GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: ALPINE COUNTY

DETERMINATION: ALP-2017-2

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE BASIC HOURLY RATE BASIC HOURLY RATE FOOTNOTE HEALTH AND WELFARE HEALTH AND WELFARE FOOTNOTE PENSION PENSION FOOTNOTE VACATION/ HOLIDAY VACATION/ HOLIDAY FOOTNOTE TRAINING TRAINING FOOTNOTE OTHER PAYMENTS OTHER PAYMENTS FOOTNOTE HOURS HOURS FOOTNOTE TOTAL HOURLY RATE DAILY OVERTIME HOURLY RATE DAILY OVERTIME HOURLY RATE FOOTNOTE SATURDAY OVERTIME HOURLY RATE SATURDAY OVERTIME HOURLY RATE FOOTNOTE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE FOOTNOTE HOLIDAY PROVISIONS SCOPE OF WORK PROVISIONS TRAVEL & SUBSISTENCE PROVISIONS
#BRICKLAYER, BLOCKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON 08/22/2017 04/30/2018** $37.140 A $9.850 $9.200 $2.500 B $0.800 $1.240 C 8 D $60.730 $80.550 E $80.550 E $100.370 HolidaysScope of WorkTravel & Subsistence
BRICKLAYER, BLOCKLAYER: POINTER, CLEANER, CAULKER, WATERPROOFER 08/22/2017 06/30/2018* $41.040 A $9.850 $10.000 $0.000 F $1.430 $0.430 8 D $62.750 $83.270 $83.270 G $103.790 HolidaysScope of WorkTravel & Subsistence
#BRICK TENDER 08/22/2017 06/30/2018** $33.270 H $8.000 $10.680 $0.000 F $0.450 $0.300 8 D $52.700 $69.330 E $69.330 E $85.970 HolidaysScope of WorkTravel & Subsistence
#CARPET, LINOLEUM, RESILIENT TILE LAYER 02/22/2017 12/31/2017** $33.880 A $10.150 $9.640 $0.000 I $0.600 $0.110 8 $54.380 $71.320 J $71.320 J $88.260 K HolidaysScope of WorkTravel & Subsistence
#ELECTRICIAN: COMM & SYSTEM INSTALLER 02/22/2017 11/30/2017* $28.350 $10.300 $2.950 L $0.000 $1.100 $0.110 M 8 $43.800 $58.470 $58.470 $73.140 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: COMM & SYSTEM TECH. 02/22/2017 11/30/2017* $32.600 $10.300 $2.950 L $0.000 $1.100 $0.110 M 8 $48.200 $65.070 $65.070 $81.940 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: INSIDE WIREMAN 08/22/2017 01/31/2018** $40.060 $11.630 $5.000 L $0.000 F $1.240 $7.970 N 8 $67.740 $88.690 $88.690 $109.640 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: CABLE SPLICER 08/22/2017 01/31/2018** $44.070 $11.630 $5.000 L $0.000 F $1.240 $7.970 N 8 $71.940 $94.990 $94.990 $118.040 HolidaysScope of WorkTravel & Subsistence
#FIELD SURVEYOR: CHIEF OF PARTY (018.167-010) O 02/22/1996 08/31/1996* $15.750 & $1.150 $1.250 $1.520 $0.000 $0.000 8 $19.670 $27.550 $27.550 $35.420 HolidaysScope of WorkTravel & Subsistence
FIELD SURVEYOR: INSTRUMENTMAN (018.167-034) O 02/22/1996 08/31/1996* $14.620 & $1.150 $1.250 $1.490 $0.000 $0.000 8 $18.510 $25.820 $25.820 $33.130 HolidaysScope of WorkTravel & Subsistence
FIELD SURVEYOR: CHAINMAN/RODMAN (869.567-010) O 02/22/1996 08/31/1996* $13.500 & $1.150 $1.250 $1.460 $0.000 $0.000 8 $17.360 $24.110 $24.110 $30.860 HolidaysScope of WorkTravel & Subsistence
#GLAZIER 02/22/2017 12/31/2017** $34.520 A $10.150 $15.810 P $0.000 $0.590 $0.380 Q 8 $61.450 $78.710 R $95.970 $95.970 HolidaysScope of WorkTravel & Subsistence
#MARBLE FINISHER S 02/22/2017 07/31/2017** $31.170 T $9.850 $4.230 $0.000 I $0.450 $0.590 8 $46.290 $61.880 U $77.460 $77.460 HolidaysScope of WorkTravel & Subsistence
#MARBLE MASON S 02/22/2017 07/31/2017** $41.770 T $9.850 $15.420 $0.000 I $0.800 $0.820 8 $68.660 $89.540 U $110.430 $110.430 HolidaysScope of WorkTravel & Subsistence
#PAINTER: BRUSH, SPRAY, PAPERHANGER 08/22/2017 12/31/2017** $32.110 V $10.150 $7.680 $0.000 I $0.430 $0.360 8 D $50.730 $66.790 $66.790 W $82.840 HolidaysScope of WorkTravel & Subsistence
PAINTER: SANDBLASTER, STEAM CLEANER, WATERBLASTER 08/22/2017 12/31/2017** $32.610 V $10.150 $7.680 $0.000 I $0.430 $0.360 8 D $51.230 $67.540 $67.540 W $83.840 HolidaysScope of WorkTravel & Subsistence
PAINTER: EXOTIC MATERIALS 08/22/2017 12/31/2017** $33.110 V $10.150 $7.680 $0.000 I $0.430 $0.360 8 D $51.730 $68.290 $68.290 W $84.840 HolidaysScope of WorkTravel & Subsistence
PAINTER: TAPER 02/22/2017 12/31/2017** $39.980 X $10.150 $13.580 $0.000 I $0.560 $0.510 8 $64.780 $84.770 $84.770 D $104.760 W HolidaysScope of WorkTravel & Subsistence
PAINTER: TAPER CLEAN-UP Y 02/22/2017 12/31/2017* $15.960 Z $10.150 $0.000 $0.000 $0.000 $0.000 8 $26.110 $34.090 $34.090 D $42.070 W HolidaysScope of WorkTravel & Subsistence
#PLASTERER 08/22/2017 12/31/2017** $32.920 AA $13.280 $11.300 $3.000 $1.150 $1.200 8 $62.850 $78.360 $78.360 AB $93.870 HolidaysScope of WorkTravel & Subsistence
#PLASTER TENDER 08/22/2017 06/30/2018** $31.020 $8.000 $11.350 $2.630 $0.450 $1.030 AC 8 $54.480 $69.990 J $69.990 J $85.500 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: PLUMBER, STEAMFITTER, REFRIGERATION FITTER (HVAC) AD 08/22/2017 12/31/2017** $40.750 $12.280 $15.310 $0.000 F $1.050 $2.420 8 $71.810 $92.180 E $92.180 E $112.560 HolidaysScope of WorkTravel & Subsistence
PLUMBER: PIPE TRADESMAN AD 08/22/2017 12/31/2017* $13.000 $9.950 $1.000 $0.000 F $0.000 $0.710 8 $24.660 $31.160 E $31.160 E $37.660 HolidaysScope of WorkTravel & Subsistence
PLUMBER: PLUMBER, PIPEFITTER AE 08/22/2016 07/31/2017* $36.840 $6.670 $6.340 AF $0.000 F $0.800 $0.100 AG 8 D $50.750 $69.170 E $69.170 E $87.590 HolidaysScope of WorkTravel & Subsistence
PLUMBER: PLUMBER, PIPEFITTER HELPER AE 08/22/2016 07/31/2017* $13.530 $6.470 $0.000 AF $0.000 F $0.600 $0.000 8 D $20.600 $27.360 E $27.360 E $34.130 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LIGHT COMMERCIAL PLUMBER AE 08/22/2016 07/31/2017* $29.640 $6.670 $6.340 AF $0.000 F $0.800 $0.100 AG 8 $43.550 $58.370 $58.370 $73.190 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LIGHT COMMERCIAL PLUMBER - HELPER AE 08/22/2016 07/31/2017* $13.530 $6.470 $0.000 AF $0.000 F $0.600 $0.000 8 D $20.600 $27.360 E $27.360 E $34.130 HolidaysScope of WorkTravel & Subsistence
PLUMBER: UNDERGROUND UTILITY PIPEFITTER 08/22/2017 06/30/2018** $26.850 $9.600 $3.000 AF $2.000 $0.450 $0.600 8 $42.500 $55.930 $55.930 D $69.350 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE PIPEFITTER 08/22/2017 06/30/2018** $26.850 $9.600 $3.000 AF $2.000 $0.450 $0.600 8 $42.500 $55.930 $55.930 D $69.350 HolidaysScope of WorkTravel & Subsistence
PLUMBER: UNDERGROUND UTILITY ASSISTANT JOURNEYMAN AH 08/22/2017 06/30/2018** $15.850 $9.600 $3.000 AF $2.000 $0.450 $0.600 8 $31.500 $39.430 $39.430 D $47.350 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE ASSISTANT JOURNEYMAN AH 08/22/2017 06/30/2018** $15.850 $9.600 $3.000 AF $2.000 $0.450 $0.600 8 $31.500 $39.430 $39.430 D $47.350 HolidaysScope of WorkTravel & Subsistence
PLUMBER: UNDERGROUND UTILITY TRADESMAN AI 08/22/2017 06/30/2018** $12.650 $9.600 $3.000 AF $2.000 $0.450 $0.600 8 $28.300 $34.630 $34.630 D $40.950 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE TRADESMAN I AJ 08/22/2017 06/30/2018** $12.650 $9.600 $0.000 AF $2.000 $0.450 $0.600 8 $25.300 $31.630 $31.630 D $37.950 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE TRADESMAN II AJ 08/22/2017 06/30/2018** $12.650 $9.600 $3.000 AF $2.000 $0.450 $0.600 8 $28.300 $34.630 $34.630 D $40.950 HolidaysScope of WorkTravel & Subsistence
PLUMBER: FIRE SPRINKLER FITTER (PROTECTION AND CONTROL SYSTEMS, OVERHEAD AND UNDERGROUND) 08/22/2017 12/31/2017** $39.070 $9.170 $11.350 AK $0.000 $0.470 $0.250 8 $60.310 $79.850 $79.850 $99.380 HolidaysScope of WorkTravel & Subsistence
#ROOFER 08/22/2017 07/31/2018** $31.410 $9.700 $6.650 $4.560 $0.480 $0.000 8 AL $52.800 $68.500 J $68.500 J $84.210 HolidaysScope of WorkTravel & Subsistence
ROOFER BITUMASTIC, ENAMELER, COAL TAR, PITCH AND MASTIC WORKER 08/22/2017 07/31/2018** $34.310 $9.700 $6.650 $4.560 $0.480 $0.000 8 AL $55.700 $72.860 J $72.860 J $90.010 HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER 08/22/2017 06/30/2018* $39.740 A $13.900 $18.640 AM $0.000 F $1.140 AN $0.800 AO 8 $74.220 $95.090 AP $95.090 AP $115.960 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER METAL DECK & SIDING 08/22/2016 06/30/2017* $35.640 H $13.980 AF $19.200 AQ $0.000 F $0.310 AR $0.000 8 $69.130 $87.950 AP $87.950 AP $106.770 HolidaysScope of WorkTravel & Subsistence
#TERRAZZO FINISHER AS 08/22/2017 06/30/2018** $35.140 AT $9.850 $5.700 $0.000 F $0.800 $0.850 8 $52.340 $67.730 AP $67.730 AP $83.120 HolidaysScope of WorkTravel & Subsistence
#TERRAZZO WORKER AS 08/22/2017 06/30/2018** $44.110 AT $9.850 $15.000 $0.000 F $0.800 $1.040 8 $70.800 $90.000 AP $90.000 AP $109.200 HolidaysScope of WorkTravel & Subsistence
#TILE FINISHER 08/22/2017 09/30/2017** $23.980 AU $8.980 $4.800 $0.700 $0.760 $1.530 8 $40.750 $52.740 $52.740 D $64.730 HolidaysScope of WorkTravel & Subsistence
TILE FINISHER RED CIRCLED FINISHER 08/22/2017 09/30/2017** $28.660 AU $8.980 $5.100 $1.300 $0.760 $1.520 8 $46.320 $60.650 $60.650 D $74.980 HolidaysScope of WorkTravel & Subsistence
#TILE SETTER 08/22/2017 09/30/2017** $37.710 AU $8.980 $6.150 $2.350 $1.070 $2.180 8 $58.440 $77.290 $77.290 D $96.150 HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER 08/22/2014 09/30/2014* $12.350 $2.150 $1.000 $0.480 $0.000 $0.000 8 $15.980 $22.160 AV $22.160 AV $22.160 AV HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER PUMP INSTALLER 08/22/2014 09/30/2014* $12.350 $2.150 $1.000 $0.480 $0.000 $0.000 8 $15.980 $22.160 AV $22.160 AV $22.160 AV HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER HELPER 02/22/2017 03/31/2017* $10.500 $2.150 $1.000 $0.430 $0.000 $0.000 8 $14.080 $19.330 AV $19.330 AV $19.330 AV HolidaysScope of WorkTravel & Subsistence

Go to increase page

FOOTNOTES

*
EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
#
INDICATES AN APPRENTICEABLE CRAFT. THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @ HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.
&
THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.
A
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
B
VACATION IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER
C
INCLUDES AMOUNT FOR INDUSTRY PROMOTION FUND, INTERNATIONAL MASONRY INSTITUTE, LABOR MANAGEMENT COOPERATION COMMITTEE, AND VACATION TRUST FUND.
D
SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
E
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
F
INCLUDED IN STRAIGHT-TIME HOURLY RATE.
G
RATE APPLIES TO THE FIRST 10 HOURS WORKED ON SATURDAY. ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
H
INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
I
INCLUDED IN BASIC HOURLY RATE.
J
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
K
DESIGNATED DAYS OFF SHALL BE PAID AT TIME AND ONE-HALF (1 1/2X). PLEASE REFER TO THE HOLIDAY PROVISION FOR A LIST OF DESIGNATED DAYS OFF.
L
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD.
M
IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE ADMINISTRATIVE MAINTENANCE FUND.
N
IN ADDITION, AN AMOUNT EQUAL TO 1.6% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE CONTRACT ADMINISTRATION FUND.
O
DICTIONARY OF OCCUPATIONAL TITLES, FOURTH EDITION, 1977, U.S. DEPARTMENT OF LABOR.
P
INCLUDES AN AMOUNT FOR THE INDIVIDUAL ACCOUNT RETIRMENT PLAN
Q
INCLUDES AMOUNTS FOR INDUSTRY FUND, WORK PRESERVATION FUND, AND LABOR MANAGEMENT COOPERATION INITIATIVE
R
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND FIRST 8 HOURS WORKED ON DESIGNATED DAYS OFF; ALL OTHER TIME IS PAID AT THE SATURDAY, SUNDAY AND HOLIDAY OVERTIME RATE.
S
EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFFOLD SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.
T
INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.
U
RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
V
INCLUDES AN AMOUNT FOR DUES CHECK-OFF, WAGE EQUALITY DUES, ORGANIZING DUES, BENEFICIAL AND HOLIDAY.
W
DESIGNATED DAYS OFF SHALL BE PAID AT THE SATURDAY OVERTIME RATE; PLEASE REFER TO THE HOLIDAY PROVISIONS FOR A LIST OF DESIGNATED DAYS OFF.
X
INCLUDES AMOUNTS FOR VACATION AND DUES CHECK OFF
Y
PLEASE NOTE THAT THE TAPER CLEAN-UP APPLIES ONLY TO THE TAPER CLASSIFICATION.
Z
INCLUDES AN AMOUNT FOR DUES CHECK OFF
AA
INCLUDES AN AMOUNT WITHHELD FOR DUES CHECK OFF WHICH IS NOT FACTORED INTO OVERTIME AND HOLIDAY WAGE RATES. EMPLOYEES OPERATING AND WORKING BEHIND PLASTER GUNS SHALL RECEIVE AN ADDITIONAL $5.00 PER DAY.
AB
RATE APPLIES TO THE FIRST 8 HOURS WORKED; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AC
AMOUNT IS FOR VALLEY MORTAR TRADES FUND ($1.00) AND INDUSTRY STABILIZATION FUND ($0.03)
AD
PORTION OF COUNTY LYING OUTSIDE THE TAHOE BASIN WATERSHED.
AE
PORTION OF COUNTY LYING IN THE TAHOE BASIN AREA.
AF
PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AG
AMOUNT IS FOR CONTRACT ADMINISTRATION
AH
THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE.
AI
THERE SHALL BE NO MORE THAN THREE TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON EACH JOBSITE.
AJ
THERE SHALL BE NO MORE THAN FOUR TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON EACH JOBSITE. MAINTENANCE WORK, BOTH DURING AND AFTER THE PLANT ESTABLISHMENT PERIOD, MAY BE PERFORMED BY LANDSCAPE TRADESMEN WITHOUT THE SUPERVISION OF A JOURNEYMAN PIPEFITTER.
AK
INCLUDES AN AMOUNT FOR SUPPLEMENTAL PENSION FUND.
AL
SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT TIME RATES IN THE EVENT THAT ADVERSE WEATHER CONDITIONS ON ONE OR MORE DAYS DURING THE REGULAR WORK WEEK PREVENT EMPLOYEES FROM WORKING.
AM
INCLUDES AN AMOUNT FOR PENSION WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AN
INCLUDES $0.05 FOR SCHOLAR FUND.
AO
INCLUDES AMOUNTS FOR INDUSTRY FUND AND LABOR MANAGEMENT.
AP
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AQ
INCLUDES AN AMOUNT FOR PENSION FACTORED AT THE OVERTIME MULTIPLIER RATE.
AR
INCLUDES $0.04 FOR SCHOLAR FUND.
AS
THE RATIO OF TERRAZZO FINISHER HOURS TO TERRAZZO WORKER HOURS SHALL NOT EXCEED TWO (2) TO ONE (1).
AT
INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
AU
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF, WHICH IS FACTORED IN THE OVERTIME RATES. ANY EMPLOYEE WORKING UNDERGROUND SHALL RECEIVE $1.00 PER HOUR IN ADDITION TO REGULAR WAGES.
AV
RATE APPLIES TO ALL TIME WORKED IN EXCESS OF 8 HOURS PER DAY OR 40 HOURS PER WEEK. DOUBLE-TIME IS PAID FOR WORK ON RECOGNIZED HOLIDAYS.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH THE DIRECTOR OF INDUSTRIAL RELATIONS. IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE. YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

TRAVEL AND/OR SUBSISTENCE: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH WORKER TO EXECUTE THE WORK. YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

Return to main page