GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: LAKE COUNTY

DETERMINATION: LAK-2017-2

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE BASIC HOURLY RATE BASIC HOURLY RATE FOOTNOTE HEALTH AND WELFARE HEALTH AND WELFARE FOOTNOTE PENSION PENSION FOOTNOTE VACATION/ HOLIDAY VACATION/ HOLIDAY FOOTNOTE TRAINING TRAINING FOOTNOTE OTHER PAYMENTS OTHER PAYMENTS FOOTNOTE HOURS HOURS FOOTNOTE TOTAL HOURLY RATE DAILY OVERTIME HOURLY RATE DAILY OVERTIME HOURLY RATE FOOTNOTE SATURDAY OVERTIME HOURLY RATE SATURDAY OVERTIME HOURLY RATE FOOTNOTE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE FOOTNOTE HOLIDAY PROVISIONS SCOPE OF WORK PROVISIONS TRAVEL & SUBSISTENCE PROVISIONS
#BRICKLAYER, BLOCKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON 08/22/2017 04/30/2018** $39.320 A $9.850 $14.190 $3.000 B $0.800 $1.320 C 8 D $68.480 $89.640 E $89.640 E $110.800 HolidaysScope of WorkTravel & Subsistence
BRICKLAYER, BLOCKLAYER: POINTER, CLEANER, CAULKER, WATERPROOFER 08/22/2017 06/30/2018* $46.210 A $9.850 $11.500 $0.000 F $1.490 $0.430 8 D $69.480 $92.590 $92.590 G $115.690 HolidaysScope of WorkTravel & Subsistence
#BRICK TENDER 08/22/2017 06/30/2018** $33.520 H $8.000 $10.680 $0.000 F $0.450 $0.300 8 D $52.950 $69.710 E $69.710 E $86.470 HolidaysScope of WorkTravel & Subsistence
#CARPET, LINOLEUM, SOFT FLOOR LAYER 02/22/2017 12/31/2017** $47.340 A $10.150 $13.860 $0.000 I $0.630 $0.340 8 $72.320 $95.990 J $95.990 J $119.660 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, FLOOR COVERING HANDLER AFTER 3 YEARS 02/22/2017 12/31/2017** $23.650 A $10.150 $6.930 $0.000 I $0.050 $0.340 8 $41.120 $52.940 J $52.940 J $64.770 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, FLOOR COVERING HANDLER TRAINEE, FIRST 3 MONTHS 02/22/2017 12/31/2017** $15.120 A $10.150 $4.430 $0.000 I $0.050 $0.340 8 $30.090 $37.650 J $37.650 J $45.210 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, FLOOR COVERING HANDLER TRAINEE, SECOND 3 MONTHS 02/22/2017 12/31/2017** $17.010 A $10.150 $4.990 $0.000 I $0.050 $0.340 8 $32.540 $41.040 J $41.040 J $49.550 HolidaysScope of WorkTravel & Subsistence
#ELECTRICIAN: COMM & SYSTEM INSTALLER 02/22/2017 11/30/2017* $30.640 $10.550 $5.900 K $0.000 $1.100 $0.210 L 8 $49.470 $65.320 M $65.320 M $81.180 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: COMM & SYSTEM TECH. 02/22/2017 11/30/2017* $34.890 $10.550 $5.900 K $0.000 $1.100 $0.210 L 8 $53.870 $71.920 M $71.920 M $89.970 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: INSIDE WIREMAN 08/22/2017 05/31/2018** $47.400 A $12.000 $7.000 N $0.000 $1.180 $0.310 O 8 $69.550 $94.080 P $94.080 P $118.610 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: CABLE SPLICER 08/22/2017 05/31/2018** $52.140 A $12.000 $7.000 N $0.000 $1.180 $0.310 O 8 $74.450 $101.440 P $101.440 P $128.420 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: TUNNEL WIREMAN 08/22/2017 05/31/2018** $47.900 A $12.000 $7.000 N $0.000 $1.180 $0.310 O 8 $70.070 $94.860 Q $119.640 $119.640 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: TUNNEL CABLE SPLICER 08/22/2017 05/31/2018** $52.640 A $12.000 $7.000 N $0.000 $1.180 $0.310 O 8 $74.970 $102.210 Q $129.450 $129.450 HolidaysScope of WorkTravel & Subsistence
#FIELD SURVEYOR: CHIEF OF PARTY (018.167-010) 02/22/1996 08/31/1996* $21.880 & $4.200 $4.100 $2.500 $0.000 $0.000 8 $32.680 $43.620 $43.620 $54.560 HolidaysScope of WorkTravel & Subsistence
FIELD SURVEYOR: CHAINMAN/RODMAN (869.567-010) 02/22/1996 08/31/1996* $15.640 & $4.200 $4.100 $2.500 $0.000 $0.000 8 $26.440 $34.260 $34.260 $42.080 HolidaysScope of WorkTravel & Subsistence
GLAZIER 02/22/2017 03/31/2017* $10.500 & $0.000 $0.000 $0.190 $0.000 $0.000 8 $10.690 $15.940 $15.940 $15.940 HolidaysScope of WorkTravel & Subsistence
#MARBLE FINISHER R 02/22/2017 07/31/2017** $31.170 S $9.850 $4.230 $0.000 I $0.450 $0.590 8 $46.290 $61.880 T $77.460 $77.460 HolidaysScope of WorkTravel & Subsistence
#MARBLE MASON R 02/22/2017 07/31/2017** $41.770 S $9.850 $15.420 $0.000 I $0.800 $0.820 8 $68.660 $89.540 T $110.430 $110.430 HolidaysScope of WorkTravel & Subsistence
#PAINTER: BRUSH AND SPRAY 08/22/2017 12/31/2017** $38.820 H $10.150 $12.120 U $0.000 I $0.560 $0.380 8 D $62.030 $81.440 $81.440 V $100.850 HolidaysScope of WorkTravel & Subsistence
PAINTER: INDUSTRIAL PAINTER 08/22/2017 12/31/2017** $39.320 H $10.150 $12.120 U $0.000 I $0.560 $0.380 8 D $62.530 $82.190 $82.190 V $101.850 HolidaysScope of WorkTravel & Subsistence
PAINTER: SANDBLASTER, STEAM CLEANER, WATERBLASTER 08/22/2017 12/31/2017** $39.320 H $10.150 $12.120 U $0.000 I $0.560 $0.380 8 D $62.530 $82.190 $82.190 V $101.850 HolidaysScope of WorkTravel & Subsistence
PAINTER: EXOTIC MATERIALS 08/22/2017 12/31/2017** $39.570 H $10.150 $12.120 U $0.000 I $0.560 $0.380 8 D $62.780 $82.570 $82.570 V $102.350 HolidaysScope of WorkTravel & Subsistence
PAINTER: PAPERHANGER/WALLCOVERING 08/22/2017 12/31/2017** $39.820 H $10.150 $12.120 U $0.000 I $0.560 $0.380 8 D $63.030 $82.940 $82.940 V $102.850 HolidaysScope of WorkTravel & Subsistence
PAINTER: TAPER 02/22/2017 12/31/2017** $39.980 W $10.150 $13.580 $0.000 I $0.560 $0.510 8 $64.780 $84.770 $84.770 D $104.760 V HolidaysScope of WorkTravel & Subsistence
PAINTER: TAPER CLEAN-UP X 02/22/2017 12/31/2017* $15.960 Y $10.150 $0.000 $0.000 $0.000 $0.000 8 $26.110 $34.090 $34.090 D $42.070 V HolidaysScope of WorkTravel & Subsistence
#PLASTERER 08/22/2017 12/31/2017** $32.920 Z $13.280 $11.300 $3.000 $1.150 $1.200 8 $62.850 $78.360 $78.360 AA $93.870 HolidaysScope of WorkTravel & Subsistence
#PLASTER TENDER 08/22/2017 06/30/2018** $31.020 $8.000 $11.350 $2.630 $0.450 $1.030 AB 8 $54.480 $69.990 J $69.990 J $85.500 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: PLUMBER, STEAMFITTER 08/22/2017 06/30/2018** $70.000 AC $16.010 $21.080 $0.000 F $3.650 $3.200 AD 8 $113.940 $148.940 AE $148.940 G $183.940 HolidaysScope of WorkTravel & Subsistence
PLUMBER: PLUMBING SERVICE AND REPAIR, LIGHT COMMERCIAL 08/22/2017 06/30/2018** $59.500 AC $14.870 $18.770 $0.000 F $2.100 $1.230 AD 8 $96.470 $126.220 AE $126.220 G $155.970 HolidaysScope of WorkTravel & Subsistence
PLUMBER: REFRIGERATION FITTER (HVAC) 08/22/2017 06/30/2018** $70.000 AC $16.010 $21.080 $0.000 F $3.650 $3.150 AD 8 $113.890 $148.890 AE $148.890 G $183.890 HolidaysScope of WorkTravel & Subsistence
PLUMBER: AIR CONDITIONING & REFRIGERATION/HVAC - SERVICE WORK 08/22/2017 06/30/2018** $70.000 AC $16.010 $21.080 $0.000 F $3.650 $3.200 AD 8 $113.940 $148.940 AE $148.940 G $183.940 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE/IRRIGATION PIPEFITTER 08/22/2017 06/30/2018** $59.500 A $14.470 $14.740 AF $0.000 F $1.810 $1.040 8 $91.560 $121.310 $121.310 AA $151.060 HolidaysScope of WorkTravel & Subsistence
PLUMBER: UNDERGROUND/UTILITY PIPEFITTER 08/22/2017 06/30/2018** $59.500 A $14.470 $14.740 AF $0.000 F $1.810 $1.040 8 $91.560 $121.310 $121.310 AA $151.060 HolidaysScope of WorkTravel & Subsistence
PLUMBER: FIRE SPRINKLER FITTER (PROTECTION AND CONTROL SYSTEMS, OVERHEAD AND UNDERGROUND) 08/22/2017 12/31/2017** $39.070 $9.170 $11.350 AG $0.000 $0.470 $0.250 8 $60.310 $79.850 $79.850 $99.380 HolidaysScope of WorkTravel & Subsistence
#ROOFER 02/22/1998 03/03/1999* $12.000 & $1.840 $1.200 $0.500 $0.100 $0.000 8 $15.640 $21.640 $21.640 $21.640 HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER 08/22/2017 07/01/2018* $57.090 H $14.200 AH $27.960 AI $0.000 F $1.430 $0.710 8 $101.390 $133.110 P $133.110 P $164.820 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER TOTAL SHEET METAL CONTRACT OF $200000 OR LESS 08/22/2017 07/01/2018* $50.290 H $14.200 AH $26.580 AI $0.000 F $1.430 $0.710 8 $93.210 $121.150 P $121.150 P $149.090 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER SERVICE MECHANIC (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2017 07/01/2018* $39.400 H $13.600 AJ $15.080 AI $0.000 F $1.330 $0.710 8 $70.120 $91.070 AK $91.070 AK $112.020 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER SERVICE TECHNICIAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2017 07/01/2018* $35.500 H $13.600 AJ $9.810 AI $0.000 F $1.330 $0.710 8 $60.950 $79.500 AK $79.500 AK $98.050 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER AIR CONDITIONING SPECIALIST (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2017 07/01/2018* $31.440 H $13.600 AJ $4.630 AI $0.000 F $1.310 $0.710 8 $51.690 $67.910 P $67.910 P $84.130 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER AIR CONDITIONING JOURNEYMAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2017 07/01/2018* $36.740 H $13.600 AH $10.090 AI $0.000 F $1.310 $0.710 8 $62.450 $81.570 P $81.570 P $100.690 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER METAL DECK & SIDING 08/22/2016 06/30/2017* $35.640 H $13.980 AF $19.200 AL $0.000 F $0.310 AM $0.000 8 $69.130 $87.950 P $87.950 P $106.770 HolidaysScope of WorkTravel & Subsistence
#TERRAZZO FINISHER AN 08/22/2017 06/30/2018** $35.140 AO $9.850 $5.700 $0.000 F $0.800 $0.850 8 $52.340 $67.730 P $67.730 P $83.120 HolidaysScope of WorkTravel & Subsistence
#TERRAZZO WORKER AN 08/22/2017 06/30/2018** $44.110 AO $9.850 $15.000 $0.000 F $0.800 $1.040 8 $70.800 $90.000 P $90.000 P $109.200 HolidaysScope of WorkTravel & Subsistence
#TILE FINISHER 08/22/2017 09/30/2017** $24.600 AP $8.980 $4.150 $1.000 $0.760 $1.530 8 $41.020 $53.320 $53.320 D $65.620 HolidaysScope of WorkTravel & Subsistence
TILE FINISHER RED CIRCLED FINISHER 08/22/2017 09/30/2017** $27.920 AP $8.980 $5.100 $1.500 $0.760 $1.510 8 $45.770 $59.730 $59.730 D $73.690 HolidaysScope of WorkTravel & Subsistence
#TILE SETTER 08/22/2017 09/30/2017** $40.170 AP $8.980 $6.150 $2.500 $1.070 $2.210 8 $61.080 $81.160 $81.160 D $101.250 HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER DRILLER, PUMP REPAIRMAN 08/22/2007 01/31/2008* $20.170 $8.120 $3.690 $0.800 AQ $0.000 $0.000 8 $32.780 $42.870 AR $42.870 AR $42.870 AR HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER PUMP INSTALLER 08/22/2007 01/31/2008* $17.860 $8.120 $3.690 $0.720 AS $0.000 $0.000 8 $30.390 $39.320 AR $39.320 AR $39.320 AR HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER HELPER 08/22/2007 01/31/2008* $12.470 $8.120 $3.690 $0.530 AT $0.000 $0.000 8 $24.810 $31.040 AR $31.040 AR $31.040 AR HolidaysScope of WorkTravel & Subsistence

Go to increase page

FOOTNOTES

*
EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
#
INDICATES AN APPRENTICEABLE CRAFT. THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @ HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.
&
THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.
A
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
B
VACATION IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER
C
INCLUDES AMOUNT FOR INDUSTRY PROMOTION FUND, INTERNATIONAL MASONRY INSTITUTE, LABOR MANAGEMENT COOPERATION COMMITTEE, AND VACATION TRUST FUND.
D
SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
E
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
F
INCLUDED IN STRAIGHT-TIME HOURLY RATE.
G
RATE APPLIES TO THE FIRST 10 HOURS WORKED ON SATURDAY. ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
H
INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
I
INCLUDED IN BASIC HOURLY RATE.
J
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
K
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD.
L
IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES.
M
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
N
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
O
IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE FOR ADMINISTRATIVE MAINTENANCE FUND IS ADDED TO THE TOTAL HOURLY RATE AND IS FACTORED INTO THE OVERTIME HOURLY RATE.
P
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
Q
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS WORKED; ALL OTHER OVERTIME IS PAID AT THE SATURDAY, SUNDAY AND HOLIDAY OVERTIME RATE.
R
EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFFOLD SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.
S
INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.
T
RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
U
INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
V
DESIGNATED DAYS OFF SHALL BE PAID AT THE SATURDAY OVERTIME RATE; PLEASE REFER TO THE HOLIDAY PROVISIONS FOR A LIST OF DESIGNATED DAYS OFF.
W
INCLUDES AMOUNTS FOR VACATION AND DUES CHECK OFF
X
PLEASE NOTE THAT THE TAPER CLEAN-UP APPLIES ONLY TO THE TAPER CLASSIFICATION.
Y
INCLUDES AN AMOUNT FOR DUES CHECK OFF
Z
INCLUDES AN AMOUNT WITHHELD FOR DUES CHECK OFF WHICH IS NOT FACTORED INTO OVERTIME AND HOLIDAY WAGE RATES. EMPLOYEES OPERATING AND WORKING BEHIND PLASTER GUNS SHALL RECEIVE AN ADDITIONAL $5.00 PER DAY.
AA
RATE APPLIES TO THE FIRST 8 HOURS WORKED; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AB
AMOUNT IS FOR VALLEY MORTAR TRADES FUND ($1.00) AND INDUSTRY STABILIZATION FUND ($0.03)
AC
INCLUDES AN AMOUNT FOR VACATION/HOLIDAY.
AD
INCLUDES FUNDS FOR SUB/JURY DUTY, CRAFT, CONTRACT ADMINISTRATION/HIRING HALL, JURISDICTIONAL PROTECTION AND SCHOLARSHIP.
AE
RATE APPLIES TO THE FIRST 2 OVERTIME HOURS ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AF
PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AG
INCLUDES AN AMOUNT FOR SUPPLEMENTAL PENSION FUND.
AH
INCLUDES SMOHIT AND SHC. EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AI
INCLUDES AN AMOUNT FOR PENSION WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AJ
INCLUDES SHC. EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AK
RATE APPLIES TO FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY DURING THE EMPLOYEES NORMAL WORKING HOURS. ALL OTHER OVERTIME HOURS SHALL BE PAID AT THE SUNDAY AND HOLIDAY DOUBLE TIME RATE.
AL
INCLUDES AN AMOUNT FOR PENSION FACTORED AT THE OVERTIME MULTIPLIER RATE.
AM
INCLUDES $0.04 FOR SCHOLAR FUND.
AN
THE RATIO OF TERRAZZO FINISHER HOURS TO TERRAZZO WORKER HOURS SHALL NOT EXCEED TWO (2) TO ONE (1).
AO
INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
AP
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF, WHICH IS FACTORED IN THE OVERTIME RATES. ANY EMPLOYEE WORKING UNDERGROUND SHALL RECEIVE $1.00 PER HOUR IN ADDITION TO REGULAR WAGES.
AQ
RATE APPLIES TO FIRST TWO YEARS OF EMPLOYMENT ONLY; $1.35 AFTER 2 YEARS; $1.45 AFTER 5 YEARS; $1.60 AFTER 10 YEARS
AR
COMPUTATION IS BASED ON THE LOWEST VACATION AMOUNT. THESE RATES SHOULD BE INCREASED BY ANY ADDITIONAL VACATION/HOLIDAY PAY THAT IS REQUIRED.
AS
RATE APPLIES TO FIRST TWO YEARS OF EMPLOYMENT ONLY; $1.27 AFTER 2 YEARS; $1.37 AFTER 5 YEARS; $1.52 AFTER 10 YEARS.
AT
RATE APPLIES TO FIRST TWO YEARS OF EMPLOYMENT ONLY; $1.08 AFTER 2 YEARS; $1.18 AFTER 5 YEARS; $1.33 AFTER 10 YEARS.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH THE DIRECTOR OF INDUSTRIAL RELATIONS. IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE. YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

TRAVEL AND/OR SUBSISTENCE: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH WORKER TO EXECUTE THE WORK. YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

Return to main page