GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: SIERRA COUNTY

DETERMINATION: SIE-2023-1

PREDETERMINED INCREASES

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE DATE OF NEXT INCREASE 1 AMOUNT OF INCREASE 1 INCREASE FOOTNOTE 1 DATE OF NEXT INCREASE 2 AMOUNT OF INCREASE 2 INCREASE FOOTNOTE 2 DATE OF NEXT INCREASE 3 AMOUNT OF INCREASE 3 INCREASE FOOTNOTE 3 DATE OF NEXT INCREASE 4 AMOUNT OF INCREASE 4 INCREASE FOOTNOTE 4 DATE OF NEXT INCREASE 5 AMOUNT OF INCREASE 5 INCREASE FOOTNOTE 5 DATE OF NEXT INCREASE 6 AMOUNT OF INCREASE 6 INCREASE FOOTNOTE 6
BRICKLAYER, BLOCKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON (2ND SHIFT) 08/22/2022 04/30/2023** 05/01/2023 $2.800 A 05/01/2024 $3.000 A 05/01/2025 $3.100 A 05/01/2026 $3.250 A
BRICKLAYER, BLOCKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON (3RD SHIFT) 08/22/2022 04/30/2023** 05/01/2023 $2.800 A 05/01/2024 $3.000 A 05/01/2025 $3.100 A 05/01/2026 $3.250 A
ELECTRICIAN: INSIDE WIREMAN, 2ND SHIFT B 02/22/2023 07/31/2023** 08/01/2023 $2.500 A 02/01/2024 $1.000 A 08/01/2024 $3.000 A 02/01/2025 $1.000 A 08/01/2025 $3.500 A 02/01/2026 $1.000 A
ELECTRICIAN: INSIDE WIREMAN, 3RD SHIFT B 02/22/2023 07/31/2023** 08/01/2023 $2.500 A 02/01/2024 $1.000 A 08/01/2024 $3.000 A 02/01/2025 $1.000 A 08/01/2025 $3.500 A 02/01/2026 $1.000 A
ELECTRICIAN: CABLE SPLICER, 2ND SHIFT B 02/22/2023 07/31/2023** 08/01/2023 $2.500 A 02/01/2024 $1.000 A 08/01/2024 $3.000 A 02/01/2025 $1.000 A 08/01/2025 $3.500 A 02/01/2026 $1.000 A
ELECTRICIAN: CABLE SPLICER, 3RD SHIFT B 02/22/2023 07/31/2023** 08/01/2023 $2.500 A 02/01/2024 $1.000 A 08/01/2024 $3.000 A 02/01/2025 $1.000 A 08/01/2025 $3.500 A 02/01/2026 $1.000 A
GLAZIER GLAZIER (SPECIAL SHIFT) C 02/22/2023 12/31/2023** 01/01/2024 $2.000 A
MARBLE FINISHER MARBLE FINISHER (2ND SHIFT) D 08/22/2022 07/31/2023** 08/01/2023 $2.250 A
MARBLE MASON MARBLE MASON (2ND SHIFT) D 08/22/2022 07/31/2023** 08/01/2023 $3.500 A
PAINTER: TAPER (SPECIAL SHIFT) E 02/22/2023 06/30/2023** 07/01/2023 $4.350 F 07/01/2024 $4.700 A 07/01/2025 $5.000 A
PLASTERER PLASTERER: 2ND SHIFT 08/22/2022 06/30/2023** 07/01/2023 $3.000 A 07/01/2024 $3.000 A
PLASTERER PLASTERER: 3RD SHIFT 08/22/2022 06/30/2023** 07/01/2023 $3.000 A 07/01/2024 $3.000 A
SHEET METAL WORKER SHEET METAL WORKER (2ND SHIFT) 08/22/2022 06/30/2023** 07/01/2023 $3.000 A 07/01/2024 $3.000 A 07/01/2025 $3.000 A
SHEET METAL WORKER SHEET METAL WORKER (3RD SHIFT) 08/22/2022 06/30/2023** 07/01/2023 $3.000 A 07/01/2024 $3.000 A 07/01/2025 $3.000 A
SHEET METAL WORKER SHEET METAL WORKER (SPECIAL SHIFT) 08/22/2022 06/30/2023** 07/01/2023 $3.000 A 07/01/2024 $3.000 A 07/01/2025 $3.000 A
SHEET METAL WORKER MECHANICAL JOB WHERE COST OF PROJECT IS $500,000 OR UNDER (2ND SHIFT) 08/22/2022 06/30/2023** 07/01/2023 $2.250 A 07/01/2024 $2.250 A 07/01/2025 $2.250 A
SHEET METAL WORKER MECHANICAL JOB WHERE COST OF PROJECT IS $500,000 OR UNDER (3RD SHIFT) 08/22/2022 06/30/2023** 07/01/2023 $2.250 A 07/01/2024 $2.250 A 07/01/2025 $2.250 A
SHEET METAL WORKER MECHANICAL JOB WHERE COST OF PROJECT IS $500,000 OR UNDER (SPECIAL SHIFT) 08/22/2022 06/30/2023** 07/01/2023 $2.250 A 07/01/2024 $2.250 A 07/01/2025 $2.250 A
TERRAZZO FINISHER TERRAZZO FINISHER, 2ND SHIFT G 08/22/2022 06/30/2023** 07/01/2023 $2.500 A 07/01/2024 $2.500 A 07/01/2025 $2.500 A 07/01/2026 $2.500 A
TERRAZZO FINISHER TERRAZZO FINISHER, 3RD SHIFT G 08/22/2022 06/30/2023** 07/01/2023 $2.500 A 07/01/2024 $2.500 A 07/01/2025 $2.500 A 07/01/2026 $2.500 A
TERRAZZO WORKER TERRAZZO WORKER, 2ND SHIFT G 08/22/2022 06/30/2023** 07/01/2023 $3.000 A 07/01/2024 $3.000 A 07/01/2025 $3.000 A 07/01/2026 $3.000 A
TERRAZZO WORKER TERRAZZO WORKER, 3RD SHIFT G 08/22/2022 06/30/2023** 07/01/2023 $3.000 A 07/01/2024 $3.000 A 07/01/2025 $3.000 A 07/01/2026 $3.000 A

Return to wage page

FOOTNOTES

**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
A
THE PREDETERMINED INCREASE SHOWN IS TO BE ALLOCATED TO WAGES AND/OR EMPLOYER PAYMENTS. PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 WHEN THE PREDETERMINED INCREASE BECOMES DUE TO CONFIRM THE DISTRIBUTION. PLEASE ALSO EXAMINE THE IMPORTANT NOTICES TO SEE IF ANY MODIFICATIONS HAVE BEEN ISSUED, AS THERE MAY BE REDUCTIONS TO PREDETERMINED INCREASES.
B
PORTION OF COUNTY LYING WEST OF THE MAIN WATERSHED DIVIDE.
C
CERTIFIED MANIPULATOR WORK SHALL RECEIVE $1.25 PER HOUR ABOVE THE BASIC WAGE RATE
D
EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFFOLD SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.
E
PORTION OF COUNTY LYING OUTSIDE THE TAHOE BASIN WATERSHED.
F
$3.25 TO BASIC HOURLY RATE AND $1.10 TO PENSION.
G
THE RATIO OF TERRAZZO FINISHER HOURS TO TERRAZZO WORKER HOURS SHALL NOT EXCEED TWO (2) TO ONE (1).

Return to main page