GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: SONOMA COUNTY

DETERMINATION: SON-2023-1

PREDETERMINED INCREASES

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE DATE OF NEXT INCREASE 1 AMOUNT OF INCREASE 1 INCREASE FOOTNOTE 1 DATE OF NEXT INCREASE 2 AMOUNT OF INCREASE 2 INCREASE FOOTNOTE 2 DATE OF NEXT INCREASE 3 AMOUNT OF INCREASE 3 INCREASE FOOTNOTE 3 DATE OF NEXT INCREASE 4 AMOUNT OF INCREASE 4 INCREASE FOOTNOTE 4
BRICKLAYER, BLOCKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON 08/22/2022 04/30/2023** 05/01/2023 $2.80 A 05/01/2024 $3.00 A 05/01/2025 $3.10 A 05/01/2026 $3.25 A
ELECTRICIAN: COMM & SYSTEM INSTALLER 02/22/2023 10/31/2023** 11/01/2023 $.25 B
ELECTRICIAN: COMM & SYSTEM TECH. 02/22/2023 10/31/2023** 11/01/2023 $.25 B
ELECTRICIAN: INSIDE WIREMAN 08/22/2022 05/31/2023** 06/01/2023 $3.35 A
ELECTRICIAN: CABLE SPLICER 08/22/2022 05/31/2023** 06/01/2023 $3.35 A
ELECTRICIAN: TUNNEL WIREMAN 08/22/2022 05/31/2023** 06/01/2023 $3.35 A
ELECTRICIAN: TUNNEL CABLE SPLICER 08/22/2022 05/31/2023** 06/01/2023 $3.35 A
FIELD SURVEYOR: CHIEF OF PARTY C 02/22/2023 02/29/2024** 03/01/2024 $3.25 A
FIELD SURVEYOR: INSTRUMENTMAN C 02/22/2023 02/29/2024** 03/01/2024 $2.75 A
FIELD SURVEYOR: CHAINMAN/RODMAN C 02/22/2023 02/29/2024** 03/01/2024 $2.75 A
GLAZIER D 02/22/2023 12/31/2023** 01/01/2024 $2.00 A
MARBLE FINISHER E 08/22/2022 07/31/2023** 08/01/2023 $2.25 A
MARBLE MASON E 08/22/2022 07/31/2023** 08/01/2023 $3.50 A
PAINTER: TAPER 02/22/2023 06/30/2023** 07/01/2023 $4.35 F 07/01/2024 $4.70 A 07/01/2025 $5.00 A
PLASTERER 08/22/2022 06/30/2023** 07/01/2023 $3.00 A 07/01/2024 $3.00 A
PLASTER TENDER 02/22/2023 06/30/2023** 07/01/2023 $2.50 G 07/01/2024 $2.60 A 07/01/2025 $2.65 A
PLUMBER: SPRINKLER FITTER (FIRE PROTECTION AND FIRE CONTROL SYSTEMS) 02/22/2023 07/30/2023** 07/31/2023 $3.50 A
ROOFER 02/22/2023 07/31/2023** 08/01/2023 $3.85 A
ROOFER BITUMASTIC, ENAMELER, PIPE WRAPPER, COAL TAR PITCH BUILD-UP 02/22/2023 07/31/2023** 08/01/2023 $3.85 A
ROOFER MASTIC WORKER, KETTLEMAN 02/22/2023 07/31/2023** 08/01/2023 $3.85 A
SHEET METAL WORKER 08/22/2022 07/02/2023** 07/03/2023 $5.30 A 07/01/2024 $5.70 A
SHEET METAL WORKER TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS 08/22/2022 07/02/2023** 07/03/2023 $4.50 A 07/01/2024 $4.85 A
SHEET METAL WORKER SERVICE MECHANIC (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) 08/22/2022 07/02/2023** 07/03/2023 $3.18 A 07/01/2024 $3.42 A
SHEET METAL WORKER SERVICE TECHNICIAN (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) 08/22/2022 07/02/2023** 07/03/2023 $2.92 A 07/01/2024 $3.14 A
SHEET METAL WORKER AIR CONDITIONING SPECIALIST (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) 08/22/2022 07/02/2023** 07/03/2023 $2.39 A 07/01/2024 $2.57 A
SHEET METAL WORKER AIR CONDITIONING PRO (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) 08/22/2022 07/02/2023** 07/03/2023 $2.92 A 07/01/2024 $3.14 A
TERRAZZO FINISHER H 08/22/2022 06/30/2023** 07/01/2023 $2.50 A 07/01/2024 $2.50 A 07/01/2025 $2.50 A 07/01/2026 $2.50 A
TERRAZZO WORKER H 08/22/2022 06/30/2023** 07/01/2023 $3.00 A 07/01/2024 $3.00 A 07/01/2025 $3.00 A 07/01/2026 $3.00 A
TILE FINISHER 02/22/2023 03/31/2023** 04/01/2023 $3.35 I
TILE FINISHER RED CIRCLED FINISHER 02/22/2023 03/31/2023** 04/01/2023 $2.78 J
TILE SETTER 02/22/2023 03/31/2023** 04/01/2023 $3.25 K 04/01/2024 $3.75 A

Return to wage page

FOOTNOTES

**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
A
THE PREDETERMINED INCREASE SHOWN IS TO BE ALLOCATED TO WAGES AND/OR EMPLOYER PAYMENTS. PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 WHEN THE PREDETERMINED INCREASE BECOMES DUE TO CONFIRM THE DISTRIBUTION. PLEASE ALSO EXAMINE THE IMPORTANT NOTICES TO SEE IF ANY MODIFICATIONS HAVE BEEN ISSUED, AS THERE MAY BE REDUCTIONS TO PREDETERMINED INCREASES.
B
$0.25 TO HEALTH AND WELFARE
C
ALL CREWS, WITHOUT CONSIDERATION TO THE NUMBER OF INDIVIDUALS IN THE CREW, SHALL INCLUDE A CHIEF OF PARTY. A CREW CONSISTS OF ONE (1) OR MORE EMPLOYEES PERFORMING FIELD AND CONSTRUCTION SURVEY WORK.
D
CERTIFIED MANIPULATOR WORK SHALL RECEIVE $1.25 PER HOUR ABOVE THE BASIC WAGE RATE
E
EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFFOLD SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.
F
$3.25 TO BASIC HOURLY RATE AND $1.10 TO PENSION.
G
$0.50 INCREASE TO BASIC HOURLY RATE, $0.50 DECREASE TO OTHER, AND $2.50 TO WAGES AND/OR FRINGES. PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 WHEN THE PREDETERMINED INCREASE BECOMES DUE TO CONFIRM THE DISTRIBUTION. PLEASE ALSO EXAMINE THE IMPORTANT NOTICES TO SEE IF ANY MODIFICATIONS HAVE BEEN ISSUED, AS THERE MAY BE REDUCTIONS TO PREDETERMINED INCREASES.
H
THE RATIO OF TERRAZZO FINISHER HOURS TO TERRAZZO WORKER HOURS SHALL NOT EXCEED TWO (2) TO ONE (1).
I
$1.89 TO BASIC HOURLY RATE, $0.25 TO HEALTH & WELFARE, $0.85 TO PENSION, $0.04 TO TRAINING, AND $0.32 TO OTHER.
J
$1.89 TO BASIC HOURLY RATE, $0.25 TO HEALTH & WELFARE, $0.35 TO PENSION, $0.04 TO TRAINING, AND $0.25 TO OTHER.
K
$2.20 TO BASIC HOURLY RATE, $0.25 TO HEALTH & WELFARE, $0.47 TO PENSION, $0.10 TO TRAINING, AND $0.23 TO OTHER.