This information is provided free of charge by the Department of Industrial Relations from its web site at www.dir.ca.gov. These regulations are for the convenience of the user and no representation or warranty is made that the information is current or accurate. See full disclaimer at https://www.dir.ca.gov/od_pub/disclaimer.html.
 
Subchapter 7. General Industry Safety Orders
Group 20. Flammable Liquids, Gases and Vapors
Article 146. Piping, Valves and Fittings
Return to index
New query

§5612. Testing.


Unless tested in accordance with the applicable sections of ANSI B31, American National Standard Code for Pressure Piping, all piping before being covered, enclosed or placed in use shall be hydrostatically tested to 150 percent of the maximum anticipated pressure of the system, or pneumatically tested to 110 percent of the maximum anticipated pressure of the system, but not less than 5 pounds per square inch gage at the highest point of the system. This test shall be maintained for a sufficient time to complete visual inspection of all joints and connections, but for at least 10 minutes.

Go BackGo Back to Article 146 Table of Contents