GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: RIVERSIDE COUNTY

DETERMINATION: RIV-2021-1

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE BASIC HOURLY RATE BASIC HOURLY RATE FOOTNOTE HEALTH AND WELFARE HEALTH AND WELFARE FOOTNOTE PENSION PENSION FOOTNOTE VACATION/ HOLIDAY VACATION/ HOLIDAY FOOTNOTE TRAINING TRAINING FOOTNOTE OTHER PAYMENTS OTHER PAYMENTS FOOTNOTE HOURS HOURS FOOTNOTE STRAIGHT-TIME TOTAL HOURLY RATE DAILY OVERTIME HOURLY RATE DAILY OVERTIME HOURLY RATE FOOTNOTE SATURDAY OVERTIME HOURLY RATE SATURDAY OVERTIME HOURLY RATE FOOTNOTE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE FOOTNOTE HOLIDAY PROVISIONS SCOPE OF WORK PROVISIONS TRAVEL & SUBSISTENCE PROVISIONS
#BRICKLAYER, STONEMASON, MARBLE MASON, CEMENT BLOCKLAYER, POINTER, CAULKER, CLEANER 08/22/2020 04/30/2021* $41.480 A $9.250 $8.370 $0.000 $1.010 B $0.850 8.0 C $60.960 $81.700 D $81.700 D $102.440 HolidaysScope of WorkTravel & Subsistence
#BRICKLAYER: MASON FINISHER 08/22/2020 04/30/2021* $29.070 A $9.250 $9.210 $0.000 $0.890 B $0.450 8.0 C $48.870 $63.400 D $63.400 D $77.940 HolidaysScope of WorkTravel & Subsistence
#BRICK TENDER E 08/22/2020 06/30/2021* $34.000 $8.000 $8.400 $4.400 F $0.700 $0.450 8.0 C $55.950 $72.950 $72.950 $89.950 HolidaysScope of WorkTravel & Subsistence
#BRICK TENDER FORKLIFT OPERATOR 08/22/2020 06/30/2021* $34.450 $8.000 $8.400 $4.400 F $0.700 $0.450 8.0 C $56.400 $73.630 $73.630 $90.850 HolidaysScope of WorkTravel & Subsistence
#CARPET, LINOLEUM, RESILIENT TILE LAYER 02/22/2021 12/31/2021** $38.750 G $5.630 $5.550 $2.220 $0.630 $0.280 8.0 $53.060 $72.440 $72.440 H $91.810 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, MATERIAL HANDLER I 02/22/2021 12/31/2021** $14.000 G $5.630 $1.940 $0.720 $0.630 $0.280 8.0 $23.200 $30.200 $30.200 J $37.200 HolidaysScope of WorkTravel & Subsistence
#DRYWALL FINISHER 02/22/2021 09/30/2021** $43.180 G $8.850 $7.130 $4.070 $0.870 $0.970 8.0 $65.070 $86.660 $86.660 K $108.250 HolidaysScope of WorkTravel & Subsistence
#ELECTRICIAN: SOUND INSTALLER 02/22/2021 12/26/2021** $37.600 $9.380 $5.810 L $0.000 $0.650 $0.300 M 8.0 $54.870 $74.230 N $74.230 N $93.600 HolidaysScope of WorkTravel & Subsistence
#ELECTRICIAN: INSIDE WIREMAN, TECHNICIAN 02/22/2021 12/26/2021** $46.750 O $9.380 $13.560 L $0.000 $0.730 $0.230 P 8.0 $72.330 $96.520 Q $96.520 Q $120.710 HolidaysScope of WorkTravel & Subsistence
#ELECTRICIAN: CABLE SPLICER 02/22/2021 12/26/2021** $49.090 O $9.380 $13.560 L $0.000 $0.730 $0.250 P 8.0 $74.760 $100.170 Q $100.170 Q $125.580 HolidaysScope of WorkTravel & Subsistence
#FIELD SURVEYOR: CHIEF OF PARTY (018.167-010) R 02/22/2021 09/30/2021** $53.560 $11.850 $12.150 $4.770 F $1.150 $0.150 8.0 $83.630 $110.410 N $110.410 N $137.190 HolidaysScope of WorkTravel & Subsistence
#FIELD SURVEYOR: INSTRUMENTMAN (018.167-034) R 02/22/2021 09/30/2021** $50.460 $11.850 $12.150 $4.600 F $1.150 $0.150 8.0 $80.360 $105.590 N $105.590 N $130.820 HolidaysScope of WorkTravel & Subsistence
#FIELD SURVEYOR: CHAINMAN/RODMAN (869.567-010) R 02/22/2021 09/30/2021** $49.880 $11.850 $12.150 $4.550 F $1.150 $0.150 8.0 $79.730 $104.670 N $104.670 N $129.610 HolidaysScope of WorkTravel & Subsistence
#GLAZIER 08/22/2020 05/31/2021** $47.950 S $7.750 T $13.450 $0.000 U $0.770 $0.930 8.0 $70.850 $93.330 V $93.330 V $115.800 HolidaysScope of WorkTravel & Subsistence
#MARBLE FINISHER 08/22/2020 05/31/2021** $34.690 W $9.000 $4.270 $0.000 $0.830 $0.320 8.0 $49.110 $66.450 X $66.450 Y $83.800 Z HolidaysScope of WorkTravel & Subsistence
#PAINTER: PAINTER, LEAD ABATEMENT AA 02/22/2021 06/30/2021** $33.120 O $9.000 $4.940 $2.550 $0.750 $1.010 8.0 $51.370 $67.930 AB $67.930 AB $67.930 AB HolidaysScope of WorkTravel & Subsistence
#PAINTER: REPAINT PAINTER, LEAD ABATEMENT AA 02/22/2021 06/30/2021* $29.590 O $9.000 $4.940 $2.430 $0.750 $1.010 8.0 $47.720 $62.520 AC $62.520 AC $62.520 AC HolidaysScope of WorkTravel & Subsistence
#PAINTER: INDUSTRIAL PAINTER AA 02/22/2021 06/30/2021** $35.520 O $9.000 $4.940 $2.850 $0.850 $1.010 8.0 $54.170 $71.930 AB $71.930 AB $71.930 AB HolidaysScope of WorkTravel & Subsistence
#PAINTER: INDUSTRIAL REPAINT PAINTER AA 02/22/2021 06/30/2021* $31.840 O $9.000 $4.940 $2.710 $0.850 $1.010 8.0 $50.350 $66.270 AC $66.270 AC $66.270 AC HolidaysScope of WorkTravel & Subsistence
PAINTER: GRAFFITI REMOVAL WORKER JOURNEYMAN (APPLIES ONLY TO PAINT-OVER METHOD) AD 02/22/2021 01/31/2022* $24.000 $8.400 $1.000 $0.000 $0.750 $0.000 8.0 $34.150 $46.150 $46.150 J $58.150 HolidaysScope of WorkTravel & Subsistence
PAINTER: GRAFFITI REMOVAL WORKER 1 (APPLIES ONLY TO PAINT-OVER METHOD) AE 02/22/2021 01/31/2022* $16.500 $8.400 $1.000 $0.000 $0.750 $0.000 8.0 $26.650 $34.900 $34.900 J $43.150 HolidaysScope of WorkTravel & Subsistence
PAINTER: GRAFFITI REMOVAL WORKER 2 (APPLIES ONLY TO PAINT-OVER METHOD) AF 02/22/2021 01/31/2022* $17.370 $8.400 $1.000 $0.000 $0.750 $0.000 8.0 $27.520 $36.210 $36.210 J $44.890 HolidaysScope of WorkTravel & Subsistence
#PLASTERER 08/22/2020 08/03/2021** $37.860 $9.380 $6.840 $6.890 AG $0.990 $1.040 8.0 AH $63.000 $81.930 AB $81.930 AI $100.860 HolidaysScope of WorkTravel & Subsistence
#PLASTER TENDER AJ 08/22/2020 08/03/2021** $38.580 $8.000 $8.710 $5.200 AK $1.050 $0.960 8.0 $62.500 $81.790 AL $81.790 AM $101.080 HolidaysScope of WorkTravel & Subsistence
PLASTER TENDER PLASTER CLEAN-UP LABORER 08/22/2020 08/03/2021** $36.030 $8.000 $8.710 $5.200 AK $1.050 $0.960 8.0 $59.950 $77.960 AL $77.960 AM $95.980 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: PLUMBER, INDUSTRIAL AND GENERAL PIPEFITTER 08/22/2020 08/31/2021** $52.280 AN $8.910 $13.300 AO $0.000 AP $2.500 $1.330 AQ 8.0 $78.320 $103.540 D $103.540 D $127.130 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: SEWER AND STORM DRAIN PIPELAYER 08/22/2020 08/31/2021** $39.390 AN $8.800 $10.450 AO $0.000 AP $2.230 $1.330 AQ 8.0 $62.200 $80.970 $80.970 AR $99.130 HolidaysScope of WorkTravel & Subsistence
PLUMBER: SEWER AND STORM DRAIN PIPE TRADESMAN AS 08/22/2020 08/31/2021** $19.500 AT $9.050 $0.380 $0.000 $1.360 $1.180 AQ 8.0 $31.470 $40.290 $40.290 AR $49.120 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: SERVICE & REPAIR (PLUMBER/HVAC-FITTER) 08/22/2020 08/31/2021** $50.700 AN $8.910 $12.990 AO $0.000 AP $1.830 $1.330 AQ 8.0 $75.760 $100.180 $100.180 AU $122.980 AV HolidaysScope of WorkTravel & Subsistence
#PLUMBER: LANDSCAPE/IRRIGATION FITTER 08/22/2020 08/31/2021** $35.300 W $8.910 $13.300 AO $0.000 AP $1.890 $1.130 AQ 8.0 AR $60.530 $78.180 $78.180 $94.470 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE/IRRIGATION TRADESMAN AW 08/22/2020 08/31/2021** $15.360 W $3.000 $1.160 AO $0.000 $0.100 $0.930 AQ 8.0 AR $20.550 $28.230 $28.230 $35.910 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: FIRE SPRINKLER FITTER (PROTECTION AND CONTROL SYSTEMS, OVERHEAD AND UNDERGROUND) 08/22/2020 03/31/2021* $39.830 $10.230 $14.960 AX $0.000 $0.520 $0.250 8.0 $65.790 $85.710 $85.710 $105.620 HolidaysScope of WorkTravel & Subsistence
#ROOFER 02/22/2021 07/31/2021** $40.770 AY $8.560 $9.070 AZ $0.000 BA $0.530 $0.690 BB 8.0 $59.620 $78.000 BC $78.000 BC $96.390 HolidaysScope of WorkTravel & Subsistence
#ROOFER PITCH WORK 02/22/2021 07/31/2021** $42.520 AY $8.560 $9.070 AZ $0.000 BA $0.530 $0.690 BB 8.0 $61.370 $80.630 BC $80.630 BC $99.890 HolidaysScope of WorkTravel & Subsistence
#ROOFER PREPARER 02/22/2021 07/31/2021** $41.770 AY $8.560 $9.070 AZ $0.000 BA $0.530 $0.690 BB 8.0 $60.620 $79.500 BC $79.500 BC $98.390 HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER 02/22/2021 06/30/2021* $48.280 O $11.120 $17.540 BD $0.000 $0.820 $0.680 8.0 $78.440 $102.580 BE $102.580 BE $126.720 HolidaysScope of WorkTravel & Subsistence
#TERRAZZO FINISHER 08/22/2020 08/31/2021** $33.660 G $9.250 $4.220 $0.000 BF $0.730 $0.260 8.0 AR $48.120 $64.950 X $64.950 BG $81.780 Z HolidaysScope of WorkTravel & Subsistence
#TERRAZZO WORKER 08/22/2020 08/31/2021** $41.600 G $9.250 $4.480 $0.000 BF $1.000 $0.260 8.0 AR $56.590 $77.390 X $77.390 BG $98.190 Z HolidaysScope of WorkTravel & Subsistence
#TILE FINISHER 08/22/2020 05/31/2021** $29.430 W $9.000 $2.750 $0.000 $0.760 $0.280 8.0 $42.220 $56.940 X $56.940 Y $71.650 Z HolidaysScope of WorkTravel & Subsistence
#TILE LAYER 08/22/2020 05/31/2021** $41.740 W $9.000 $8.220 $0.000 $0.940 $0.370 8.0 $60.270 $81.140 X $81.140 Y $102.010 Z HolidaysScope of WorkTravel & Subsistence

Go to increase page

FOOTNOTES

*
EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
#
INDICATES AN APPRENTICEABLE CRAFT. THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @ HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.
&
THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.
A
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF AND CONTRACT COMPLIANCE.
B
INCLUDES AN AMOUNT FOR IMI TRAINING FUND.
C
SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER, OR REASONS BEYOND THE CONTROL OF THE EMPLOYER.
D
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
E
THE RATIO OF BRICK TENDERS TO BRICKLAYERS SHALL BE AS FOLLOWS: ONE (1) BRICK TENDER TO NO MORE THAN THREE (3) BRICKLAYERS DURING THE INSTALLATION OF BLOCK ON A TYPICAL MASONRY PROJECT.
F
INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.
G
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
H
RATE APPLIES TO THE FIRST 12 HOURS WORKED ON SATURDAY, ALL OTHER TIME IS PAID AT DOUBLE TIME. SATURDAY MAY BE WORKED AT THE STRAIGHT-TIME HOURLY RATE FOR THE FIRST 8 HOURS IF INCLEMENT WEATHER FORCES A SYNTHETIC/ARTIFICIAL TURF PROJECT TO SHUT DOWN DURING THE REGULAR WORK WEEK (MONDAY THOUGH FRIDAY).
I
A MATERIAL HANDLER MAY BE UTILIZED IN RATIO OF ONE (1) MATERIAL HANDLER WITH ANY FIVE (5) JOURNEYMEN ON ANY GIVEN PROJECT.
J
RATE APPLIES TO THE FIRST 12 HOURS ON SATURDAY, ALL OTHER TIME IS PAID AT DOUBLE TIME.
K
RATE APPLIES TO FIRST 8 HOURS ONLY. DOUBLE TIME THEREAFTER. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORK WEEK DUE TO INCLEMENT WEATHER.
L
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD.
M
INCLUDES AN AMOUNT FOR THE NATIONAL LABOR-MANAGEMENT COOPERATION FUND AND THE ADMINISTRATIVE MAINTENANCE FUND.
N
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
O
INCLUDES AMOUNT WITHHELD FOR WORKING DUES.
P
IN ADDITION TO THE AMOUNT SHOWN, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER FOR EACH OVERTIME HOUR, $0.28 IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE LABOR MANAGEMENTCOOPERATION COMMITTEE FUND. AMOUNT FOR LABOR MANAGEMENTCOOPERATION COMMITTEE FUND IS NOT FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER
Q
RATE APPLIES TO THE FIRST 3 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
R
DICTIONARY OF OCCUPATIONAL TITLES, FOURTH EDITION, 1977, U.S. DEPARTMENT OF LABOR.
S
INCLUDES AMOUNT WITHHELD FOR DUES CHECKOFF, WHICH IS FACTORED IN THE OVERTIME RATES. INCLUDES $3.00 FOR VACATION THAT IS NOT FACTORED IN THE OVERTIME RATES.
T
INCLUDES AN AMOUNT PER HOUR WORKED OR PAID TO DISABILITY FUND.
U
INCLUDED IN STRAIGHT-TIME HOURLY RATE WHICH IS NOT FACTORED IN THE OVERTIME RATES.
V
RATE APPLIES TO THE FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
W
INCLUDES AMOUNT WITHHELD FOR ADMINISTRATIVE DUES.
X
RATE APPLIES TO FIRST TWO DAILY OVERTIME HOURS WORKED; ALL OTHER OVERTIME IS PAID AT THE HOLIDAY OVERTIME HOURLY RATE.
Y
RATE APPLIES TO THE FIRST 8 HOURS WORKED ON A SIXTH OR SEVENTH CONSECUTIVE DAY DURING ANY ONE CALENDAR WEEK UP TO 50 HOURS IN ANY ONE CALENDAR WEEK. ALL HOURS IN EXCESS OF 10 HOURS DAILY OR 50 HOURS WEEKLY ARE PAID AT THE HOLIDAY RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
Z
RATE APPLIES TO WORK ON HOLIDAYS ONLY; SUNDAYS ARE PAID AT THE SATURDAY OVERTIME HOURLY RATE.
AA
AN ADDITIONAL $0.25 PER HOUR WILL BE ADDED TO THE BASIC HOURLY RATE WHEN PERFORMING PAPERHANGING WORK.
AB
DOUBLE TIME SHALL BE PAID FOR ALL HOURS WORKED OVER 12 HOURS IN ANY ONE DAY.
AC
ON REPAINT WAGE WORK ANY 8 HOURS IN A 24 HOUR PERIOD MONDAY THROUGH SUNDAY SHALL BE THE WORK DAY AND ANY 40 HOURS IN A WEEK SHALL BE THE WORK WEEK, PROVIDED THAT THE 40 HOURS IS WORKED IN 5 CONSECUTIVE DAYS (LEGAL HOLIDAYS WILL NOT BE COUNTED IN THE 5 CONSECUTIVE DAYS). FOR ALL WORK UNDER THIS CRAFT/CLASSIFICATION DOUBLE TIME SHALL BE PAID FOR ALL HOURS WORKED OVER 12 HOURS IN ANY ONE DAY.
AD
RATE APPLIES AFTER 36 MONTHS OF EXPERIENCE
AE
RATE APPLIES TO FIRST 12 MONTHS OF EXPERIENCE
AF
RATE APPLIES AFTER 12 MONTHS THROUGH 36 MONTHS EXPERIENCE
AG
INCLUDES AN AMOUNT PER HOUR WORKED OR PAID FOR DUES CHECK OFF
AH
SATURDAY IN THE SAME WORKWEEK MAY BE WORKED AT THE STRAIGHT-TIME HOURLY RATE IF IT IS NOT POSSIBLE TO COMPLETE FORTY HOURS OF WORK MONDAY THROUGH FRIDAY WHEN THE JOB IS SHUT DOWN DUE TO INCLEMENT WEATHER OR SIMILAR ACT OF GOD, OR BEYOND THE CONTRACTOR'S CONTROL.
AI
RATE APPLIES TO THE FIRST 8 HOURS WORKED; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AJ
THE RATIO OF PLASTER TENDERS TO PLASTERERS SHALL BE AS FOLLOWS: THERE SHALL BE A PLASTER TENDER ON THE JOBSITE WHENEVER THERE IS A PLASTERER PERFORMING WORK ON THE JOBSITE, EXCEPT ON SMALL PATCH WORK WHERE ONLY ONE PLASTERER IS PERFORMING WORK. FOR INSIDE BROWN COATINGS THERE SHALL BE 2 PLASTER TENDERS FOR UP TO EVERY 3 PLASTERERS. FOR INSIDE FINISH COATINGS THERE SHALL BE 1 PLASTER TENDER FOR UP TO EVERY 3 PLASTERERS. ON OUTSIDE FINISH AND BROWN COATINGS AND FOR ALL OTHER WORK, THERE SHALL BE 1 PLASTER TENDER FOR UP TO EVERY 2 PLASTERERS.
AK
INCLUDES AN AMOUNT PER HOUR WORKED OR PAID FOR SUPPLEMENTAL DUES.
AL
ALL WORK PERFORMED AFTER TWELVE (12) HOURS IN A DAY SHALL BE PAID AT THE SUNDAY/HOLIDAY RATE.
AM
RATE APPLIES TO THE FIRST EIGHT HOURS ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE. SATURDAY WORK MAY BE PAID AT THE STRAIGHT TIME RATE IF THE JOB IS SHUT DOWN DURING THE NORMAL WORK WEEK DUE TO INCLEMENT WEATHER.
AN
INCLUDES AN AMOUNT WITHHELD FOR ADMINISTRATIVE DUES WHICH IS NOT FACTORED INTO OVERTIME AND AN AMOUNT FOR VACATION WHICH IS FACTORED AT 1.5 TIMES FOR ALL OVERTIME.
AO
INCLUDES AMOUNT FOR NATIONAL PENSION AND RETIREE'S X-MAS FUND.
AP
AMOUNT INCLUDED IN BASIC HOURLY RATE AND FACTORED AT 1.5 TIMES FOR ALL OVERTIME.
AQ
INCLUDES AN AMOUNT FOR THE P.I.P.E. LABOR MANAGEMENT COOPERATION COMMITTEE AND THE CONTRACTOR EDUCATION & DEVELOPMENT FUND.
AR
SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
AS
PIPE TRADESMEN SHALL NOT BE PERMITTED ON ANY JOB WITHOUT A JOURNEYMAN.
AT
INCLUDES AN AMOUNT WITHHELD FOR ADMINISTRATIVE DUES WHICH IS NOT FACTORED IN THE OVERTIME RATES.
AU
SATURDAY MAY BE WORKED AT STRAIGHT-TIME RATE, PROVIDED THAT THE HOURS DO NOT EXCEED 8 HOURS PER DAY OR 40 HOURS PER WEEK.
AV
DOUBLE TIME SHALL BE PAID FOR NEW YEAR'S DAY, EASTER SUNDAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS.
AW
TRADESMEN SHALL ONLY BE USED IF THE FIRST WORKER ON THE JOB IS A LANDSCAPE/IRRIGATION FITTER, SECOND WORKER MUST BE A LANDSCAPE/IRRIGATION FITTER OR APPRENTICE LANDSCAPE/IRRIGATION FITTER. THE 3RD AND 4TH MAY BE A TRADESMAN. THE 5TH MUST BE A LANDSCAPE/IRRIGATION FITTER AND THEREAFTER TRADESMEN WILL BE REFERRED ON A 50-50 BASIS, TO JOURNEYMAN OR APPRENTICE.
AX
INCLUDES AN AMOUNT FOR SUPPLEMENTAL PENSION FUND.
AY
INCLUDE AMOUNTS FOR DUES CHECK OFF AND VACATION/HOLIDAY, WHICH ARE NOT FACTORED INTO OVERTIME.
AZ
INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
BA
INCLUDED IN BASIC HOURLY RATE. VACATION IS NOT FACTORED INTO OVERTIME.
BB
INCLUDE AMOUNTS FOR ADMINISTRATIVE FUND, COMPLIANCE FUND, INDUSTRY FUND, AND RESEARCH AND EDUCATION TRUST FUND.
BC
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; SUNDAY AND HOLIDAY OVERTIME HOURLY RATE WILL BE PAID AFTER 10 HOURS PER DAY AND ALL HOURS WORKED OVER 55 HOURS PER WEEK.
BD
PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
BE
RATE APPLIES FOR THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 12 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY/HOLIDAY RATE. SATURDAYS IN THE SAME WORKWEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
BF
INCLUDED IN STRAIGHT-TIME HOURLY RATE.
BG
RATE APPLIES TO THE FIRST 8 HOURS WORKED ON A SIXTH OR SEVENTH CONSECUTIVE DAY DURING ANY ONE CALENDAR WEEK UP TO 50 HOURS IN ANY ONE CALENDAR WEEK. ALL OTHER TIME IS PAID AT THE HOLIDAY RATE.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH THE DIRECTOR OF INDUSTRIAL RELATIONS. IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE. YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

TRAVEL AND/OR SUBSISTENCE: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH WORKER TO EXECUTE THE WORK. YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

Return to main page