GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: SAN DIEGO COUNTY

DETERMINATION: SDI-2020-1

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE BASIC HOURLY RATE BASIC HOURLY RATE FOOTNOTE HEALTH AND WELFARE HEALTH AND WELFARE FOOTNOTE PENSION PENSION FOOTNOTE VACATION/ HOLIDAY VACATION/ HOLIDAY FOOTNOTE TRAINING TRAINING FOOTNOTE OTHER PAYMENTS OTHER PAYMENTS FOOTNOTE HOURS HOURS FOOTNOTE TOTAL HOURLY RATE DAILY OVERTIME HOURLY RATE DAILY OVERTIME HOURLY RATE FOOTNOTE SATURDAY OVERTIME HOURLY RATE SATURDAY OVERTIME HOURLY RATE FOOTNOTE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE FOOTNOTE HOLIDAY PROVISIONS SCOPE OF WORK PROVISIONS TRAVEL & SUBSISTENCE PROVISIONS
#BRICKLAYER: 02/22/2020 10/31/2020** $39.560 A $8.750 $8.360 $0.000 $0.980 B $0.100 8 C $57.750 $77.530 D $77.530 D $97.310 HolidaysScope of WorkTravel & Subsistence
BRICKLAYER: MASON FINISHER 02/22/2020 10/31/2020* $30.290 A $8.750 $8.360 $0.000 $0.880 B $0.100 8 C $48.380 $63.530 D $63.530 D $78.670 HolidaysScope of WorkTravel & Subsistence
#BRICK TENDER 02/22/2020 10/31/2020** $32.000 $7.470 $7.120 $5.050 E $0.690 $0.360 8 $52.690 $68.690 F $68.690 G $84.690 HolidaysScope of WorkTravel & Subsistence
#CARPET LAYER: RESILIENT TILE LAYER 02/22/2020 12/31/2020** $32.270 $4.100 $11.220 $1.250 $0.670 $0.550 8 $50.060 $66.190 H $66.190 I $82.330 HolidaysScope of WorkTravel & Subsistence
#DRYWALL FINISHER 02/22/2019 03/31/2019* $15.000 & $7.050 $3.000 $3.070 $0.670 $0.000 8 $28.790 $36.290 J $36.290 J $36.290 J HolidaysScope of WorkTravel & Subsistence
#ELECTRICIAN: INSIDE WIREMAN, TECHNICIAN 08/22/2019 05/31/2020* $45.000 $7.160 $6.850 K $0.000 $0.870 $0.240 8 $61.470 $84.650 L $84.650 L $107.820 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: CABLE SPLICER 08/22/2019 05/31/2020* $45.750 $7.160 $6.850 K $0.000 $0.870 $0.240 8 $62.240 $85.810 L $85.810 L $109.370 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: TUNNEL WIREMAN 08/22/2019 05/31/2020* $50.630 $7.160 $6.850 K $0.000 $0.870 $0.240 8 $67.270 $93.350 L $93.350 L $119.420 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: TUNNEL CABLE SPLICER 08/22/2019 05/31/2020* $51.380 $7.160 $6.850 K $0.000 $0.870 $0.240 8 $68.040 $94.500 L $94.500 L $120.960 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: SOUND AND SIGNAL TECHNICIAN 08/22/2019 05/31/2020** $32.950 $7.160 $4.090 K $0.000 $0.780 $0.140 8 $46.110 $63.080 H $63.080 M $80.050 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: STREETLIGHTING, TRAFFIC SIGNAL, UNDERGROUND SYSTEMS JOURNEYMAN TECHNICIAN GRADE 1 N 02/22/2020 09/30/2020* $33.420 $5.950 $1.500 K $0.000 $0.250 $0.170 8 $42.290 $59.500 O $59.500 O $76.720 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: TECH GRADE 2 N 02/22/2020 09/30/2020* $27.850 $5.950 $1.500 K $0.000 $0.250 $0.170 8 $36.560 $50.900 O $50.900 O $65.240 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: TECH GRADE 3 N 02/22/2020 09/30/2020* $25.100 $5.950 $1.500 K $0.000 $0.250 $0.170 8 $33.720 $46.650 O $46.650 O $59.580 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: TECH GRADE 4 N 02/22/2020 09/30/2020* $18.200 $5.950 $0.000 K $0.000 $0.250 $0.170 8 $25.120 $34.490 O $34.490 O $43.860 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: TECH GRADE 5 N 02/22/2020 09/30/2020* $15.300 $5.950 $0.000 K $0.000 $0.250 $0.170 8 $22.130 $30.010 O $30.010 O $37.890 HolidaysScope of WorkTravel & Subsistence
#FIELD SURVEYOR: CHIEF OF PARTY (018.167-010) P 02/22/2020 09/30/2020** $52.060 $11.600 $11.150 $4.770 E $1.150 $0.150 8 $80.880 $106.910 Q $106.910 Q $132.940 HolidaysScope of WorkTravel & Subsistence
FIELD SURVEYOR: INSTRUMENTMAN (018.167-034) P 02/22/2020 09/30/2020** $49.260 $11.600 $11.150 $4.600 E $1.150 $0.150 8 $77.910 $102.540 Q $102.540 Q $127.170 HolidaysScope of WorkTravel & Subsistence
FIELD SURVEYOR: CHAINMAN/RODMAN (869.567-010) P 02/22/2020 09/30/2020** $48.680 $11.600 $11.150 $4.550 E $1.150 $0.150 8 $77.280 $101.620 Q $101.620 Q $125.960 HolidaysScope of WorkTravel & Subsistence
#GLAZIER 02/22/2020 09/30/2020* $45.950 R $6.030 $8.940 $0.000 S $0.690 $0.350 8 T $61.960 $84.940 U $84.940 U $107.910 HolidaysScope of WorkTravel & Subsistence
#MARBLE FINISHER 08/22/2019 05/31/2020* $33.430 V $9.250 $3.950 $0.000 $0.910 $0.370 8 $47.910 $64.630 F $64.630 W $81.340 X HolidaysScope of WorkTravel & Subsistence
#PAINTER: PAINTER, LEAD ABATEMENT Y 02/22/2020 06/30/2020** $32.120 A $8.900 $4.040 $2.550 $0.600 $1.010 8 $49.220 $65.280 Z $65.280 Z $65.280 Z HolidaysScope of WorkTravel & Subsistence
PAINTER: INDUSTRIAL PAINTER Y 02/22/2020 06/30/2020** $34.020 A $8.900 $4.040 $2.850 $0.700 $1.010 8 $51.520 $68.530 Z $68.530 Z $68.530 Z HolidaysScope of WorkTravel & Subsistence
PAINTER: GRAFFITI REMOVAL WORKER JOURNEYMAN (APPLIES ONLY TO PAINT-OVER METHOD) AA 02/22/2020 01/31/2021* $23.000 $7.900 $0.640 $0.000 $0.750 $0.000 8 $32.290 $43.790 $43.790 AB $55.290 HolidaysScope of WorkTravel & Subsistence
PAINTER: GRAFFITI REMOVAL WORKER 1 (APPLIES ONLY TO PAINT-OVER METHOD) AC 02/22/2020 01/31/2021* $16.000 $7.900 $0.640 $0.000 $0.750 $0.000 8 $25.290 $33.290 $33.290 AB $41.290 HolidaysScope of WorkTravel & Subsistence
PAINTER: GRAFFITI REMOVAL WORKER 2 (APPLIES ONLY TO PAINT-OVER METHOD) AD 02/22/2020 01/31/2021* $16.870 $7.900 $0.640 $0.000 $0.750 $0.000 8 $26.160 $34.600 $34.600 AB $43.030 HolidaysScope of WorkTravel & Subsistence
#PLASTERER 08/22/2019 08/04/2020** $37.860 $9.380 $5.840 $5.870 AE $0.810 $1.040 8 AF $60.800 $79.730 Z $79.730 AG $98.660 HolidaysScope of WorkTravel & Subsistence
#PLASTER TENDER AH 08/22/2019 08/04/2020** $37.370 $7.470 $8.300 $5.180 AI $1.020 $0.960 8 $60.300 $78.990 AJ $78.990 AK $97.670 HolidaysScope of WorkTravel & Subsistence
PLASTER TENDER PLASTER CLEAN-UP LABORER 08/22/2019 08/04/2020** $34.820 $7.470 $8.300 $5.180 AI $1.020 $0.960 8 $57.750 $75.160 AJ $75.160 AK $92.570 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: PLUMBER, INDUSTRIAL AND GENERAL PIPEFITTER 02/22/2020 08/31/2020** $51.380 AL $9.160 $12.250 AM $0.000 AN $2.250 $1.270 AO 8 $76.310 $101.080 AP $101.080 AP $124.220 HolidaysScope of WorkTravel & Subsistence
PLUMBER: SEWER AND STORM DRAIN PIPELAYER 02/22/2020 08/31/2020** $38.490 AL $9.050 $9.400 AM $0.000 AN $1.980 $1.270 AO 8 $60.190 $78.510 $78.510 AQ $96.220 HolidaysScope of WorkTravel & Subsistence
PLUMBER: SEWER AND STORM DRAIN PIPE TRADESMAN AR 02/22/2020 08/31/2020** $19.040 AS $8.800 $0.380 $0.000 $1.110 $1.120 AO 8 $30.450 $39.040 $39.040 AQ $47.640 HolidaysScope of WorkTravel & Subsistence
PLUMBER: SERVICE & REPAIR (PLUMBER/HVAC-FITTER) 02/22/2020 08/31/2020** $49.830 AL $9.160 $11.940 AM $0.000 AN $1.580 $1.270 AO 8 $73.780 $97.770 $97.770 AT $120.140 AU HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE/IRRIGATION FITTER 08/22/2019 08/31/2020** $34.400 V $9.160 $12.250 AM $0.000 AN $1.640 $1.070 AO 8 AQ $58.520 $75.720 $75.720 $91.570 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE/IRRIGATION TRADESMAN AV 08/22/2019 08/31/2020** $14.940 V $3.000 $1.130 AM $0.000 $0.100 $0.870 AO 8 AQ $20.040 $27.510 $27.510 $34.980 HolidaysScope of WorkTravel & Subsistence
PLUMBER: FIRE SPRINKLER FITTER (PROTECTION AND CONTROL SYSTEMS, OVERHEAD AND UNDERGROUND) 02/22/2020 03/31/2020** $40.670 $10.230 $12.850 AW $0.000 $0.520 $0.250 8 $64.520 $84.850 $84.850 $105.190 HolidaysScope of WorkTravel & Subsistence
#ROOFER 08/22/2019 06/30/2020** $34.250 AX $6.920 $1.820 $0.000 $0.300 $0.060 8 $43.350 $59.600 $59.600 AY $75.860 X HolidaysScope of WorkTravel & Subsistence
ROOFER PITCH WORK 08/22/2019 06/30/2020** $35.750 AX $6.920 $1.820 $0.000 $0.300 $0.060 8 $44.850 $61.850 $61.850 AY $78.860 X HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER (HVAC) 08/22/2019 06/30/2020* $38.940 A $9.810 AZ $17.730 BA $0.000 $0.930 BB $0.590 BC 8 AQ $68.000 $87.470 AP $87.470 AP $106.940 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER (HVAC) SHEET METAL TECHNICIAN BD 08/22/2019 06/30/2020* $29.250 A $6.700 AZ $1.250 BA $0.000 $0.930 BB $0.540 BC 8 AQ $38.670 $53.290 AP $53.290 AP $67.920 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER (HVAC) UTILITY WORKER BE 08/22/2019 06/30/2020* $15.600 $6.300 AZ $0.000 BF $0.000 $0.550 BB $0.540 BC 8 AQ $22.990 $30.790 AP $30.790 AP $38.590 HolidaysScope of WorkTravel & Subsistence
#TERRAZZO FINISHER 02/22/2020 08/31/2020** $32.410 R $9.250 $3.910 $0.000 BG $0.660 $0.260 8 AQ $46.490 $62.690 F $62.690 BH $78.900 X HolidaysScope of WorkTravel & Subsistence
#TERRAZZO WORKER 02/22/2020 08/31/2020** $40.100 R $9.250 $4.090 $0.000 BG $0.980 $0.260 8 AQ $54.680 $74.730 F $74.730 BH $94.780 X HolidaysScope of WorkTravel & Subsistence
#TILE FINISHER 08/22/2019 05/31/2020* $28.230 V $9.250 $2.560 $0.000 $0.840 $0.310 8 $41.190 $55.310 F $55.310 W $69.420 X HolidaysScope of WorkTravel & Subsistence
#TILE LAYER 08/22/2019 05/31/2020* $40.070 V $9.250 $8.090 $0.000 $1.020 $0.370 8 $58.800 $78.830 F $78.830 W $98.870 X HolidaysScope of WorkTravel & Subsistence

Go to increase page

FOOTNOTES

*
EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
#
INDICATES AN APPRENTICEABLE CRAFT. THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @ HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.
&
THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.
A
INCLUDES AMOUNT WITHHELD FOR WORKING DUES.
B
INCLUDES AN AMOUNT FOR INTERNATIONAL MASONRY INSTITUTE PROMOTION FUND
C
SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER, OR REASONS BEYOND THE CONTROL OF THE EMPLOYER.
D
RATE APPLIES TO THE FIRST 2 DAILY AND THE FIRST 8 SATURDAY OVERTIME HOURS WORKED. ALL OTHER OVERTIME IS PAID AT THE SUNDAY RATE.
E
INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.
F
RATE APPLIES TO FIRST TWO DAILY OVERTIME HOURS WORKED; ALL OTHER OVERTIME IS PAID AT THE HOLIDAY OVERTIME HOURLY RATE.
G
RATE APPLES TO ALL HOURS WORKED ON SATURDAY.
H
RATE APPLIES TO FIRST 4 DAILY OVERTIME HOURS; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY RATE.
I
RATE APPLIES TO FIRST 8 HOURS. DOUBLE TIME THEREAFTER.
J
PURSUANT TO SECTION 1815 OF THE LABOR CODE, "WORK PERFORMED BY EMPLOYEES OF CONTRACTORS IN EXCESS OF 8 HOURS PER DAY, AND 40 HOURS DURING ANY ONE WEEK, SHALL BE PERMITTED UPON PUBLIC WORK UPON COMPENSATION FOR ALL HOURS WORKED IN EXCESS OF 8 HOURS PER DAY AT NOT LESS THAN 1-1/2 TIMES THE BASIC RATE OF PAY."
K
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
L
RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
M
APPLIES TO THE FIRST 8 HOURS; ALL OTHER TIME WILL BE PAID AT DOUBLE THE STRAIGHT-TIME RATE. IF THE WORK WEEK IS TUESDAY THROUGH SATURDAY, THE SATURDAY FOLLOWING A RECOGNIZED HOLIDAY WHICH FALLS ON MONDAY, SHALL BE PAID AT 1 1/2 STRAIGHT-TIME HOURLY RATE.
N
THE FIRST WORKER ON THE SITE MUST BE A JOURNEYMAN TECHNICIAN GRADE #1 OR #2 OR ANY HIGHER PAID JOURNEYMAN CLASSIFICATION, SUCH AS JOURNEYMAN INSIDE WIREMAN; THEREAFTER THE CONTRACTOR MAY EMPLOY FIVE (5) JOURNEYMAN TECHNICIANS WITH A MAXIMUM OF TWO (2) LEVEL #5 TECHNICIANS PER CREW. THESE SIX (6) WORKERS SHALL CONSTITUTE A CREW ON THE JOB SITE.
O
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
P
DICTIONARY OF OCCUPATIONAL TITLES, FOURTH EDITION, 1977, U.S. DEPARTMENT OF LABOR.
Q
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
R
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
S
INCLUDED IN BASIC HOURLY RATE.
T
IN THE EVENT CONDITIONS OR CIRCUMSTANCES WHICH ARE BEYOND THE CONTROL OF THE EMPLOYER, PREVENTS EMPLOYEES FROM WORKING ON ANY ONE OF THE REGULAR MONDAY THROUGH FRIDAY WORK DAYS, THEN SATURDAY MAY BE SCHEDULED AS A MAKE-UP DAY AT THE EMPLOYEE'S REGULAR STRAIGHT TIME RATE.
U
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
V
INCLUDES AMOUNT WITHHELD FOR ADMINISTRATIVE DUES.
W
RATE APPLIES TO THE FIRST 8 HOURS WORKED ON A SIXTH OR SEVENTH CONSECUTIVE DAY DURING ANY ONE CALENDAR WEEK UP TO 50 HOURS IN ANY ONE CALENDAR WEEK. ALL HOURS IN EXCESS OF 10 HOURS DAILY OR 50 HOURS WEEKLY ARE PAID AT THE HOLIDAY RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
X
RATE APPLIES TO WORK ON HOLIDAYS ONLY; SUNDAYS ARE PAID AT THE SATURDAY OVERTIME HOURLY RATE.
Y
AN ADDITIONAL $0.25 PER HOUR WILL BE ADDED TO THE BASIC HOURLY RATE WHEN PERFORMING PAPERHANGING WORK.
Z
DOUBLE TIME SHALL BE PAID FOR ALL HOURS WORKED OVER 12 HOURS IN ANY ONE DAY.
AA
RATE APPLIES AFTER 36 MONTHS OF EXPERIENCE
AB
RATE APPLIES TO THE FIRST 12 HOURS ON SATURDAY, ALL OTHER TIME IS PAID AT DOUBLE TIME.
AC
RATE APPLIES TO FIRST 12 MONTHS OF EXPERIENCE
AD
RATE APPLIES AFTER 12 MONTHS THROUGH 36 MONTHS EXPERIENCE
AE
INCLUDES AN AMOUNT PER HOUR WORKED OR PAID FOR DUES CHECK OFF
AF
SATURDAY IN THE SAME WORKWEEK MAY BE WORKED AT THE STRAIGHT-TIME HOURLY RATE IF IT IS NOT POSSIBLE TO COMPLETE FORTY HOURS OF WORK MONDAY THROUGH FRIDAY WHEN THE JOB IS SHUT DOWN DUE TO INCLEMENT WEATHER OR SIMILAR ACT OF GOD, OR BEYOND THE CONTRACTOR'S CONTROL.
AG
RATE APPLIES TO THE FIRST 8 HOURS WORKED; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AH
THE RATIO OF PLASTER TENDERS TO PLASTERERS SHALL BE AS FOLLOWS: THERE SHALL BE A PLASTER TENDER ON THE JOBSITE WHENEVER THERE IS A PLASTERER PERFORMING WORK ON THE JOBSITE, EXCEPT ON SMALL PATCH WORK WHERE ONLY ONE PLASTERER IS PERFORMING WORK. FOR INSIDE BROWN COATINGS THERE SHALL BE 2 PLASTER TENDERS FOR UP TO EVERY 3 PLASTERERS. FOR INSIDE FINISH COATINGS THERE SHALL BE 1 PLASTER TENDER FOR UP TO EVERY 3 PLASTERERS. ON OUTSIDE FINISH AND BROWN COATINGS AND FOR ALL OTHER WORK, THERE SHALL BE 1 PLASTER TENDER FOR UP TO EVERY 2 PLASTERERS.
AI
INCLUDES AN AMOUNT PER HOUR WORKED OR PAID FOR SUPPLEMENTAL DUES.
AJ
ALL WORK PERFORMED AFTER TWELVE (12) HOURS IN A DAY SHALL BE PAID AT THE SUNDAY/HOLIDAY RATE.
AK
RATE APPLIES TO THE FIRST EIGHT HOURS ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE. SATURDAY WORK MAY BE PAID AT THE STRAIGHT TIME RATE IF THE JOB IS SHUT DOWN DURING THE NORMAL WORK WEEK DUE TO INCLEMENT WEATHER.
AL
INCLUDES AN AMOUNT WITHHELD FOR ADMINISTRATIVE DUES WHICH IS NOT FACTORED INTO OVERTIME AND AN AMOUNT FOR VACATION WHICH IS FACTORED AT 1.5 TIMES FOR ALL OVERTIME.
AM
INCLUDES AMOUNT FOR NATIONAL PENSION AND RETIREE'S X-MAS FUND.
AN
AMOUNT INCLUDED IN BASIC HOURLY RATE AND FACTORED AT 1.5 TIMES FOR ALL OVERTIME.
AO
INCLUDES AN AMOUNT FOR THE P.I.P.E. LABOR MANAGEMENT COOPERATION COMMITTEE AND THE CONTRACTOR EDUCATION & DEVELOPMENT FUND.
AP
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AQ
SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
AR
PIPE TRADESMEN SHALL NOT BE PERMITTED ON ANY JOB WITHOUT A JOURNEYMAN.
AS
INCLUDES AN AMOUNT WITHHELD FOR ADMINISTRATIVE DUES WHICH IS NOT FACTORED IN THE OVERTIME RATES.
AT
SATURDAY MAY BE WORKED AT STRAIGHT-TIME RATE, PROVIDED THAT THE HOURS DO NOT EXCEED 8 HOURS PER DAY OR 40 HOURS PER WEEK.
AU
DOUBLE TIME SHALL BE PAID FOR NEW YEAR'S DAY, EASTER SUNDAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS.
AV
TRADESMEN SHALL ONLY BE USED IF THE FIRST WORKER ON THE JOB IS A LANDSCAPE/IRRIGATION FITTER, SECOND WORKER MUST BE A LANDSCAPE/IRRIGATION FITTER OR APPRENTICE LANDSCAPE/IRRIGATION FITTER. THE 3RD AND 4TH MAY BE A TRADESMAN. THE 5TH MUST BE A LANDSCAPE/IRRIGATION FITTER AND THEREAFTER TRADESMEN WILL BE REFERRED ON A 50-50 BASIS, TO JOURNEYMAN OR APPRENTICE.
AW
INCLUDES AN AMOUNT FOR SUPPLEMENTAL PENSION FUND.
AX
INCLUDES AMOUNT WITHHELD FOR WORKING ASSESSMENT.
AY
RATE APPLIES TO ALL HOURS WORKED ON SATURDAY AND SUNDAY, HOWEVER, IF THE EMPLOYEE DID NOT COMPLETE FORTY (40) HOURS MONDAY THROUGH FRIDAY UP TO EIGHT (8) HOURS CAN BE WORKED AT THE STRAIGHT-TIME HOURLY RATE ON SATURDAY.
AZ
INCLUDES AN AMOUNT FOR THE SHEET METAL OCCUPATIONAL HEALTH INSTITUTE TRUST.
BA
INCLUDES AMOUNT FOR 401(A) PLAN. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
BB
INCLUDES AN AMOUNT FOR INTERNATIONAL TRAINING INSTITUTE.
BC
INCLUDES AMOUNTS FOR NATIONAL ENERGY MANAGEMENT INSTITUTE (NEMI) FUND, SHEET METAL WORKERS' INTERNATIONAL SCHOLARSHIP FUND (SMWSF) AND INDUSTRY FUND.
BD
ONE TECHNICIAN MAY BE EMPLOYED ON EACH JOB SITE. IN ADDITION, ONE (1) TECHNICIAN MAY BE EMPLOYED FOR EACH THREE (3) BUILDING TRADES JOURNEYMAN, OR PORTION THEREOF, EMPLOYED ON THE SITE.
BE
THE EMPLOYER MAY EMPLOY ONE UTILITY WORKER, PLUS ONE FOR EACH FIVE(5) BUILDING JOURNEYMAN OR PORTION THEREOF.
BF
PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
BG
INCLUDED IN STRAIGHT-TIME HOURLY RATE.
BH
RATE APPLIES TO THE FIRST 8 HOURS WORKED ON A SIXTH OR SEVENTH CONSECUTIVE DAY DURING ANY ONE CALENDAR WEEK UP TO 50 HOURS IN ANY ONE CALENDAR WEEK. ALL OTHER TIME IS PAID AT THE HOLIDAY RATE.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH THE DIRECTOR OF INDUSTRIAL RELATIONS. IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE. YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

TRAVEL AND/OR SUBSISTENCE: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH WORKER TO EXECUTE THE WORK. YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

Return to main page