Skip to Main Content


This information is provided free of charge by the Department of Industrial Relations from its web site at www.dir.ca.gov. These regulations are for the convenience of the user and no representation or warranty is made that the information is current or accurate. See full disclaimer at https://www.dir.ca.gov/od_pub/disclaimer.html.
 
Subchapter 14. Petroleum Safety Orders--Drilling and Production
Article 31. Handling Heavy Tools at Drilling Wells
Return to index
New query

§6607. Handling Heavy Tools at Drilling Wells.


(a) At drilling wells provisions shall be made for the safe handling of heavy tools between transporting vehicle and the derrick or mast floor or storage platform.

The term "heavy tools" shall mean such tools as bits, reamers, fishing tools, elevators, spiders, and tools for testing formation or casing.

NOTE: Authority cited: Section 142.3, Labor Code. Reference: Section 142.3, Labor Code.

HISTORY

1. New Note filed 5-8-95; operative 6-7-95 (Register 95, No. 19).

Go BackGo Back to Article 31 Table of Contents