GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: SUTTER COUNTY

DETERMINATION: SUT-2022-2

PREDETERMINED INCREASES

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE DATE OF NEXT INCREASE 1 AMOUNT OF INCREASE 1 INCREASE FOOTNOTE 1 DATE OF NEXT INCREASE 2 AMOUNT OF INCREASE 2 INCREASE FOOTNOTE 2 DATE OF NEXT INCREASE 3 AMOUNT OF INCREASE 3 INCREASE FOOTNOTE 3 DATE OF NEXT INCREASE 4 AMOUNT OF INCREASE 4 INCREASE FOOTNOTE 4 DATE OF NEXT INCREASE 5 AMOUNT OF INCREASE 5 INCREASE FOOTNOTE 5 DATE OF NEXT INCREASE 6 AMOUNT OF INCREASE 6 INCREASE FOOTNOTE 6 DATE OF NEXT INCREASE 7 AMOUNT OF INCREASE 7 INCREASE FOOTNOTE 7
BRICKLAYER, BLOCKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON (2ND SHIFT) 08/22/2022 04/30/2023** 05/01/2023 $2.800 A 05/01/2024 $3.000 A 05/01/2025 $3.100 A 05/01/2026 $3.250 A
BRICKLAYER, BLOCKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON (3RD SHIFT) 08/22/2022 04/30/2023** 05/01/2023 $2.800 A 05/01/2024 $3.000 A 05/01/2025 $3.100 A 05/01/2026 $3.250 A
CARPET, LINOLEUM, RESILIENT TILE LAYER (2ND SHIFT) 08/22/2022 12/31/2022** 01/01/2023 $2.500 B
ELECTRICIAN: COMM & SYSTEM INSTALLER, SECOND SHIFT 02/22/2022 02/28/2023** 03/01/2023 $2.250 A
ELECTRICIAN: COMM & SYSTEM INSTALLER, THIRD SHIFT 02/22/2022 02/28/2023** 03/01/2023 $2.250 A
ELECTRICIAN: COMM & SYSTEM TECH., SECOND SHIFT 02/22/2022 02/28/2023** 03/01/2023 $2.250 A
ELECTRICIAN: COMM & SYSTEM TECH., THIRD SHIFT 02/22/2022 02/28/2023** 03/01/2023 $2.250 A
ELECTRICIAN: INSIDE WIREMAN, 2ND SHIFT 08/22/2022 01/31/2023** 02/01/2023 $1.000 A 08/01/2023 $2.500 A 02/01/2024 $1.000 A 08/01/2024 $3.000 A 02/01/2025 $1.000 A 08/01/2025 $3.500 A 02/01/2026 $1.000 A
ELECTRICIAN: INSIDE WIREMAN, 3RD SHIFT 08/22/2022 01/31/2023** 02/01/2023 $1.000 A 08/01/2023 $2.500 A 02/01/2024 $1.000 A 08/01/2024 $3.000 A 02/01/2025 $1.000 A 08/01/2025 $3.500 A 02/01/2026 $1.000 A
ELECTRICIAN: CABLE SPLICER, 2ND SHIFT 08/22/2022 01/31/2023** 02/01/2023 $1.000 A 08/01/2023 $2.500 A 02/01/2024 $1.000 A 08/01/2024 $3.000 A 02/01/2025 $1.000 A 08/01/2025 $3.500 A 02/01/2026 $1.000 A
ELECTRICIAN: CABLE SPLICER, 3RD SHIFT 08/22/2022 01/31/2023** 02/01/2023 $1.000 A 08/01/2023 $2.500 A 02/01/2024 $1.000 A 08/01/2024 $3.000 A 02/01/2025 $1.000 A 08/01/2025 $3.500 A 02/01/2026 $1.000 A
FIELD SURVEYOR: CHIEF OF PARTY (NIGHT SHIFT) C 02/22/2022 02/28/2023** 03/01/2023 $3.250 A 03/01/2024 $3.250 A
FIELD SURVEYOR: INSTRUMENTMAN (NIGHT SHIFT) C 02/22/2022 02/28/2023** 03/01/2023 $2.750 A 03/01/2024 $2.750 A
FIELD SURVEYOR: CHAINMAN/RODMAN (NIGHT SHIFT) C 02/22/2022 02/28/2023** 03/01/2023 $2.750 A 03/01/2024 $2.750 A
GLAZIER GLAZIER (SPECIAL SHIFT) D 02/22/2022 12/31/2022** 01/01/2023 $2.000 A 01/01/2024 $2.000 A
MARBLE FINISHER MARBLE FINISHER (2ND SHIFT) E 08/22/2022 07/31/2023** 08/01/2023 $2.250 A
MARBLE MASON MARBLE MASON (2ND SHIFT) E 08/22/2022 07/31/2023** 08/01/2023 $3.500 A
PAINTER PAINTER (SPECIAL SHIFT) F 08/22/2022 12/31/2022** 01/01/2023 $1.800 G
PAINTER INDUSTRIAL PAINTER (SPECIAL SHIFT) H 08/22/2022 12/31/2022** 01/01/2023 $1.800 G
PAINTER BRIDGE PAINTER (SPECIAL SHIFT) I 08/22/2022 12/31/2022** 01/01/2023 $1.800 G
PAINTER: TAPER (SPECIAL SHIFT) 08/22/2022 12/31/2022**
PLASTERER PLASTERER: 2ND SHIFT 08/22/2022 06/30/2023** 07/01/2023 $3.000 A 07/01/2024 $3.000 A
PLASTERER PLASTERER: 3RD SHIFT 08/22/2022 06/30/2023** 07/01/2023 $3.000 A 07/01/2024 $3.000 A
SHEET METAL WORKER SHEET METAL WORKER (2ND SHIFT) 08/22/2022 06/30/2023** 07/01/2023 $3.000 A 07/01/2024 $3.000 A 07/01/2025 $3.000 A
SHEET METAL WORKER SHEET METAL WORKER (3RD SHIFT) 08/22/2022 06/30/2023** 07/01/2023 $3.000 A 07/01/2024 $3.000 A 07/01/2025 $3.000 A
SHEET METAL WORKER SHEET METAL WORKER (SPECIAL SHIFT) 08/22/2022 06/30/2023** 07/01/2023 $3.000 A 07/01/2024 $3.000 A 07/01/2025 $3.000 A
TERRAZZO FINISHER TERRAZZO FINISHER, 2ND SHIFT J 08/22/2022 06/30/2023** 07/01/2023 $2.500 A 07/01/2024 $2.500 A 07/01/2025 $2.500 A 07/01/2026 $2.500 A
TERRAZZO FINISHER TERRAZZO FINISHER, 3RD SHIFT J 08/22/2022 06/30/2023** 07/01/2023 $2.500 A 07/01/2024 $2.500 A 07/01/2025 $2.500 A 07/01/2026 $2.500 A
TERRAZZO WORKER TERRAZZO WORKER, 2ND SHIFT J 08/22/2022 06/30/2023** 07/01/2023 $3.000 A 07/01/2024 $3.000 A 07/01/2025 $3.000 A 07/01/2026 $3.000 A
TERRAZZO WORKER TERRAZZO WORKER, 3RD SHIFT J 08/22/2022 06/30/2023** 07/01/2023 $3.000 A 07/01/2024 $3.000 A 07/01/2025 $3.000 A 07/01/2026 $3.000 A

Return to wage page

FOOTNOTES

**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
A
THE PREDETERMINED INCREASE SHOWN IS TO BE ALLOCATED TO WAGES AND/OR EMPLOYER PAYMENTS. PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 WHEN THE PREDETERMINED INCREASE BECOMES DUE TO CONFIRM THE DISTRIBUTION. PLEASE ALSO EXAMINE THE IMPORTANT NOTICES TO SEE IF ANY MODIFICATIONS HAVE BEEN ISSUED, AS THERE MAY BE REDUCTIONS TO PREDETERMINED INCREASES.
B
$1.52 TO THE BASIC HOURLY RATE, $0.35 TO HEALTH AND WELFARE, $0.58 TO PENSION, AND $0.05 TO TRAINING.
C
ALL CREWS, WITHOUT CONSIDERATION TO THE NUMBER OF INDIVIDUALS IN THE CREW, SHALL INCLUDE A CHIEF OF PARTY. A CREW CONSISTS OF ONE (1) OR MORE EMPLOYEES PERFORMING FIELD AND CONSTRUCTION SURVEY WORK.
D
CERTIFIED MANIPULATOR WORK SHALL RECEIVE $1.25 PER HOUR ABOVE THE BASIC WAGE RATE
E
EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFFOLD SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.
F
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: EXOTIC MATERIALS ($1.25 PER HOUR) AND LEAD ABATEMENT/REMOVAL ($1.00 PER HOUR). EMPLOYEES WORKING ON COMMERCIAL PROJECTS SHALL ALSO BE ENTITLED TO HIGH TIME PREMIUM WHENEVER THE WORK PERFORMED REQUIRES A SWINGING AND/OR PLATFORM SUSPENSION SYSTEM. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET ABOVE GROUND OR WATER LEVEL AND $6.00 PER HOUR WHEN WORKING OVER 180 FEET. SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
G
$1.38 TO BASIC HOURLY RATE, $0.35 TO HEALTH & WELFARE, AND $0.07 TO TRAINING.
H
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: METALIZING AND THERMAL SPRAY ($4.00 PER HOUR). EMPLOYEES SHALL ALSO BE ENTITLED TO HIGH TIME PREMIUM PAY WHENEVER THE WORK PERFORMED REQUIRES PERSONAL FALL RESTRAINTS TO BE WORN BY THE EMPLOYEE. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET ABOVE GROUND OR WATER LEVEL AND $6.00 PER HOUR WHEN WORKING OVER 180 FEET. SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
I
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: METALIZING AND THERMAL SPRAY ($4.00 PER HOUR). SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
J
THE RATIO OF TERRAZZO FINISHER HOURS TO TERRAZZO WORKER HOURS SHALL NOT EXCEED TWO (2) TO ONE (1).

Return to main page