GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: MONTEREY COUNTY

DETERMINATION: MTY-2021-2

PREDETERMINED INCREASES

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE DATE OF NEXT INCREASE 1 AMOUNT OF INCREASE 1 INCREASE FOOTNOTE 1 DATE OF NEXT INCREASE 2 AMOUNT OF INCREASE 2 INCREASE FOOTNOTE 2
BRICKLAYER, BLOCKLAYER, POINTER, CLEANER, CAULKER, WATERPROOFER (2ND SHIFT) 08/22/2021 06/30/2022** 07/01/2022 $2.500 A
BRICKLAYER, BLOCKLAYER, POINTER, CLEANER, CAULKER, WATERPROOFER (3RD SHIFT) 08/22/2021 06/30/2022** 07/01/2022 $2.500 A
BRICK TENDER BRICK TENDER (SPECIAL SINGLE SHIFT) 08/22/2021 06/30/2022** 07/01/2022 $2.000 A
CARPET, LINOLEUM, SOFT FLOOR LAYER (SPECIAL SHIFT) 02/22/2021 12/31/2021** 01/01/2022 $3.000 A
ELECTRICIAN: COMM & SYSTEM INSTALLER, SECOND SHIFT 02/22/2021 11/30/2021** 12/01/2021 $4.000 A
ELECTRICIAN: COMM & SYSTEM INSTALLER, THIRD SHIFT 02/22/2021 11/30/2021** 12/01/2021 $4.000 A
ELECTRICIAN: COMM & SYSTEM TECH., SECOND SHIFT 02/22/2021 11/30/2021** 12/01/2021 $4.000 A
ELECTRICIAN: COMM & SYSTEM TECH., THIRD SHIFT 02/22/2021 11/30/2021** 12/01/2021 $4.000 A
MARBLE FINISHER MARBLE FINISHER (2ND SHIFT) B 08/22/2021 07/31/2022** 08/01/2022 $2.150 A 08/01/2023 $2.250 A
MARBLE MASON MARBLE MASON (2ND SHIFT) B 08/22/2021 07/31/2022** 08/01/2022 $3.250 A 08/01/2023 $3.500 A
PAINTER PAINTER (SPECIAL SHIFT) C 02/22/2021 12/31/2021** 01/01/2022 $2.000 A 01/01/2023 $2.000 A
PAINTER INDUSTRIAL PAINTER (SPECIAL SHIFT) D 02/22/2021 12/31/2021** 01/01/2022 $2.000 A 01/01/2023 $2.000 A
PAINTER BRIDGE PAINTER (SPECIAL SHIFT) E 02/22/2021 12/31/2021** 01/01/2022 $2.000 A 01/01/2023 $2.000 A

Return to wage page

FOOTNOTES

**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
A
THE PREDETERMINED INCREASE SHOWN IS TO BE ALLOCATED TO WAGES AND/OR EMPLOYER PAYMENTS. PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 WHEN THE PREDETERMINED INCREASE BECOMES DUE TO CONFIRM THE DISTRIBUTION. PLEASE ALSO EXAMINE THE IMPORTANT NOTICES TO SEE IF ANY MODIFICATIONS HAVE BEEN ISSUED, AS THERE MAY BE REDUCTIONS TO PREDETERMINED INCREASES.
B
EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFFOLD SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.
C
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: WALLCOVERING ($2.00 PER HOUR), EXOTIC MATERIALS ($1.25 PER HOUR) AND LEAD ABATEMENT/REMOVAL ($1.00 PER HOUR). EMPLOYEES SHALL ALSO BE ENTITLED TO HIGH TIME PREMIUM PAY WHENEVER THE WORK PERFORMED REQUIRES PERSONAL FALL RESTRAINTS TO BE WORN BY THE EMPLOYEE. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $2.00 PER HOUR ABOVE BASIC HOURLY RATE WHEN WORKING OVER 50 FEET ABOVE GROUND OR WATER LEVEL, $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET AND $6.00 PER HOUR WHEN WORKING OVER 180 FEET. SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
D
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: METALIZING AND THERMAL SPRAY ($4.00 PER HOUR). EMPLOYEES SHALL ALSO BE ENTITLED TO HIGH TIME PREMIUM PAY WHENEVER THE WORK PERFORMED REQUIRES PERSONAL FALL RESTRAINTS TO BE WORN BY THE EMPLOYEE. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET ABOVE GROUND OR WATER LEVEL AND $6.00 PER HOUR WHEN WORKING OVER 180 FEET. SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
E
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: METALIZING AND THERMAL SPRAY ($4.00 PER HOUR). SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.

Return to main page