO REMAINDER OF COUNTY.
AY
INCLUDES AN AMOUNT FOR SUPPLEMENTAL PENSION FUND.
AZ
RATE APPLIES TO LOS ANGELES CITY LIMITS AND TWENTY-FIVE (25) MILES BEYOND CITY LIMITS OF LOS ANGELES.
BA
AMOUNT IS FOR INDUSTRY PROMOTION FUND AND P.I.P.E. FUND.
BB
RATE APPLIES TO THE FIRST 10 HOURS WORKED ON SATURDAY. ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
BC
INCLUDE AMOUNTS FOR DUES CHECK OFF AND VACATION/HOLIDAY, WHICH ARE NOT FACTORED INTO OVERTIME.
BD
INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
BE
INCLUDED IN BASIC HOURLY RATE. VACATION IS NOT FACTORED INTO OVERTIME
BF
INCLUDE AMOUNTS FOR ADMINISTRATIVE FUND, COMPLIANCE FUND, INDUSTRY FUND, AND RESEARCH AND EDUCATION TRUST FUND.
BG
APPLIES TO THAT PORTION OF THE COUNTY SOUTH OF A STRAIGHT LINE DRAWN BETWEEN GORMAN AND BIG PINES.
BH
PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
BI
RATE APPLIES FOR THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 12 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY/HOLIDAY RATE. SATURDAYS IN THE SAME WORKWEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
BJ
APPLIES TO THAT PORTION OF THE COUNTY NORTH OF A STRAIGHT LINE DRAWN BETWEEN GORMAN AND BIG PINES INCLUDING THE CITIES OF LANCASTER AND PALMDALE.
BK
INCLUDES AMOUNTS FOR LOCAL PENSION, NATIONAL PENSION PLAN, 401(A) PLAN, RETIREE'S SUPPLEMENTAL HEALTH PLAN. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
BL
RATE APPLIES TO FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS ON SATURDAY AND SUNDAY. ALL OTHER OVERTIME HOURS IS AT DOUBLE TIME RATE.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH THE DIRECTOR OF INDUSTRIAL RELATIONS. IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE. YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

TRAVEL AND/OR SUBSISTENCE: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH WORKER TO EXECUTE THE WORK. YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

Return to main page