Skip to Main Content


This information is provided free of charge by the Department of Industrial Relations from its web site at www.dir.ca.gov. These regulations are for the convenience of the user and no representation or warranty is made that the information is current or accurate. See full disclaimer at https://www.dir.ca.gov/od_pub/disclaimer.html.
 
CHAPTER 4. DIVISION OF INDUSTRIAL SAFETY
Subchapter 6. Elevator Safety Orders
GROUP 4. CONVEYANCE INSTALLATIONS FOR WHICH THE INSTALLATION CONTRACT WAS SIGNED ON OR AFTER MAY 1, 2008
ARTICLE 41. CONVEYANCES COVERED BY ASME A17.1-2004

Return to index
New query

§3141.3. Static Controls.



(a) The installation of static controls shall comply with the requirements of ASME A17.1-2004 applicable to the conveyance involved.

(b) The Certified Qualified Conveyance Company (CQCC) installing static controls shall provide the Division with verification that the control complies with the requirements of ASME A17.1-2004. This information shall be in the form of:

(1) Electrical schematic diagrams or block diagrams of the control and safety circuits; and



(2) A written check-off procedure and demonstration of safety and speed control circuits at the time of the initial inspection.



(c) The results of the Electromagnetic Interference (EMI) testing required by ASME A17.1-2004 shall be submitted to the Division for review. The test shall include any wireless communication system used.


Note: Authority cited: Sections 142.3 and 7323, Labor Code. Reference: Sections 142.3 and 7323, Labor Code.



 HISTORY 
   
1. New section filed 4-1-2008; operative 5-1-2008 (Register 2008, No. 14).

Go BackGo Back to Article 41 Table of Contents