GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS
LOCALITY: RIVERSIDE COUNTY
DETERMINATION: RIV-2021-1
PREDETERMINED INCREASES
CRAFT | CLASSIFICATION | CRAFT FOOTNOTE | ISSUE DATE | EXPIRATION DATE | DATE OF NEXT INCREASE 1 | AMOUNT OF INCREASE 1 | INCREASE FOOTNOTE 1 | DATE OF NEXT INCREASE 2 | AMOUNT OF INCREASE 2 | INCREASE FOOTNOTE 2 | DATE OF NEXT INCREASE 3 | AMOUNT OF INCREASE 3 | INCREASE FOOTNOTE 3 | DATE OF NEXT INCREASE 4 | AMOUNT OF INCREASE 4 | INCREASE FOOTNOTE 4 | DATE OF NEXT INCREASE 5 | AMOUNT OF INCREASE 5 | INCREASE FOOTNOTE 5 | DATE OF NEXT INCREASE 6 | AMOUNT OF INCREASE 6 | INCREASE FOOTNOTE 6 | DATE OF NEXT INCREASE 7 | AMOUNT OF INCREASE 7 | INCREASE FOOTNOTE 7 | DATE OF NEXT INCREASE 8 | AMOUNT OF INCREASE 8 | INCREASE FOOTNOTE 8 | DATE OF NEXT INCREASE 9 | AMOUNT OF INCREASE 9 | INCREASE FOOTNOTE 9 | DATE OF NEXT INCREASE 10 | AMOUNT OF INCREASE 10 | INCREASE FOOTNOTE 10 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
CARPET, LINOLEUM, | RESILIENT TILE LAYER | 02/22/2021 | 12/31/2021** | 01/01/2022 | $1.450 | A | ||||||||||||||||||||||||||||
CARPET, LINOLEUM, | MATERIAL HANDLER | B | 02/22/2021 | 12/31/2021** | 01/01/2022 | $1.250 | C | |||||||||||||||||||||||||||
DRYWALL FINISHER | 02/22/2021 | 09/30/2021** | 10/01/2021 | $2.500 | D | |||||||||||||||||||||||||||||
ELECTRICIAN: | SOUND INSTALLER | 02/22/2021 | 12/26/2021** | 12/27/2021 | $3.050 | D | ||||||||||||||||||||||||||||
ELECTRICIAN: | INSIDE WIREMAN, TECHNICIAN | 02/22/2021 | 12/26/2021** | 12/27/2021 | $3.750 | D | 12/26/2022 | $3.750 | D | |||||||||||||||||||||||||
ELECTRICIAN: | CABLE SPLICER | 02/22/2021 | 12/26/2021** | 12/27/2021 | $3.750 | D | 12/26/2022 | $3.750 | D | |||||||||||||||||||||||||
FIELD SURVEYOR: | CHIEF OF PARTY (018.167-010) | E | 02/22/2021 | 09/30/2021** | 10/01/2021 | $2.750 | D | |||||||||||||||||||||||||||
FIELD SURVEYOR: | INSTRUMENTMAN (018.167-034) | E | 02/22/2021 | 09/30/2021** | 10/01/2021 | $2.450 | D | |||||||||||||||||||||||||||
FIELD SURVEYOR: | CHAINMAN/RODMAN (869.567-010) | E | 02/22/2021 | 09/30/2021** | 10/01/2021 | $2.450 | D | |||||||||||||||||||||||||||
GLAZIER | 08/22/2020 | 05/31/2021** | 06/01/2021 | $3.030 | F | 06/01/2022 | $4.020 | G | ||||||||||||||||||||||||||
MARBLE FINISHER | 08/22/2020 | 05/31/2021** | 06/01/2021 | $1.230 | D | |||||||||||||||||||||||||||||
PAINTER: | PAINTER, LEAD ABATEMENT | H | 02/22/2021 | 06/30/2021** | 07/01/2021 | $1.000 | I | 07/01/2022 | $.800 | D | ||||||||||||||||||||||||
PAINTER: | INDUSTRIAL PAINTER | H | 02/22/2021 | 06/30/2021** | 07/01/2021 | $1.000 | I | 07/01/2022 | $.800 | D | ||||||||||||||||||||||||
PLASTERER | 08/22/2020 | 08/03/2021** | 08/04/2021 | $2.200 | D | |||||||||||||||||||||||||||||
PLASTER TENDER | J | 08/22/2020 | 08/03/2021** | 08/04/2021 | $2.200 | D | ||||||||||||||||||||||||||||
PLASTER TENDER | PLASTER CLEAN-UP LABORER | 08/22/2020 | 08/03/2021** | 08/04/2021 | $2.200 | D | ||||||||||||||||||||||||||||
PLUMBER: | PLUMBER, INDUSTRIAL AND GENERAL PIPEFITTER | 08/22/2020 | 08/31/2021** | 09/01/2021 | $2.260 | D | 09/01/2022 | $2.260 | D | 09/01/2023 | $2.350 | D | 09/01/2024 | $2.500 | D | 09/01/2025 | $2.500 | D | ||||||||||||||||
PLUMBER: | SEWER AND STORM DRAIN PIPELAYER | 08/22/2020 | 08/31/2021** | 09/01/2021 | $2.260 | D | 09/01/2022 | $2.260 | D | 09/01/2023 | $2.350 | D | 09/01/2024 | $2.500 | D | 09/01/2025 | $2.500 | D | ||||||||||||||||
PLUMBER: | SEWER AND STORM DRAIN PIPE TRADESMAN | K | 08/22/2020 | 08/31/2021** | 09/01/2021 | $.900 | D | 09/01/2022 | $.900 | D | 09/01/2023 | $.940 | D | 09/01/2024 | $1.000 | D | 09/01/2025 | $1.000 | D | |||||||||||||||
PLUMBER: | SERVICE & REPAIR (PLUMBER/HVAC-FITTER) | 08/22/2020 | 08/31/2021** | 09/01/2021 | $2.260 | D | 09/01/2022 | $2.260 | D | 09/01/2023 | $2.350 | D | 09/01/2024 | $2.500 | D | 09/01/2025 | $2.500 | D | ||||||||||||||||
PLUMBER: | LANDSCAPE/IRRIGATION FITTER | 08/22/2020 | 08/31/2021** | 09/01/2021 | $2.260 | D | 09/01/2022 | $2.260 | D | 09/01/2023 | $2.350 | D | 09/01/2024 | $2.500 | D | 09/01/2025 | $2.500 | D | ||||||||||||||||
PLUMBER: | LANDSCAPE/IRRIGATION TRADESMAN | L | 08/22/2020 | 08/31/2021** | 09/01/2021 | $.590 | D | 09/01/2022 | $.590 | D | 09/01/2023 | $.610 | D | 09/01/2024 | $.650 | D | 09/01/2025 | $.650 | D | |||||||||||||||
ROOFER | 02/22/2021 | 07/31/2021** | 08/01/2021 | $2.000 | M | 08/01/2022 | $2.000 | N | ||||||||||||||||||||||||||
ROOFER | PITCH WORK | 02/22/2021 | 07/31/2021** | 08/01/2021 | $2.000 | M | 08/01/2022 | $2.000 | N | |||||||||||||||||||||||||
ROOFER | PREPARER | 02/22/2021 | 07/31/2021** | 08/01/2021 | $2.000 | M | 08/01/2022 | $2.000 | N | |||||||||||||||||||||||||
TERRAZZO FINISHER | 08/22/2020 | 08/31/2021** | 09/01/2021 | $1.680 | D | |||||||||||||||||||||||||||||
TERRAZZO WORKER | 08/22/2020 | 08/31/2021** | 09/01/2021 | $1.980 | D | |||||||||||||||||||||||||||||
TILE FINISHER | 08/22/2020 | 05/31/2021** | 06/01/2021 | $1.060 | D | |||||||||||||||||||||||||||||
TILE LAYER | 08/22/2020 | 05/31/2021** | 06/01/2021 | $1.510 | D |
FOOTNOTES
- **
- THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
- A
- $1.20 TO THE BASIC HOURLY RATE, $0.15 TO HEALTH & WELFARE AND $0.10 TO VACATION/HOLIDAY.
- B
- A MATERIAL HANDLER MAY BE UTILIZED IN RATIO OF ONE (1) MATERIAL HANDLER WITH ANY FIVE (5) JOURNEYMEN ON ANY GIVEN PROJECT.
- C
- $1.00 TO THE BASIC HOURLY RATE, $0.15 TO HEALTH & WELFARE AND $0.10 TO VACATION/HOLIDAY.
- D
- THE PREDETERMINED INCREASE SHOWN IS TO BE ALLOCATED TO WAGES AND/OR EMPLOYER PAYMENTS. PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 WHEN THE PREDETERMINED INCREASE BECOMES DUE TO CONFIRM THE DISTRIBUTION. PLEASE ALSO EXAMINE THE IMPORTANT NOTICES TO SEE IF ANY MODIFICATIONS HAVE BEEN ISSUED, AS THERE MAY BE REDUCTIONS TO PREDETERMINED INCREASES.
- E
- DICTIONARY OF OCCUPATIONAL TITLES, FOURTH EDITION, 1977, U.S. DEPARTMENT OF LABOR.
- F
- $0.25 TO HEALTH & WELFARE, $0.40 TO PENSION, $0.03 TO OTHER AND $2.35 TO WAGES AND/OR FRINGES.
- G
- $0.25 TO HEALTH & WELFARE, $1.00 TO PENSION, $0.02 TO OTHER AND $2.75 TO WAGES AND/OR FRINGES.
- H
- AN ADDITIONAL $0.25 PER HOUR WILL BE ADDED TO THE BASIC HOURLY RATE WHEN PERFORMING PAPERHANGING WORK.
- I
- $1.00 TO THE BASIC HOURLY RATE.
- J
- THE RATIO OF PLASTER TENDERS TO PLASTERERS SHALL BE AS FOLLOWS: THERE SHALL BE A PLASTER TENDER ON THE JOBSITE WHENEVER THERE IS A PLASTERER PERFORMING WORK ON THE JOBSITE, EXCEPT ON SMALL PATCH WORK WHERE ONLY ONE PLASTERER IS PERFORMING WORK. FOR INSIDE BROWN COATINGS THERE SHALL BE 2 PLASTER TENDERS FOR UP TO EVERY 3 PLASTERERS. FOR INSIDE FINISH COATINGS THERE SHALL BE 1 PLASTER TENDER FOR UP TO EVERY 3 PLASTERERS. ON OUTSIDE FINISH AND BROWN COATINGS AND FOR ALL OTHER WORK, THERE SHALL BE 1 PLASTER TENDER FOR UP TO EVERY 2 PLASTERERS.
- K
- PIPE TRADESMEN SHALL NOT BE PERMITTED ON ANY JOB WITHOUT A JOURNEYMAN.
- L
- TRADESMEN SHALL ONLY BE USED IF THE FIRST WORKER ON THE JOB IS A LANDSCAPE/IRRIGATION FITTER, SECOND WORKER MUST BE A LANDSCAPE/IRRIGATION FITTER OR APPRENTICE LANDSCAPE/IRRIGATION FITTER. THE 3RD AND 4TH MAY BE A TRADESMAN. THE 5TH MUST BE A LANDSCAPE/IRRIGATION FITTER AND THEREAFTER TRADESMEN WILL BE REFERRED ON A 50-50 BASIS, TO JOURNEYMAN OR APPRENTICE.
- M
- $1.30 TO BASIC HOURLY RATE AND $0.70 TO PENSION
- N
- $1.40 TO BASIC HOURLY RATE AND $0.60 TO PENSION