GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: SAN BERNARDINO COUNTY

DETERMINATION: SBR-2022-2

PREDETERMINED INCREASES

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE DATE OF NEXT INCREASE 1 AMOUNT OF INCREASE 1 INCREASE FOOTNOTE 1 DATE OF NEXT INCREASE 2 AMOUNT OF INCREASE 2 INCREASE FOOTNOTE 2 DATE OF NEXT INCREASE 3 AMOUNT OF INCREASE 3 INCREASE FOOTNOTE 3 DATE OF NEXT INCREASE 4 AMOUNT OF INCREASE 4 INCREASE FOOTNOTE 4 DATE OF NEXT INCREASE 5 AMOUNT OF INCREASE 5 INCREASE FOOTNOTE 5 DATE OF NEXT INCREASE 6 AMOUNT OF INCREASE 6 INCREASE FOOTNOTE 6 DATE OF NEXT INCREASE 7 AMOUNT OF INCREASE 7 INCREASE FOOTNOTE 7
BRICKLAYER: BRICKLAYER, CEMENT BLOCKLAYER, POINTER, CAULKER, CLEANER 08/22/2022 04/30/2023** 05/01/2023 $2.10 A 05/01/2024 $2.20 A 05/01/2025 $2.20 A
BRICKLAYER: STONEMASON, MARBLE MASON 08/22/2022 04/30/2023** 05/01/2023 $2.10 A 05/01/2024 $2.20 A 05/01/2025 $2.20 A
BRICKLAYER: MASON FINISHER 08/22/2022 04/30/2023** 05/01/2023 $1.89 A 05/01/2024 $1.98 A 05/01/2025 $1.98 A
BRICK TENDER B 08/22/2022 06/30/2023** 07/01/2023 $2.60 A 07/01/2024 $2.70 A 07/01/2025 $2.20 A
BRICK TENDER FORKLIFT OPERATOR 08/22/2022 06/30/2023** 07/01/2023 $2.60 A 07/01/2024 $2.70 A 07/01/2025 $2.20 A
CARPET, LINOLEUM, RESILIENT TILE LAYER 08/22/2022 12/31/2022** 01/01/2023 $2.75 C 01/01/2024 $3.25 D 01/01/2025 $3.35 E 01/01/2026 $2.65 F
CARPET, LINOLEUM, MATERIAL HANDLER G 08/22/2022 12/31/2022** 01/01/2023 $1.76 H 01/01/2024 $1.69 I 01/01/2025 $1.83 J 01/01/2026 $1.32 K
DRYWALL FINISHER 08/22/2022 08/31/2023** 09/01/2023 $3.25 L 09/01/2024 $3.25 M 09/01/2026 $3.50 A
ELECTRICIAN: INSIDE WIREMAN (ZONE A) N 08/22/2022 05/31/2023** 06/01/2023 $3.15 A
ELECTRICIAN: INSIDE WIREMAN (ZONE B) O 08/22/2022 05/31/2023** 06/01/2023 $4.15 A
ELECTRICIAN: CABLE SPLICER (ZONE A) N 08/22/2022 05/31/2023** 06/01/2023 $3.15 A
ELECTRICIAN: CABLE SPLICER (ZONE B) O 08/22/2022 05/31/2023** 06/01/2023 $4.15 A
ELECTRICIAN: TUNNEL WIREMAN (ZONE A) N 08/22/2022 05/31/2023** 06/01/2023 $3.15 A
ELECTRICIAN: TUNNEL WIREMAN (ZONE B) O 08/22/2022 05/31/2023** 06/01/2023 $4.15 A
MARBLE FINISHER 08/22/2022 12/31/2022** 01/01/2023 $.75 A 06/01/2023 $2.78 A 06/01/2024 $3.41 A 06/01/2025 $3.41 A
PAINTER: PAINTER, LEAD ABATEMENT P 08/22/2022 06/30/2023** 07/01/2023 $2.50 Q 07/01/2024 $2.50 R
PAINTER: INDUSTRIAL PAINTER P 08/22/2022 06/30/2023** 07/01/2023 $2.75 S 07/01/2024 $3.00 T
PLASTERER 08/22/2022 07/31/2023** 08/01/2023 $3.25 A 08/01/2024 $3.25 A 08/01/2025 $3.50 A
PLASTER TENDER U 08/22/2022 08/01/2023** 08/02/2023 $3.20 A 08/07/2024 $3.30 A 08/06/2025 $3.40 A
PLASTER TENDER PLASTER CLEAN-UP LABORER 08/22/2022 08/01/2023** 08/02/2023 $3.20 A 08/07/2024 $3.30 A 08/06/2025 $3.40 A
PLUMBER: PLUMBER, INDUSTRIAL AND GENERAL PIPEFITTER 08/22/2022 08/31/2023** 09/01/2023 $2.35 A 09/01/2024 $2.50 A 09/01/2025 $2.50 A
PLUMBER: SEWER AND STORM DRAIN PIPELAYER 08/22/2022 08/31/2023** 09/01/2023 $2.35 A 09/01/2024 $2.50 A 09/01/2025 $2.50 A
PLUMBER: SEWER AND STORM DRAIN PIPE TRADESMAN V 08/22/2022 08/31/2023** 09/01/2023 $.94 A 09/01/2024 $1.00 A 09/01/2025 $1.00 A
PLUMBER: SERVICE & REPAIR (PLUMBER/HVAC-FITTER) 08/22/2022 08/31/2023** 09/01/2023 $2.35 A 09/01/2024 $2.50 A 09/01/2025 $2.50 A
PLUMBER: LANDSCAPE/IRRIGATION FITTER 08/22/2022 08/31/2023** 09/01/2023 $2.35 A 09/01/2024 $2.50 A 09/01/2025 $2.50 A
PLUMBER: LANDSCAPE/IRRIGATION TRADESMAN W 08/22/2022 08/31/2023** 09/01/2023 $.61 A 09/01/2024 $.65 A 09/01/2025 $.65 A
PLUMBER: FIRE SPRINKLER FITTER (PROTECTION AND CONTROL SYSTEMS, OVERHEAD AND UNDERGROUND) X 02/22/2022 12/31/2022** 01/01/2023 $.56 A 01/01/2024 $.58 A 01/01/2025 $.59 A
PLUMBER: FIRE SPRINKLER FITTER (PROTECTION AND CONTROL SYSTEMS, OVERHEAD AND UNDERGROUND) Y 08/22/2022 12/31/2022** 01/01/2023 $.56 A 09/01/2023 $2.43 A 01/01/2024 $.57 A 09/01/2024 $2.41 A 01/01/2025 $.59 A 09/01/2025 $2.39 A 01/01/2026 $.61 A
SHEET METAL WORKER 08/22/2022 12/31/2022** 01/01/2023 $1.79 A 07/01/2023 $1.79 A 01/01/2024 $1.79 A
TILE FINISHER 08/22/2022 12/31/2022** 01/01/2023 $.75 A 06/01/2023 $2.78 A 06/01/2024 $3.41 A 06/01/2025 $3.41 A
TILE LAYER 08/22/2022 12/31/2022** 01/01/2023 $1.00 A 06/01/2023 $3.18 A 06/01/2024 $3.78 A 06/01/2025 $3.78 A

Return to wage page

FOOTNOTES

**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
A
THE PREDETERMINED INCREASE SHOWN IS TO BE ALLOCATED TO WAGES AND/OR EMPLOYER PAYMENTS. PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 WHEN THE PREDETERMINED INCREASE BECOMES DUE TO CONFIRM THE DISTRIBUTION. PLEASE ALSO EXAMINE THE IMPORTANT NOTICES TO SEE IF ANY MODIFICATIONS HAVE BEEN ISSUED, AS THERE MAY BE REDUCTIONS TO PREDETERMINED INCREASES.
B
THE RATIO OF BRICK TENDERS TO BRICKLAYERS SHALL BE AS FOLLOWS: ONE (1) BRICK TENDER TO NO MORE THAN THREE (3) BRICKLAYERS DURING THE INSTALLATION OF BLOCK ON A TYPICAL MASONRY PROJECT.
C
$1.65 TO BASIC HOURLY RATE, $1.00 TO HEALTH & WELFARE, AND $0.10 TO VACATION/HOLIDAY.
D
$1.60 TO BASIC HOURLY RATE, $1.00 TO HEALTH & WELFARE, $0.10 TO VACATION/HOLIDAY, $0.50 TO PENSION, AND $0.05 TO TRAINING.
E
$1.95 TO BASIC HOURLY RATE, $1.00 TO HEALTH & WELFARE, $0.10 TO VACATION/HOLIDAY, $0.25 TO PENSION, AND $0.05 TO TRAINING
F
$1.70 TO BASIC HOURLY RATE, $0.60 TO HEALTH & WELFARE, $0.06 TO VACATION/HOLIDAY, $0.25 TO PENSION, AND $0.04 TO OTHER.
G
A MATERIAL HANDLER MAY BE UTILIZED IN RATIO OF ONE (1) MATERIAL HANDLER WITH ANY FIVE (5) JOURNEYMEN ON ANY GIVEN PROJECT.
H
$0.66 TO BASIC HOURLY RATE, $1.00 TO HEALTH & WELFARE, AND $0.10 TO VACATION/HOLIDAY.
I
$0.64 TO BASIC HOURLY RATE, $1.00 TO HEALTH & WELFARE, $0.05 TO TRAINING.
J
$0.78 TO BASIC HOURLY RATE, $1.00 TO HEALTH & WELFARE, $0.05 TO TRAINING
K
$0.68 TO BASIC HOURLY RATE, $0.60 TO HEALTH & WELFARE, $0.04 TO OTHER.
L
$2.75 TO WAGES AND/OR FRINGES AND $0.50 TO PENSION
M
$2.85 TO WAGES AND/OR FRINGES AND $0.40 TO PENSION
N
ZONE A IS DEFINED AS THE PORTION OF SAN BERNARDINO COUNTY 80 ROAD MILES FROM SAN BERNARDINO CITY HALL AT 290 N D STREET IN SAN BERNARDINO, CA 93401.
O
ZONE B INCLUDES ALL OF INYO AND MONO COUNTY AND THE PORTION OF SAN BERNARDINO COUNTY OVER 80 MILES FROM SAN BERNARDINO CITY HALL AT 290 NORTH D STREET IN SAN BERNARDINO, CA 93401.
P
AN ADDITIONAL $0.25 PER HOUR WILL BE ADDED TO THE BASIC HOURLY RATE WHEN PERFORMING PAPERHANGING WORK.
Q
$2.10 TO THE BASIC HOURLY RATE, $0.20 TO HEALTH AND WELFARE, AND $0.20 TO PENSION.
R
$2.10 TO THE BASIC HOURLY RATE, $0.40 TO PENSION.
S
$2.35 TO THE BASIC HOURLY RATE, $0.20 TO HEALTH AND WELFARE AND $0.20 TO PENSION.
T
$2.60 TO THE BASIC HOURLY RATE AND $0.40 TO PENSION.
U
THE RATIO OF PLASTER TENDERS TO PLASTERERS SHALL BE AS FOLLOWS: THERE SHALL BE A PLASTER TENDER ON THE JOBSITE WHENEVER THERE IS A PLASTERER PERFORMING WORK ON THE JOBSITE, EXCEPT ON SMALL PATCH WORK WHERE ONLY ONE PLASTERER IS PERFORMING WORK. FOR INSIDE BROWN COATINGS THERE SHALL BE 2 PLASTER TENDERS FOR UP TO EVERY 3 PLASTERERS. FOR INSIDE FINISH COATINGS THERE SHALL BE 1 PLASTER TENDER FOR UP TO EVERY 3 PLASTERERS. ON OUTSIDE FINISH AND BROWN COATINGS AND FOR ALL OTHER WORK, THERE SHALL BE 1 PLASTER TENDER FOR UP TO EVERY 2 PLASTERERS.
V
PIPE TRADESMEN SHALL NOT BE PERMITTED ON ANY JOB WITHOUT A JOURNEYMAN.
W
TRADESMEN SHALL ONLY BE USED IF THE FIRST WORKER ON THE JOB IS A LANDSCAPE/IRRIGATION FITTER, SECOND WORKER MUST BE A LANDSCAPE/IRRIGATION FITTER OR APPRENTICE LANDSCAPE/IRRIGATION FITTER. THE 3RD AND 4TH MAY BE A TRADESMAN. THE 5TH MUST BE A LANDSCAPE/IRRIGATION FITTER AND THEREAFTER TRADESMEN WILL BE REFERRED ON A 50-50 BASIS, TO JOURNEYMAN OR APPRENTICE.
X
RATE APPLIES TO REMAINDER OF COUNTY.
Y
APPLIES TO THE CITIES OF ONTARIO AND MONTCLAIR.

Return to main page