GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: HUMBOLDT COUNTY

DETERMINATION: HUM-2017-2

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE BASIC HOURLY RATE BASIC HOURLY RATE FOOTNOTE HEALTH AND WELFARE HEALTH AND WELFARE FOOTNOTE PENSION PENSION FOOTNOTE VACATION/ HOLIDAY VACATION/ HOLIDAY FOOTNOTE TRAINING TRAINING FOOTNOTE OTHER PAYMENTS OTHER PAYMENTS FOOTNOTE HOURS HOURS FOOTNOTE TOTAL HOURLY RATE DAILY OVERTIME HOURLY RATE DAILY OVERTIME HOURLY RATE FOOTNOTE SATURDAY OVERTIME HOURLY RATE SATURDAY OVERTIME HOURLY RATE FOOTNOTE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE FOOTNOTE HOLIDAY PROVISIONS SCOPE OF WORK PROVISIONS TRAVEL & SUBSISTENCE PROVISIONS
#BRICKLAYER, BLOCKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON 08/22/2017 04/30/2018** $39.320 A $9.850 $14.190 $3.000 B $0.800 $1.320 C 8 D $68.480 $89.640 E $89.640 E $110.800 HolidaysScope of WorkTravel & Subsistence
BRICKLAYER, BLOCKLAYER: POINTER, CLEANER, CAULKER, WATERPROOFER 08/22/2017 06/30/2018* $46.210 A $9.850 $11.500 $0.000 F $1.490 $0.430 8 D $69.480 $92.590 $92.590 G $115.690 HolidaysScope of WorkTravel & Subsistence
#BRICK TENDER 08/22/2017 06/30/2018** $33.520 H $8.000 $10.680 $0.000 F $0.450 $0.300 8 D $52.950 $69.710 E $69.710 E $86.470 HolidaysScope of WorkTravel & Subsistence
#CARPET, LINOLEUM, RESILIENT TILE LAYER 08/22/2017 06/30/2018** $29.530 A $6.350 I $3.700 $2.260 J $0.250 $0.160 8 $42.250 $58.150 K $58.150 K $74.040 HolidaysScope of WorkTravel & Subsistence
#ELECTRICIAN: COMM & SYSTEM INSTALLER 02/22/2017 11/30/2017* $30.640 $10.550 $5.900 L $0.000 $1.100 $0.210 M 8 $49.470 $65.320 N $65.320 N $81.180 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: COMM & SYSTEM TECH. 02/22/2017 11/30/2017* $34.890 $10.550 $5.900 L $0.000 $1.100 $0.210 M 8 $53.870 $71.920 N $71.920 N $89.970 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: INSIDE WIREMAN 08/22/2017 05/31/2018** $47.400 A $12.000 $7.000 O $0.000 $1.180 $0.310 P 8 $69.550 $94.080 Q $94.080 Q $118.610 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: CABLE SPLICER 08/22/2017 05/31/2018** $52.140 A $12.000 $7.000 O $0.000 $1.180 $0.310 P 8 $74.450 $101.440 Q $101.440 Q $128.420 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: TUNNEL WIREMAN 08/22/2017 05/31/2018** $47.900 A $12.000 $7.000 O $0.000 $1.180 $0.310 P 8 $70.070 $94.860 R $119.640 $119.640 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: TUNNEL CABLE SPLICER 08/22/2017 05/31/2018** $52.640 A $12.000 $7.000 O $0.000 $1.180 $0.310 P 8 $74.970 $102.210 R $129.450 $129.450 HolidaysScope of WorkTravel & Subsistence
#FIELD SURVEYOR: CHIEF OF PARTY S 02/22/2017 02/27/2018* $40.150 $13.680 $11.510 T $3.710 U $0.870 $0.160 8 $70.080 $90.160 V $90.160 W $110.230 HolidaysScope of WorkTravel & Subsistence
FIELD SURVEYOR: INSTRUMENTMAN S 02/22/2017 02/27/2018* $37.060 $13.680 $11.510 T $3.710 U $0.870 $0.160 8 $66.990 $85.520 V $85.520 W $104.050 HolidaysScope of WorkTravel & Subsistence
FIELD SURVEYOR: CHAINMAN/RODMAN S 02/22/2017 02/27/2018* $34.180 $13.680 $11.510 T $3.710 U $0.870 $0.160 8 $64.110 $81.200 V $81.200 W $98.290 HolidaysScope of WorkTravel & Subsistence
GLAZIER 02/22/2017 03/31/2017* $10.500 & $0.000 $0.000 $0.190 $0.000 $0.000 8 $10.690 $15.940 $15.940 $15.940 HolidaysScope of WorkTravel & Subsistence
#MARBLE FINISHER X 02/22/2017 07/31/2017** $31.170 Y $9.850 $4.230 $0.000 Z $0.450 $0.590 8 $46.290 $61.880 AA $77.460 $77.460 HolidaysScope of WorkTravel & Subsistence
#MARBLE MASON X 02/22/2017 07/31/2017** $41.770 Y $9.850 $15.420 $0.000 Z $0.800 $0.820 8 $68.660 $89.540 AA $110.430 $110.430 HolidaysScope of WorkTravel & Subsistence
#PAINTER: BRUSH, SPRAY, PAPERHANGER 08/22/2017 12/31/2017** $32.110 AB $10.150 $7.680 $0.000 Z $0.430 $0.360 8 D $50.730 $66.790 $66.790 AC $82.840 HolidaysScope of WorkTravel & Subsistence
PAINTER: SANDBLASTER, STEAM CLEANER, WATERBLASTER 08/22/2017 12/31/2017** $32.610 AB $10.150 $7.680 $0.000 Z $0.430 $0.360 8 D $51.230 $67.540 $67.540 AC $83.840 HolidaysScope of WorkTravel & Subsistence
PAINTER: EXOTIC MATERIALS 08/22/2017 12/31/2017** $33.110 AB $10.150 $7.680 $0.000 Z $0.430 $0.360 8 D $51.730 $68.290 $68.290 AC $84.840 HolidaysScope of WorkTravel & Subsistence
PAINTER: TAPER 02/22/2017 12/31/2017** $39.980 AD $10.150 $13.580 $0.000 Z $0.560 $0.510 8 $64.780 $84.770 $84.770 D $104.760 AC HolidaysScope of WorkTravel & Subsistence
PAINTER: TAPER CLEAN-UP AE 02/22/2017 12/31/2017* $15.960 AF $10.150 $0.000 $0.000 $0.000 $0.000 8 $26.110 $34.090 $34.090 D $42.070 AC HolidaysScope of WorkTravel & Subsistence
#PLASTERER 08/22/2017 12/31/2017** $32.920 AG $13.280 $11.300 $3.000 $1.150 $1.200 8 $62.850 $78.360 $78.360 AH $93.870 HolidaysScope of WorkTravel & Subsistence
#PLASTER TENDER 08/22/2017 06/30/2018** $31.020 $8.000 $11.350 $2.630 $0.450 $1.030 AI 8 $54.480 $69.990 AJ $69.990 AJ $85.500 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: PLUMBER, PIPEFITTER 02/22/2016 03/31/2016* $42.110 A $12.320 $11.420 AK $0.000 F $1.300 $0.160 AL 8 $67.310 $88.360 AM $88.360 AM $109.420 HolidaysScope of WorkTravel & Subsistence
PLUMBER: UNDERGROUND UTILITY PIPEFITTER 08/22/2017 06/30/2018** $26.850 $9.600 $3.000 AK $2.000 $0.450 $0.600 8 $42.500 $55.930 $55.930 D $69.350 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE PIPEFITTER 08/22/2017 06/30/2018** $26.850 $9.600 $3.000 AK $2.000 $0.450 $0.600 8 $42.500 $55.930 $55.930 D $69.350 HolidaysScope of WorkTravel & Subsistence
PLUMBER: UNDERGROUND UTILITY ASSISTANT JOURNEYMAN AN 08/22/2017 06/30/2018** $15.850 $9.600 $3.000 AK $2.000 $0.450 $0.600 8 $31.500 $39.430 $39.430 D $47.350 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE ASSISTANT JOURNEYMAN AN 08/22/2017 06/30/2018** $15.850 $9.600 $3.000 AK $2.000 $0.450 $0.600 8 $31.500 $39.430 $39.430 D $47.350 HolidaysScope of WorkTravel & Subsistence
PLUMBER: UNDERGROUND UTILITY TRADESMAN AO 08/22/2017 06/30/2018** $12.650 $9.600 $3.000 AK $2.000 $0.450 $0.600 8 $28.300 $34.630 $34.630 D $40.950 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE TRADESMAN I AP 08/22/2017 06/30/2018** $12.650 $9.600 $0.000 AK $2.000 $0.450 $0.600 8 $25.300 $31.630 $31.630 D $37.950 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE TRADESMAN II AP 08/22/2017 06/30/2018** $12.650 $9.600 $3.000 AK $2.000 $0.450 $0.600 8 $28.300 $34.630 $34.630 D $40.950 HolidaysScope of WorkTravel & Subsistence
PLUMBER: FIRE SPRINKLER FITTER (PROTECTION AND CONTROL SYSTEMS, OVERHEAD AND UNDERGROUND) 08/22/2017 12/31/2017** $39.070 $9.170 $11.350 AQ $0.000 $0.470 $0.250 8 $60.310 $79.850 $79.850 $99.380 HolidaysScope of WorkTravel & Subsistence
ROOFER 02/22/2017 03/31/2017* $10.500 & $0.000 $0.000 $0.000 $2.000 $0.000 8 $12.500 $17.750 $17.750 $17.750 HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER 08/22/2017 07/01/2018* $57.090 H $14.200 AR $27.960 AS $0.000 F $1.430 $0.710 8 $101.390 $133.110 Q $133.110 Q $164.820 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER TOTAL SHEET METAL CONTRACT OF $200000 OR LESS 08/22/2017 07/01/2018* $50.290 H $14.200 AR $26.580 AS $0.000 F $1.430 $0.710 8 $93.210 $121.150 Q $121.150 Q $149.090 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER SERVICE MECHANIC (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2017 07/01/2018* $39.400 H $13.600 AT $15.080 AS $0.000 F $1.330 $0.710 8 $70.120 $91.070 AU $91.070 AU $112.020 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER SERVICE TECHNICIAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2017 07/01/2018* $35.500 H $13.600 AT $9.810 AS $0.000 F $1.330 $0.710 8 $60.950 $79.500 AU $79.500 AU $98.050 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER AIR CONDITIONING SPECIALIST (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2017 07/01/2018* $31.440 H $13.600 AT $4.630 AS $0.000 F $1.310 $0.710 8 $51.690 $67.910 Q $67.910 Q $84.130 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER AIR CONDITIONING JOURNEYMAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2017 07/01/2018* $36.740 H $13.600 AR $10.090 AS $0.000 F $1.310 $0.710 8 $62.450 $81.570 Q $81.570 Q $100.690 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER METAL DECK & SIDING 08/22/2016 06/30/2017* $35.640 H $13.980 AK $19.200 AV $0.000 F $0.310 AW $0.000 8 $69.130 $87.950 Q $87.950 Q $106.770 HolidaysScope of WorkTravel & Subsistence
#TERRAZZO FINISHER AX 08/22/2017 06/30/2018** $35.140 AY $9.850 $5.700 $0.000 F $0.800 $0.850 8 $52.340 $67.730 Q $67.730 Q $83.120 HolidaysScope of WorkTravel & Subsistence
#TERRAZZO WORKER AX 08/22/2017 06/30/2018** $44.110 AY $9.850 $15.000 $0.000 F $0.800 $1.040 8 $70.800 $90.000 Q $90.000 Q $109.200 HolidaysScope of WorkTravel & Subsistence
#TILE FINISHER 08/22/2017 09/30/2017** $26.480 AZ $8.980 $4.650 $1.000 $0.790 $1.550 8 $43.450 $56.690 $56.690 D $69.930 HolidaysScope of WorkTravel & Subsistence
TILE FINISHER RED CIRCLED FINISHER 08/22/2017 09/30/2017** $32.460 AZ $8.980 $5.100 $1.300 $0.790 $1.560 8 $50.190 $66.420 $66.420 D $82.650 HolidaysScope of WorkTravel & Subsistence
#TILE SETTER 08/22/2017 09/30/2017** $43.300 AZ $8.980 $6.150 $2.500 $1.120 $2.240 8 $64.290 $85.940 $85.940 D $107.590 HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER DRILLER, PUMP REPAIRMAN 08/22/2007 01/31/2008* $20.170 $8.120 $3.690 $0.800 BA $0.000 $0.000 8 $32.780 $42.870 BB $42.870 BB $42.870 BB HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER PUMP INSTALLER 08/22/2007 01/31/2008* $17.860 $8.120 $3.690 $0.720 BC $0.000 $0.000 8 $30.390 $39.320 BB $39.320 BB $39.320 BB HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER HELPER 08/22/2007 01/31/2008* $12.470 $8.120 $3.690 $0.530 BD $0.000 $0.000 8 $24.810 $31.040 BB $31.040 BB $31.040 BB HolidaysScope of WorkTravel & Subsistence

Go to increase page

FOOTNOTES

*
EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
#
INDICATES AN APPRENTICEABLE CRAFT. THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @ HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.
&
THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.
A
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
B
VACATION IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER
C
INCLUDES AMOUNT FOR INDUSTRY PROMOTION FUND, INTERNATIONAL MASONRY INSTITUTE, LABOR MANAGEMENT COOPERATION COMMITTEE, AND VACATION TRUST FUND.
D
SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
E
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
F
INCLUDED IN STRAIGHT-TIME HOURLY RATE.
G
RATE APPLIES TO THE FIRST 10 HOURS WORKED ON SATURDAY. ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
H
INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
I
THE HEALTH & WELFARE CONTRIBUTION IS REQUIRED FOR EACH HOUR WORKED UP TO A MAXIMUM OF 40 HOURS IN ANY ONE WEEK. THIS COULD AFFECT EITHER THE TOTAL HOURLY RATE OR THE OVERTIME HOURLY RATES.
J
AMOUNT IS EQUAL TO 8% OF THE HOURLY RATE AND IS FACTORED AT THE APPLICABLE OVERTIME HOURLY RATES.
K
RATE APPLIES TO ALL HOURS WORKED IN EXCESS OF 8 HOURS MONDAY THROUGH FRIDAY AND ALL HOURS WORKED ON SATURDAY.
L
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD.
M
IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES.
N
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
O
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
P
IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE FOR ADMINISTRATIVE MAINTENANCE FUND IS ADDED TO THE TOTAL HOURLY RATE AND IS FACTORED INTO THE OVERTIME HOURLY RATE.
Q
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
R
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS WORKED; ALL OTHER OVERTIME IS PAID AT THE SATURDAY, SUNDAY AND HOLIDAY OVERTIME RATE.
S
ALL CREWS, WITHOUT CONSIDERATION TO THE NUMBER OF INDIVIDUALS IN THE CREW, SHALL INCLUDE A CHIEF OF PARTY. A CREW CONSISTS OF ONE (1) OR MORE EMPLOYEES PERFORMING FIELD AND CONSTRUCTION SURVEY WORK.
T
INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
U
INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.
V
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS, MONDAY THROUGH FRIDAY. ALL OTHER OVERTIME IS PAID AT THE SUNDAY/HOLIDAY RATE.
W
RATE APPLIES TO THE FIRST 12 OVERTIME HOURS WORKED. ALL OTHER OVERTIME IS PAID AT THE SUNDAY/HOLIDAY RATE. IN THE EVENT IT IS NOT REASONABLY POSSIBLE TO COMPLETE 40 HOURS OF WORK ON AN 8 HOUR DAY, MONDAY THROUGH FRIDAY, THEN THE BALANCE OF THE 40 HOURS, UP TO 8 HOURS, MAY BE WORKED ON SATURDAY AT THE STRAIGHT-TIME RATE.
X
EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFFOLD SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.
Y
INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.
Z
INCLUDED IN BASIC HOURLY RATE.
AA
RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
AB
INCLUDES AN AMOUNT FOR DUES CHECK-OFF, WAGE EQUALITY DUES, ORGANIZING DUES, BENEFICIAL AND HOLIDAY.
AC
DESIGNATED DAYS OFF SHALL BE PAID AT THE SATURDAY OVERTIME RATE; PLEASE REFER TO THE HOLIDAY PROVISIONS FOR A LIST OF DESIGNATED DAYS OFF.
AD
INCLUDES AMOUNTS FOR VACATION AND DUES CHECK OFF
AE
PLEASE NOTE THAT THE TAPER CLEAN-UP APPLIES ONLY TO THE TAPER CLASSIFICATION.
AF
INCLUDES AN AMOUNT FOR DUES CHECK OFF
AG
INCLUDES AN AMOUNT WITHHELD FOR DUES CHECK OFF WHICH IS NOT FACTORED INTO OVERTIME AND HOLIDAY WAGE RATES. EMPLOYEES OPERATING AND WORKING BEHIND PLASTER GUNS SHALL RECEIVE AN ADDITIONAL $5.00 PER DAY.
AH
RATE APPLIES TO THE FIRST 8 HOURS WORKED; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AI
AMOUNT IS FOR VALLEY MORTAR TRADES FUND ($1.00) AND INDUSTRY STABILIZATION FUND ($0.03)
AJ
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AK
PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AL
AMOUNT IS FOR EDUCATION REIMBURSEMENT
AM
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND FIRST 10 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
AN
THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE.
AO
THERE SHALL BE NO MORE THAN THREE TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON EACH JOBSITE.
AP
THERE SHALL BE NO MORE THAN FOUR TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON EACH JOBSITE. MAINTENANCE WORK, BOTH DURING AND AFTER THE PLANT ESTABLISHMENT PERIOD, MAY BE PERFORMED BY LANDSCAPE TRADESMEN WITHOUT THE SUPERVISION OF A JOURNEYMAN PIPEFITTER.
AQ
INCLUDES AN AMOUNT FOR SUPPLEMENTAL PENSION FUND.
AR
INCLUDES SMOHIT AND SHC. EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AS
INCLUDES AN AMOUNT FOR PENSION WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AT
INCLUDES SHC. EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AU
RATE APPLIES TO FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY DURING THE EMPLOYEES NORMAL WORKING HOURS. ALL OTHER OVERTIME HOURS SHALL BE PAID AT THE SUNDAY AND HOLIDAY DOUBLE TIME RATE.
AV
INCLUDES AN AMOUNT FOR PENSION FACTORED AT THE OVERTIME MULTIPLIER RATE.
AW
INCLUDES $0.04 FOR SCHOLAR FUND.
AX
THE RATIO OF TERRAZZO FINISHER HOURS TO TERRAZZO WORKER HOURS SHALL NOT EXCEED TWO (2) TO ONE (1).
AY
INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
AZ
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF, WHICH IS FACTORED IN THE OVERTIME RATES. ANY EMPLOYEE WORKING UNDERGROUND SHALL RECEIVE $1.00 PER HOUR IN ADDITION TO REGULAR WAGES.
BA
RATE APPLIES TO FIRST TWO YEARS OF EMPLOYMENT ONLY; $1.35 AFTER 2 YEARS; $1.45 AFTER 5 YEARS; $1.60 AFTER 10 YEARS
BB
COMPUTATION IS BASED ON THE LOWEST VACATION AMOUNT. THESE RATES SHOULD BE INCREASED BY ANY ADDITIONAL VACATION/HOLIDAY PAY THAT IS REQUIRED.
BC
RATE APPLIES TO FIRST TWO YEARS OF EMPLOYMENT ONLY; $1.27 AFTER 2 YEARS; $1.37 AFTER 5 YEARS; $1.52 AFTER 10 YEARS.
BD
RATE APPLIES TO FIRST TWO YEARS OF EMPLOYMENT ONLY; $1.08 AFTER 2 YEARS; $1.18 AFTER 5 YEARS; $1.33 AFTER 10 YEARS.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH THE DIRECTOR OF INDUSTRIAL RELATIONS. IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE. YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

TRAVEL AND/OR SUBSISTENCE: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH WORKER TO EXECUTE THE WORK. YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

Return to main page