GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: TULARE COUNTY

DETERMINATION: TUL-2022-1

PREDETERMINED INCREASES

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE DATE OF NEXT INCREASE 1 AMOUNT OF INCREASE 1 INCREASE FOOTNOTE 1 DATE OF NEXT INCREASE 2 AMOUNT OF INCREASE 2 INCREASE FOOTNOTE 2 DATE OF NEXT INCREASE 3 AMOUNT OF INCREASE 3 INCREASE FOOTNOTE 3 DATE OF NEXT INCREASE 4 AMOUNT OF INCREASE 4 INCREASE FOOTNOTE 4 DATE OF NEXT INCREASE 5 AMOUNT OF INCREASE 5 INCREASE FOOTNOTE 5
BRICKLAYER, STONEMASON, MARBLE MASON, CEMENT BLOCKLAYER, POINTER, CAULKER, CLEANER 08/22/2021 04/30/2022** 05/01/2022 $2.00 A 05/01/2023 $2.10 A 05/01/2024 $2.20 A 05/01/2025 $2.20 A
ELECTRICIAN: INSIDE WIREMAN, TECHNICIAN 02/22/2022 08/31/2022** 09/01/2022 $1.30 B 03/01/2023 $1.30 B 09/01/2023 $1.40 C 03/01/2024 $1.40 C
ELECTRICIAN: CABLE SPLICER 02/22/2022 08/31/2022** 09/01/2022 $1.30 B 03/01/2023 $1.30 B 09/01/2023 $1.40 C 03/01/2024 $1.40 C
FIELD SURVEYOR: CHIEF OF PARTY D 02/22/2022 02/28/2023** 03/01/2023 $3.25 A 03/01/2024 $3.25 A
FIELD SURVEYOR: INSTRUMENTMAN D 02/22/2022 02/28/2023** 03/01/2023 $2.75 A 03/01/2024 $2.75 A
FIELD SURVEYOR: CHAINMAN/RODMAN D 02/22/2022 02/28/2023** 03/01/2023 $2.75 A 03/01/2024 $2.75 A
MARBLE FINISHER E 08/22/2021 07/31/2022** 08/01/2022 $2.15 A 08/01/2023 $2.25 A
PAINTER: F 02/22/2022 12/31/2022** 01/01/2023 $1.30 A 07/01/2023 $.50 A
PAINTER: INDUSTRIAL PAINTER G 02/22/2022 12/31/2022** 01/01/2023 $1.30 A 07/01/2023 $.50 A
PAINTER: BRIDGE PAINTER H 02/22/2022 12/31/2022** 01/01/2023 $1.30 A 07/01/2023 $.50 A
PLASTERER 02/22/2022 06/30/2022** 07/01/2022 $3.00 A 07/01/2023 $3.00 A 07/01/2024 $3.00 A
PLASTER TENDER 08/22/2021 06/30/2022** 07/01/2022 $2.75 A
PLUMBER: PLUMBER, STEAMFITTER, REFRIGERATION FITTER (HVAC) 02/22/2022 06/30/2022** 07/01/2022 $1.55 A 01/01/2023 $1.65 A 07/01/2023 $1.65 A 01/01/2024 $1.75 A 07/01/2024 $1.75 A
PLUMBER: FIRE SPRINKLER FITTER (PROTECTION AND CONTROL SYSTEMS, OVERHEAD AND UNDERGROUND) 02/22/2022 12/31/2022** 01/01/2023 $.56 A 01/01/2024 $.58 A 01/01/2025 $.59 A
ROOFER 02/22/2022 12/31/2022** 01/01/2023 $3.00 A 01/01/2024 $2.00 A

Return to wage page

FOOTNOTES

**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
A
THE PREDETERMINED INCREASE SHOWN IS TO BE ALLOCATED TO WAGES AND/OR EMPLOYER PAYMENTS. PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 WHEN THE PREDETERMINED INCREASE BECOMES DUE TO CONFIRM THE DISTRIBUTION. PLEASE ALSO EXAMINE THE IMPORTANT NOTICES TO SEE IF ANY MODIFICATIONS HAVE BEEN ISSUED, AS THERE MAY BE REDUCTIONS TO PREDETERMINED INCREASES.
B
$0.25 TO PENSION AND $1.05 TO WAGES AND/OR FRINGES. PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 WHEN THE PREDETERMINED INCREASE BECOMES DUE TO CONFIRM THE DISTRIBUTION. PLEASE ALSO EXAMINE THE IMPORTANT NOTICES TO SEE IF ANY MODIFICATIONS HAVE BEEN ISSUED, AS THERE MAY BE REDUCTIONS TO PREDETERMINED INCREASES.
C
$0.25 TO PENSION AND $1.15 TO WAGES AND/OR FRINGES. PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 WHEN THE PREDETERMINED INCREASE BECOMES DUE TO CONFIRM THE DISTRIBUTION. PLEASE ALSO EXAMINE THE IMPORTANT NOTICES TO SEE IF ANY MODIFICATIONS HAVE BEEN ISSUED, AS THERE MAY BE REDUCTIONS TO PREDETERMINED INCREASES.
D
ALL CREWS, WITHOUT CONSIDERATION TO THE NUMBER OF INDIVIDUALS IN THE CREW, SHALL INCLUDE A CHIEF OF PARTY. A CREW CONSISTS OF ONE (1) OR MORE EMPLOYEES PERFORMING FIELD AND CONSTRUCTION SURVEY WORK.
E
EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFFOLD SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.
F
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: WALLCOVERING ($1.00 PER HOUR), SPRAY WORK ($1.00 PER HOUR) REMEDIAL PATCHING ($1.25 PER HOUR) AND ABRASIVE BLASTING/LEAD ABATEMENT ($1.50 PER HOUR). EMPLOYEES WORKING OVER 30 FEET (EXCLUDING WORK FROM A LIFT 60 FEET AND LOWER) SHALL RECEIVE ONE DOLLAR ($1.00) PER HOUR ABOVE THE BASIC HOURLY RATE IN ADDITION TO ANY OTHER PREMIUM PAY.
G
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: METALIZING AND THERMAL SPRAY ($4.00 PER HOUR). EMPLOYEES SHALL ALSO BE ENTITLED TO HIGH TIME PREMIUM PAY WHENEVER THE WORK PERFORMED REQUIRES PERSONAL FALL RESTRAINTS TO BE WORN BY THE EMPLOYEE. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET ABOVE GROUND OR WATER LEVEL AND $6.00 PER HOUR WHEN WORKING OVER 180 FEET. SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
H
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: METALIZING AND THERMAL SPRAY ($4.00 PER HOUR). SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.

Return to main page