GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: HUMBOLDT COUNTY

DETERMINATION: HUM-2018-1

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE BASIC HOURLY RATE BASIC HOURLY RATE FOOTNOTE HEALTH AND WELFARE HEALTH AND WELFARE FOOTNOTE PENSION PENSION FOOTNOTE VACATION/ HOLIDAY VACATION/ HOLIDAY FOOTNOTE TRAINING TRAINING FOOTNOTE OTHER PAYMENTS OTHER PAYMENTS FOOTNOTE HOURS HOURS FOOTNOTE TOTAL HOURLY RATE DAILY OVERTIME HOURLY RATE DAILY OVERTIME HOURLY RATE FOOTNOTE SATURDAY OVERTIME HOURLY RATE SATURDAY OVERTIME HOURLY RATE FOOTNOTE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE FOOTNOTE HOLIDAY PROVISIONS SCOPE OF WORK PROVISIONS TRAVEL & SUBSISTENCE PROVISIONS
#BRICKLAYER, BLOCKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON 08/22/2017 04/30/2018** $39.320 A $9.850 $14.190 $3.000 B $0.800 $1.320 C 8 D $68.480 $89.640 E $89.640 E $110.800 HolidaysScope of WorkTravel & Subsistence
BRICKLAYER, BLOCKLAYER: POINTER, CLEANER, CAULKER, WATERPROOFER 08/22/2017 06/30/2018* $46.210 A $9.850 $11.500 $0.000 F $1.490 $0.430 8 D $69.480 $92.590 $92.590 G $115.690 HolidaysScope of WorkTravel & Subsistence
#BRICK TENDER 08/22/2017 06/30/2018** $33.520 H $8.000 $10.680 $0.000 F $0.450 $0.300 8 D $52.950 $69.710 E $69.710 E $86.470 HolidaysScope of WorkTravel & Subsistence
#CARPET, LINOLEUM, RESILIENT TILE LAYER 08/22/2017 06/30/2018** $29.530 A $6.350 I $3.700 $2.260 J $0.250 $0.160 8 $42.250 $58.150 K $58.150 K $74.040 HolidaysScope of WorkTravel & Subsistence
#ELECTRICIAN: COMM & SYSTEM INSTALLER 02/22/2018 11/30/2018** $32.530 $10.550 $5.900 L $0.000 $1.100 $0.260 M 8 $51.480 $68.310 N $68.310 N $85.140 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: COMM & SYSTEM TECH. 02/22/2018 11/30/2018** $37.410 $10.550 $5.900 L $0.000 $1.100 $0.260 M 8 $56.530 $75.890 N $75.890 N $95.250 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: INSIDE WIREMAN 08/22/2017 05/31/2018** $47.400 A $12.000 $7.000 O $0.000 $1.180 $0.310 P 8 $69.550 $94.080 Q $94.080 Q $118.610 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: CABLE SPLICER 08/22/2017 05/31/2018** $52.140 A $12.000 $7.000 O $0.000 $1.180 $0.310 P 8 $74.450 $101.440 Q $101.440 Q $128.420 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: TUNNEL WIREMAN 08/22/2017 05/31/2018** $47.900 A $12.000 $7.000 O $0.000 $1.180 $0.310 P 8 $70.070 $94.860 R $119.640 $119.640 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: TUNNEL CABLE SPLICER 08/22/2017 05/31/2018** $52.640 A $12.000 $7.000 O $0.000 $1.180 $0.310 P 8 $74.970 $102.210 R $129.450 $129.450 HolidaysScope of WorkTravel & Subsistence
#FIELD SURVEYOR: CHIEF OF PARTY S 02/22/2018 02/28/2019** $42.190 $13.880 $11.510 T $4.270 U $1.020 $0.210 8 $73.080 $94.170 V $94.170 W $115.270 HolidaysScope of WorkTravel & Subsistence
FIELD SURVEYOR: INSTRUMENTMAN S 02/22/2018 02/28/2019** $39.100 $13.880 $11.510 T $4.270 U $1.020 $0.210 8 $69.990 $89.540 V $89.540 W $109.090 HolidaysScope of WorkTravel & Subsistence
FIELD SURVEYOR: CHAINMAN/RODMAN S 02/22/2018 02/28/2019** $36.220 $13.880 $11.510 T $4.270 U $1.020 $0.210 8 $67.110 $85.220 V $85.220 W $103.330 HolidaysScope of WorkTravel & Subsistence
GLAZIER 02/22/2018 03/31/2018* $11.000 & $0.000 $0.000 $0.190 $0.000 $0.000 8 $11.190 $16.690 $16.690 $16.690 HolidaysScope of WorkTravel & Subsistence
#MARBLE FINISHER X 02/22/2018 07/31/2018** $32.600 Y $9.850 $4.530 $0.000 Z $0.450 $0.710 8 $48.140 $64.440 AA $80.740 $80.740 HolidaysScope of WorkTravel & Subsistence
#MARBLE MASON X 02/22/2018 07/31/2018** $44.600 Y $9.850 $15.450 $0.000 Z $0.800 $0.960 8 $71.660 $93.960 AA $116.260 $116.260 HolidaysScope of WorkTravel & Subsistence
#PAINTER: BRUSH, SPRAY, PAPERHANGER 02/22/2018 12/31/2018** $32.860 AB $10.150 $8.680 $0.000 Z $0.430 $0.360 8 D $52.480 $68.910 $68.910 AC $85.340 HolidaysScope of WorkTravel & Subsistence
PAINTER: SANDBLASTER, STEAM CLEANER, WATERBLASTER 02/22/2018 12/31/2018** $33.360 AB $10.150 $8.680 $0.000 Z $0.430 $0.360 8 D $52.980 $69.660 $69.660 AC $86.340 HolidaysScope of WorkTravel & Subsistence
PAINTER: EXOTIC MATERIALS 02/22/2018 12/31/2018** $33.860 AB $10.150 $8.680 $0.000 Z $0.430 $0.360 8 D $53.480 $70.410 $70.410 AC $87.340 HolidaysScope of WorkTravel & Subsistence
PAINTER: TAPER 02/22/2018 06/30/2018* $40.980 AD $10.150 $14.630 $0.000 Z $0.560 $0.520 8 $66.840 $87.330 $87.330 D $107.820 AC HolidaysScope of WorkTravel & Subsistence
PAINTER: TAPER CLEAN-UP AE 02/22/2018 06/30/2018* $16.360 AF $10.150 $0.000 $0.000 $0.000 $0.000 8 $26.510 $34.690 $34.690 D $42.870 AC HolidaysScope of WorkTravel & Subsistence
#PLASTERER 02/22/2018 06/30/2018** $32.920 AG $13.280 $11.780 $3.500 $1.150 $1.200 8 $63.830 $79.340 $79.340 AH $94.850 HolidaysScope of WorkTravel & Subsistence
#PLASTER TENDER 08/22/2017 06/30/2018** $31.020 $8.000 $11.350 $2.630 $0.450 $1.030 AI 8 $54.480 $69.990 AJ $69.990 AJ $85.500 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: PLUMBER, PIPEFITTER 02/22/2018 03/31/2018** $43.820 A $14.110 $12.490 AK $0.000 F $1.450 $0.260 8 $72.130 $94.040 AL $94.040 AL $115.950 HolidaysScope of WorkTravel & Subsistence
PLUMBER: UNDERGROUND UTILITY PIPEFITTER 08/22/2017 06/30/2018** $26.850 $9.600 $3.000 AK $2.000 $0.450 $0.600 8 $42.500 $55.930 $55.930 D $69.350 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE PIPEFITTER 08/22/2017 06/30/2018** $26.850 $9.600 $3.000 AK $2.000 $0.450 $0.600 8 $42.500 $55.930 $55.930 D $69.350 HolidaysScope of WorkTravel & Subsistence
PLUMBER: UNDERGROUND UTILITY ASSISTANT JOURNEYMAN AM 08/22/2017 06/30/2018** $15.850 $9.600 $3.000 AK $2.000 $0.450 $0.600 8 $31.500 $39.430 $39.430 D $47.350 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE ASSISTANT JOURNEYMAN AM 08/22/2017 06/30/2018** $15.850 $9.600 $3.000 AK $2.000 $0.450 $0.600 8 $31.500 $39.430 $39.430 D $47.350 HolidaysScope of WorkTravel & Subsistence
PLUMBER: UNDERGROUND UTILITY TRADESMAN AN 08/22/2017 06/30/2018** $12.650 $9.600 $3.000 AK $2.000 $0.450 $0.600 8 $28.300 $34.630 $34.630 D $40.950 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE TRADESMAN I AO 08/22/2017 06/30/2018** $12.650 $9.600 $0.000 AK $2.000 $0.450 $0.600 8 $25.300 $31.630 $31.630 D $37.950 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE TRADESMAN II AO 08/22/2017 06/30/2018** $12.650 $9.600 $3.000 AK $2.000 $0.450 $0.600 8 $28.300 $34.630 $34.630 D $40.950 HolidaysScope of WorkTravel & Subsistence
PLUMBER: FIRE SPRINKLER FITTER (PROTECTION AND CONTROL SYSTEMS, OVERHEAD AND UNDERGROUND) 02/22/2017 03/31/2018** $39.070 $9.670 $11.550 AP $0.000 $0.470 $0.250 8 $61.010 $80.540 $80.540 $100.080 HolidaysScope of WorkTravel & Subsistence
ROOFER 02/22/2018 03/31/2018* $11.000 & $0.000 $0.000 $0.000 $2.000 $0.000 8 $13.000 $18.500 $18.500 $18.500 HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER 08/22/2017 07/01/2018* $57.090 H $14.200 AQ $27.960 AR $0.000 F $1.430 $0.710 8 $101.390 $133.110 Q $133.110 Q $164.820 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER TOTAL SHEET METAL CONTRACT OF $200000 OR LESS 08/22/2017 07/01/2018* $50.290 H $14.200 AQ $26.580 AR $0.000 F $1.430 $0.710 8 $93.210 $121.150 Q $121.150 Q $149.090 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER SERVICE MECHANIC (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2017 07/01/2018* $39.400 H $13.600 AS $15.080 AR $0.000 F $1.330 $0.710 8 $70.120 $91.070 AT $91.070 AT $112.020 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER SERVICE TECHNICIAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2017 07/01/2018* $35.500 H $13.600 AS $9.810 AR $0.000 F $1.330 $0.710 8 $60.950 $79.500 AT $79.500 AT $98.050 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER AIR CONDITIONING SPECIALIST (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2017 07/01/2018* $31.440 H $13.600 AS $4.630 AR $0.000 F $1.310 $0.710 8 $51.690 $67.910 Q $67.910 Q $84.130 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER AIR CONDITIONING JOURNEYMAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2017 07/01/2018* $36.740 H $13.600 AQ $10.090 AR $0.000 F $1.310 $0.710 8 $62.450 $81.570 Q $81.570 Q $100.690 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER METAL DECK & SIDING 08/22/2016 06/30/2017* $35.640 H $13.980 AK $19.200 AU $0.000 F $0.310 AV $0.000 8 $69.130 $87.950 Q $87.950 Q $106.770 HolidaysScope of WorkTravel & Subsistence
#TERRAZZO FINISHER AW 08/22/2017 06/30/2018** $35.140 AX $9.850 $5.700 $0.000 F $0.800 $0.850 8 $52.340 $67.730 Q $67.730 Q $83.120 HolidaysScope of WorkTravel & Subsistence
#TERRAZZO WORKER AW 08/22/2017 06/30/2018** $44.110 AX $9.850 $15.000 $0.000 F $0.800 $1.040 8 $70.800 $90.000 Q $90.000 Q $109.200 HolidaysScope of WorkTravel & Subsistence
#TILE FINISHER 02/22/2018 03/31/2018** $26.480 AY $8.980 $4.650 $1.000 $0.790 $0.950 8 $42.850 $56.090 $56.090 D $69.330 HolidaysScope of WorkTravel & Subsistence
TILE FINISHER RED CIRCLED FINISHER 02/22/2018 03/31/2018** $32.460 AY $8.980 $5.100 $1.300 $0.790 $1.020 8 $49.650 $65.880 $65.880 D $82.110 HolidaysScope of WorkTravel & Subsistence
#TILE SETTER 02/22/2018 03/31/2018** $43.300 AY $8.980 $6.150 $2.500 $1.120 $1.590 8 $63.640 $85.290 $85.290 D $106.940 HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER DRILLER, PUMP REPAIRMAN 08/22/2007 01/31/2008* $20.170 $8.120 $3.690 $0.800 AZ $0.000 $0.000 8 $32.780 $42.870 BA $42.870 BA $42.870 BA HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER PUMP INSTALLER 08/22/2007 01/31/2008* $17.860 $8.120 $3.690 $0.720 BB $0.000 $0.000 8 $30.390 $39.320 BA $39.320 BA $39.320 BA HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER HELPER 08/22/2007 01/31/2008* $12.470 $8.120 $3.690 $0.530 BC $0.000 $0.000 8 $24.810 $31.040 BA $31.040 BA $31.040 BA HolidaysScope of WorkTravel & Subsistence

Go to increase page

FOOTNOTES

*
EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
#
INDICATES AN APPRENTICEABLE CRAFT. THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @ HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.
&
THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.
A
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
B
VACATION IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER
C
INCLUDES AMOUNT FOR INDUSTRY PROMOTION FUND, INTERNATIONAL MASONRY INSTITUTE, LABOR MANAGEMENT COOPERATION COMMITTEE, AND VACATION TRUST FUND.
D
SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
E
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
F
INCLUDED IN STRAIGHT-TIME HOURLY RATE.
G
RATE APPLIES TO THE FIRST 10 HOURS WORKED ON SATURDAY. ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
H
INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
I
THE HEALTH & WELFARE CONTRIBUTION IS REQUIRED FOR EACH HOUR WORKED UP TO A MAXIMUM OF 40 HOURS IN ANY ONE WEEK. THIS COULD AFFECT EITHER THE TOTAL HOURLY RATE OR THE OVERTIME HOURLY RATES.
J
AMOUNT IS EQUAL TO 8% OF THE HOURLY RATE AND IS FACTORED AT THE APPLICABLE OVERTIME HOURLY RATES.
K
RATE APPLIES TO ALL HOURS WORKED IN EXCESS OF 8 HOURS MONDAY THROUGH FRIDAY AND ALL HOURS WORKED ON SATURDAY.
L
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD.
M
IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES.
N
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
O
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
P
IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE FOR ADMINISTRATIVE MAINTENANCE FUND IS ADDED TO THE TOTAL HOURLY RATE AND IS FACTORED INTO THE OVERTIME HOURLY RATE.
Q
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
R
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS WORKED; ALL OTHER OVERTIME IS PAID AT THE SATURDAY, SUNDAY AND HOLIDAY OVERTIME RATE.
S
ALL CREWS, WITHOUT CONSIDERATION TO THE NUMBER OF INDIVIDUALS IN THE CREW, SHALL INCLUDE A CHIEF OF PARTY. A CREW CONSISTS OF ONE (1) OR MORE EMPLOYEES PERFORMING FIELD AND CONSTRUCTION SURVEY WORK.
T
INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
U
INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.
V
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS, MONDAY THROUGH FRIDAY. ALL OTHER OVERTIME IS PAID AT THE SUNDAY/HOLIDAY RATE.
W
RATE APPLIES TO THE FIRST 12 OVERTIME HOURS WORKED. ALL OTHER OVERTIME IS PAID AT THE SUNDAY/HOLIDAY RATE. IN THE EVENT IT IS NOT REASONABLY POSSIBLE TO COMPLETE 40 HOURS OF WORK ON AN 8 HOUR DAY, MONDAY THROUGH FRIDAY, THEN THE BALANCE OF THE 40 HOURS, UP TO 8 HOURS, MAY BE WORKED ON SATURDAY AT THE STRAIGHT-TIME RATE.
X
EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFFOLD SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.
Y
INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.
Z
INCLUDED IN BASIC HOURLY RATE.
AA
RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
AB
INCLUDES AN AMOUNT FOR DUES CHECK-OFF, WAGE EQUALITY DUES, ORGANIZING DUES, BENEFICIAL AND HOLIDAY.
AC
DESIGNATED DAYS OFF SHALL BE PAID AT THE SATURDAY OVERTIME RATE; PLEASE REFER TO THE HOLIDAY PROVISIONS FOR A LIST OF DESIGNATED DAYS OFF.
AD
INCLUDES AMOUNTS FOR VACATION AND DUES CHECK OFF
AE
PLEASE NOTE THAT THE TAPER CLEAN-UP APPLIES ONLY TO THE TAPER CLASSIFICATION.
AF
INCLUDES AN AMOUNT FOR DUES CHECK OFF
AG
INCLUDES AN AMOUNT WITHHELD FOR DUES CHECK OFF WHICH IS NOT FACTORED INTO OVERTIME AND HOLIDAY WAGE RATES. EMPLOYEES OPERATING AND WORKING BEHIND PLASTER GUNS SHALL RECEIVE AN ADDITIONAL $5.00 PER DAY.
AH
RATE APPLIES TO THE FIRST 8 HOURS WORKED; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AI
AMOUNT IS FOR VALLEY MORTAR TRADES FUND ($1.00) AND INDUSTRY STABILIZATION FUND ($0.03)
AJ
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AK
PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AL
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND FIRST 10 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
AM
THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE.
AN
THERE SHALL BE NO MORE THAN THREE TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON EACH JOBSITE.
AO
THERE SHALL BE NO MORE THAN FOUR TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON EACH JOBSITE. MAINTENANCE WORK, BOTH DURING AND AFTER THE PLANT ESTABLISHMENT PERIOD, MAY BE PERFORMED BY LANDSCAPE TRADESMEN WITHOUT THE SUPERVISION OF A JOURNEYMAN PIPEFITTER.
AP
INCLUDES AN AMOUNT FOR SUPPLEMENTAL PENSION FUND.
AQ
INCLUDES SMOHIT AND SHC. EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AR
INCLUDES AN AMOUNT FOR PENSION WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AS
INCLUDES SHC. EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AT
RATE APPLIES TO FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY DURING THE EMPLOYEES NORMAL WORKING HOURS. ALL OTHER OVERTIME HOURS SHALL BE PAID AT THE SUNDAY AND HOLIDAY DOUBLE TIME RATE.
AU
INCLUDES AN AMOUNT FOR PENSION FACTORED AT THE OVERTIME MULTIPLIER RATE.
AV
INCLUDES $0.04 FOR SCHOLAR FUND.
AW
THE RATIO OF TERRAZZO FINISHER HOURS TO TERRAZZO WORKER HOURS SHALL NOT EXCEED TWO (2) TO ONE (1).
AX
INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
AY
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF, WHICH IS FACTORED IN THE OVERTIME RATES. ANY EMPLOYEE WORKING UNDERGROUND SHALL RECEIVE $1.00 PER HOUR IN ADDITION TO REGULAR WAGES.
AZ
RATE APPLIES TO FIRST TWO YEARS OF EMPLOYMENT ONLY; $1.35 AFTER 2 YEARS; $1.45 AFTER 5 YEARS; $1.60 AFTER 10 YEARS
BA
COMPUTATION IS BASED ON THE LOWEST VACATION AMOUNT. THESE RATES SHOULD BE INCREASED BY ANY ADDITIONAL VACATION/HOLIDAY PAY THAT IS REQUIRED.
BB
RATE APPLIES TO FIRST TWO YEARS OF EMPLOYMENT ONLY; $1.27 AFTER 2 YEARS; $1.37 AFTER 5 YEARS; $1.52 AFTER 10 YEARS.
BC
RATE APPLIES TO FIRST TWO YEARS OF EMPLOYMENT ONLY; $1.08 AFTER 2 YEARS; $1.18 AFTER 5 YEARS; $1.33 AFTER 10 YEARS.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH THE DIRECTOR OF INDUSTRIAL RELATIONS. IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE. YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

TRAVEL AND/OR SUBSISTENCE: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH WORKER TO EXECUTE THE WORK. YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.