GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: FRESNO COUNTY

DETERMINATION: FRE-2023-2

PREDETERMINED INCREASES

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE DATE OF NEXT INCREASE 1 AMOUNT OF INCREASE 1 INCREASE FOOTNOTE 1 DATE OF NEXT INCREASE 2 AMOUNT OF INCREASE 2 INCREASE FOOTNOTE 2 DATE OF NEXT INCREASE 3 AMOUNT OF INCREASE 3 INCREASE FOOTNOTE 3
BRICKLAYER, BLOCKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON 08/22/2023 04/30/2024** 05/01/2024 $3.00 A 05/01/2025 $3.10 A 05/01/2026 $3.25 A
BRICKLAYER, BLOCKLAYER: POINTER, CLEANER, CAULKER, WATERPROOFER 08/22/2023 06/30/2024** 07/01/2024 $3.00 A 07/01/2025 $3.00 A
BRICK TENDER 08/22/2023 06/30/2024** 07/01/2024 $2.65 A 07/01/2025 $3.25 A 07/01/2026 $3.71 A
ELECTRICIAN: COMM & SYSTEM INSTALLER 02/22/2023 10/31/2023** 11/01/2023 $.25 B
ELECTRICIAN: COMM & SYSTEM TECH. 02/22/2023 10/31/2023** 11/01/2023 $.25 B
ELECTRICIAN: INSIDE WIREMAN, TECHNICIAN 08/22/2023 02/29/2024** 03/01/2024 $1.40 C
ELECTRICIAN: CABLE SPLICER 08/22/2023 02/29/2024** 03/01/2024 $1.40 C
FIELD SURVEYOR: CHIEF OF PARTY D 02/22/2023 02/29/2024** 03/01/2024 $3.25 A
FIELD SURVEYOR: INSTRUMENTMAN D 02/22/2023 02/29/2024** 03/01/2024 $2.75 A
FIELD SURVEYOR: CHAINMAN/RODMAN D 02/22/2023 02/29/2024** 03/01/2024 $2.75 A
GLAZIER E 08/22/2023 12/31/2023** 01/01/2024 $2.50 F
PAINTER TAPER 08/22/2023 12/31/2023** 01/01/2024 $4.35 G 01/01/2025 $6.00 A 01/01/2026 $6.00 A
PLASTERER 08/22/2023 06/30/2024** 07/01/2024 $3.00 A
PLASTER TENDER 08/22/2023 06/30/2024** 07/01/2024 $2.60 A 07/01/2025 $2.65 A
PLUMBER: PLUMBER, STEAMFITTER, REFRIGERATION FITTER (HVAC) 08/22/2023 12/31/2023** 01/01/2024 $1.75 A 07/01/2024 $1.75 A
PLUMBER: UNDERGROUND UTILITY PIPEFITTER 08/22/2023 06/30/2024** 07/01/2024 $1.47 H
PLUMBER: LANDSCAPE PIPEFITTER 08/22/2023 06/30/2024** 07/01/2024 $1.47 H
PLUMBER: UNDERGROUND UTILITY ASSISTANT JOURNEYMAN I 08/22/2023 06/30/2024** 07/01/2024 $1.02 J
PLUMBER: LANDSCAPE ASSISTANT JOURNEYMAN K 08/22/2023 06/30/2024** 07/01/2024 $1.02 J
PLUMBER: UNDERGROUND UTILITY TRADESMAN L 08/22/2023 06/30/2024** 07/01/2024 $.97 M
PLUMBER: LANDSCAPE TRADESMAN I N 08/22/2023 06/30/2024** 07/01/2024 $.97 M
PLUMBER: LANDSCAPE TRADESMAN II N 08/22/2023 06/30/2024** 07/01/2024 $.97 M
PLUMBER: FIRE SPRINKLER FITTER (PROTECTION AND CONTROL SYSTEMS, OVERHEAD AND UNDERGROUND) 02/22/2023 12/31/2023** 01/01/2024 $.58 A 01/01/2025 $.59 A
ROOFER 02/22/2023 12/31/2023** 01/01/2024 $2.00 A
SHEET METAL WORKER METAL DECK & SIDING 08/22/2023 06/30/2024** 07/01/2024 $3.20 A 07/01/2025 $3.20 A
SHEET METAL WORKER 08/22/2023 06/30/2024** 07/01/2024 $3.15 A
TERRAZZO FINISHER O 08/22/2023 06/30/2024** 07/01/2024 $2.50 A 07/01/2025 $2.50 A 07/01/2026 $2.50 A
TERRAZZO WORKER O 08/22/2023 06/30/2024** 07/01/2024 $3.00 A 07/01/2025 $3.00 A 07/01/2026 $3.00 A
TILE SETTER 08/22/2023 03/31/2024** 04/01/2024 $3.75 A

Return to wage page

FOOTNOTES

**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
A
THE PREDETERMINED INCREASE SHOWN IS TO BE ALLOCATED TO WAGES AND/OR EMPLOYER PAYMENTS. PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 WHEN THE PREDETERMINED INCREASE BECOMES DUE TO CONFIRM THE DISTRIBUTION. PLEASE ALSO EXAMINE THE IMPORTANT NOTICES TO SEE IF ANY MODIFICATIONS HAVE BEEN ISSUED, AS THERE MAY BE REDUCTIONS TO PREDETERMINED INCREASES.
B
$0.25 TO HEALTH AND WELFARE
C
$0.25 TO PENSION AND $1.15 TO WAGES AND/OR FRINGES. PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 WHEN THE PREDETERMINED INCREASE BECOMES DUE TO CONFIRM THE DISTRIBUTION. PLEASE ALSO EXAMINE THE IMPORTANT NOTICES TO SEE IF ANY MODIFICATIONS HAVE BEEN ISSUED, AS THERE MAY BE REDUCTIONS TO PREDETERMINED INCREASES.
D
ALL CREWS, WITHOUT CONSIDERATION TO THE NUMBER OF INDIVIDUALS IN THE CREW, SHALL INCLUDE A CHIEF OF PARTY. A CREW CONSISTS OF ONE (1) OR MORE EMPLOYEES PERFORMING FIELD AND CONSTRUCTION SURVEY WORK.
E
CERTIFIED MANIPULATOR WORK SHALL RECEIVE $1.25 PER HOUR ABOVE THE BASIC WAGE RATE
F
$1.79 TO THE BASIC HOURLY RATE, $0.35 TO HEALTH AND WELFARE, AND $0.36 TO PENSION.
G
$3.25 TO BASIC HOURLY RATE, $0.35 TO HEALTH AND WELFARE, $0.75 TO PENSION
H
$1.22 TO THE BASIC HOURLY RATE, AND $0.25 TO HEALTH & WELFARE.
I
THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE.
J
$0.77 TO THE BASIC HOURLY RATE, $0.25 TO HEALTH & WELFARE.
K
THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE. THIS AGREEMENT MAY BE USED TO COVER MAINTENANCE AND PLANT ESTABLISHMENT. PLANT ESTABLISHMENT SHALL BE WORK COVERED BY THIS AGREEMENT. THIS WORK MAY BE PERFORMED EXCLUSIVELY BY ALL CLASSIFICATIONS OUTLINED IN THIS AGREEMENT WITHOUT THE SUPERVISION OF A JOURNEYMAN, EXCEPT FOR APPRENTICES WHO REQUIRE THE SUPERVISION OF A JOURNEYMAN.
L
THERE SHALL BE NO MORE THAN THREE TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON EACH JOBSITE.
M
$0.72 TO BASIC HOURLY RATE, AND $0.25 TO HEALTH & WELFARE.
N
THERE SHALL BE NO MORE THAN FOUR TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON EACH JOBSITE. THIS AGREEMENT MAY BE USED TO COVER MAINTENANCE AND PLANT ESTABLISHMENT. PLANT ESTABLISHMENT SHALL BE WORK COVERED BY THIS AGREEMENT. THIS WORK MAY BE PERFORMED EXCLUSIVELY BY ALL CLASSIFICATIONS OUTLINED IN THIS AGREEMENT WITHOUT THE SUPERVISION OF A JOURNEYMAN, EXCEPT FOR APPRENTICES WHO REQUIRE THE SUPERVISION OF A JOURNEYMAN
O
THE RATIO OF TERRAZZO FINISHER HOURS TO TERRAZZO WORKER HOURS SHALL NOT EXCEED TWO (2) TO ONE (1).

Return to main page