GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: VENTURA COUNTY

DETERMINATION: VEN-2021-1

PREDETERMINED INCREASES

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE DATE OF NEXT INCREASE 1 AMOUNT OF INCREASE 1 INCREASE FOOTNOTE 1 DATE OF NEXT INCREASE 2 AMOUNT OF INCREASE 2 INCREASE FOOTNOTE 2 DATE OF NEXT INCREASE 3 AMOUNT OF INCREASE 3 INCREASE FOOTNOTE 3 DATE OF NEXT INCREASE 4 AMOUNT OF INCREASE 4 INCREASE FOOTNOTE 4 DATE OF NEXT INCREASE 5 AMOUNT OF INCREASE 5 INCREASE FOOTNOTE 5 DATE OF NEXT INCREASE 6 AMOUNT OF INCREASE 6 INCREASE FOOTNOTE 6 DATE OF NEXT INCREASE 7 AMOUNT OF INCREASE 7 INCREASE FOOTNOTE 7 DATE OF NEXT INCREASE 8 AMOUNT OF INCREASE 8 INCREASE FOOTNOTE 8 DATE OF NEXT INCREASE 9 AMOUNT OF INCREASE 9 INCREASE FOOTNOTE 9 DATE OF NEXT INCREASE 10 AMOUNT OF INCREASE 10 INCREASE FOOTNOTE 10
CARPET, LINOLEUM, RESILIENT TILE LAYER 02/22/2021 12/31/2021** 01/01/2022 $1.450 A
CARPET, LINOLEUM, MATERIAL HANDLER B 02/22/2021 12/31/2021** 01/01/2022 $1.250 C
DRYWALL FINISHER 02/22/2021 09/30/2021** 10/01/2021 $2.500 D
ELECTRICIAN: SOUND INSTALLER 02/22/2021 12/26/2021** 12/27/2021 $3.050 D
ELECTRICIAN: INSIDE WIREMAN E 02/22/2021 07/25/2021** 07/26/2021 $1.000 D 12/27/2021 $1.210 D 07/25/2022 $1.160 D 12/26/2022 $1.340 D 07/31/2023 $1.290 D 12/25/2023 $1.450 D 07/29/2024 $1.350 D
ELECTRICIAN: CABLE SPLICER E 02/22/2021 07/25/2021** 07/26/2021 $1.000 D 12/27/2021 $1.210 D 07/25/2022 $1.160 D 12/26/2022 $1.340 D 07/31/2023 $1.290 D 12/25/2023 $1.450 D 07/29/2024 $1.350 D
ELECTRICIAN: TRANSPORTATION SYSTEMS WIREMAN E 02/22/2021 07/25/2021** 07/26/2021 $1.000 D 12/27/2021 $1.210 D 07/25/2022 $1.160 D 12/26/2022 $1.340 D 07/31/2023 $1.290 D 12/25/2023 $1.450 D 07/29/2024 $1.350 D
ELECTRICIAN: TRANSPORTATION SYSTEMS TECHNICIAN E 02/22/2021 07/25/2021** 07/26/2021 $1.000 D 12/27/2021 $1.210 D 07/25/2022 $1.160 D 12/26/2022 $1.340 D 07/31/2023 $1.290 D 12/25/2023 $1.450 D 07/29/2024 $1.350 D
FIELD SURVEYOR: CHIEF OF PARTY (018.167-010) F 02/22/2021 09/30/2021** 10/01/2021 $2.750 D
FIELD SURVEYOR: INSTRUMENTMAN (018.167-034) F 02/22/2021 09/30/2021** 10/01/2021 $2.450 D
FIELD SURVEYOR: CHAINMAN/RODMAN (869.567-010) F 02/22/2021 09/30/2021** 10/01/2021 $2.450 D
GLAZIER 08/22/2020 05/31/2021** 06/01/2021 $3.030 G 06/01/2022 $4.020 H
MARBLE FINISHER 08/22/2020 05/31/2021** 06/01/2021 $1.230 D
PAINTER: PAINTER, LEAD ABATEMENT I 02/22/2021 06/30/2021** 07/01/2021 $1.000 J 07/01/2022 $.800 D
PAINTER: INDUSTRIAL PAINTER I 02/22/2021 06/30/2021** 07/01/2021 $1.000 J 07/01/2022 $.800 D
PLASTERER 08/22/2020 08/03/2021** 08/04/2021 $2.200 D
PLASTER TENDER K 08/22/2020 08/03/2021** 08/04/2021 $2.200 D
PLASTER TENDER PLASTER CLEAN-UP LABORER 08/22/2020 08/03/2021** 08/04/2021 $2.200 D
PLUMBER: PLUMBER, INDUSTRIAL AND GENERAL PIPEFITTER 08/22/2020 08/31/2021** 09/01/2021 $2.260 D 09/01/2022 $2.260 D 09/01/2023 $2.350 D 09/01/2024 $2.500 D 09/01/2025 $2.500 D
PLUMBER: SEWER AND STORM DRAIN PIPELAYER 08/22/2020 08/31/2021** 09/01/2021 $2.260 D 09/01/2022 $2.260 D 09/01/2023 $2.350 D 09/01/2024 $2.500 D 09/01/2025 $2.500 D
PLUMBER: SEWER AND STORM DRAIN PIPE TRADESMAN L 08/22/2020 08/31/2021** 09/01/2021 $.900 D 09/01/2022 $.900 D 09/01/2023 $.940 D 09/01/2024 $1.000 D 09/01/2025 $1.000 D
PLUMBER: SERVICE AND REPAIR 08/22/2020 08/31/2021** 09/01/2021 $2.260 D 09/01/2022 $2.260 D 09/01/2023 $2.350 D 09/01/2024 $2.500 D 09/01/2025 $2.500 D
PLUMBER: LANDSCAPE/IRRIGATION FITTER 08/22/2020 08/31/2021** 09/01/2021 $2.260 D 09/01/2022 $2.260 D 09/01/2023 $2.350 D 09/01/2024 $2.500 D 09/01/2025 $2.500 D
PLUMBER: LANDSCAPE/IRRIGATION TRADESMAN M 08/22/2020 08/31/2021** 09/01/2021 $.590 D 09/01/2022 $.590 D 09/01/2023 $.610 D 09/01/2024 $.650 D 09/01/2025 $.650 D
PLUMBER: REFRIGERATION SERVICE HVACR 08/22/2020 08/29/2021** 08/30/2021 $2.150 D 09/05/2022 $2.150 D 09/04/2023 $2.150 D
ROOFER 02/22/2021 07/31/2021** 08/01/2021 $2.000 N 08/01/2022 $2.000 O
ROOFER PITCH WORK 02/22/2021 07/31/2021** 08/01/2021 $2.000 N 08/01/2022 $2.000 O
ROOFER PREPARER 02/22/2021 07/31/2021** 08/01/2021 $2.000 N 08/01/2022 $2.000 O
SHEET METAL WORKER (HVAC) 08/22/2020 07/31/2021** 08/01/2021 $2.750 P 08/01/2022 $2.750 Q
TERRAZZO FINISHER 08/22/2020 08/31/2021** 09/01/2021 $1.680 D
TERRAZZO WORKER 08/22/2020 08/31/2021** 09/01/2021 $1.980 D
TILE FINISHER 08/22/2020 05/31/2021** 06/01/2021 $1.060 D
TILE LAYER 08/22/2020 05/31/2021** 06/01/2021 $1.510 D

Return to wage page

FOOTNOTES

**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
A
$1.20 TO THE BASIC HOURLY RATE, $0.15 TO HEALTH & WELFARE AND $0.10 TO VACATION/HOLIDAY.
B
A MATERIAL HANDLER MAY BE UTILIZED IN RATIO OF ONE (1) MATERIAL HANDLER WITH ANY FIVE (5) JOURNEYMEN ON ANY GIVEN PROJECT.
C
$1.00 TO THE BASIC HOURLY RATE, $0.15 TO HEALTH & WELFARE AND $0.10 TO VACATION/HOLIDAY.
D
THE PREDETERMINED INCREASE SHOWN IS TO BE ALLOCATED TO WAGES AND/OR EMPLOYER PAYMENTS. PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 WHEN THE PREDETERMINED INCREASE BECOMES DUE TO CONFIRM THE DISTRIBUTION. PLEASE ALSO EXAMINE THE IMPORTANT NOTICES TO SEE IF ANY MODIFICATIONS HAVE BEEN ISSUED, AS THERE MAY BE REDUCTIONS TO PREDETERMINED INCREASES.
E
ZONE 2 CONSISTS OF ALL AREAS OUTSIDE OF 32 ROAD MILES FROM THE CITIES OF CAMARILLO, OXNARD, SANTA PAULA, VENTURA AND OAK VIEW. ALL WORKERS PERFORMING WORK IN ZONE 2 SHALL RECEIVE $5.00 PER HOUR ABOVE THE ZONE 1 BASIC HOURLY RATE. RATES FOR ELECTRICAL WORKERS WORKING IN COMPRESSED AIR AS WELL AS THEIR SUPPORT CLASSIFICATIONS ARE AVAILABLE BY REQUEST. PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.
F
DICTIONARY OF OCCUPATIONAL TITLES, FOURTH EDITION, 1977, U.S. DEPARTMENT OF LABOR.
G
$0.25 TO HEALTH & WELFARE, $0.40 TO PENSION, $0.03 TO OTHER AND $2.35 TO WAGES AND/OR FRINGES.
H
$0.25 TO HEALTH & WELFARE, $1.00 TO PENSION, $0.02 TO OTHER AND $2.75 TO WAGES AND/OR FRINGES.
I
AN ADDITIONAL $0.25 PER HOUR WILL BE ADDED TO THE BASIC HOURLY RATE WHEN PERFORMING PAPERHANGING WORK.
J
$1.00 TO THE BASIC HOURLY RATE.
K
THE RATIO OF PLASTER TENDERS TO PLASTERERS SHALL BE AS FOLLOWS: THERE SHALL BE A PLASTER TENDER ON THE JOBSITE WHENEVER THERE IS A PLASTERER PERFORMING WORK ON THE JOBSITE, EXCEPT ON SMALL PATCH WORK WHERE ONLY ONE PLASTERER IS PERFORMING WORK. FOR INSIDE BROWN COATINGS THERE SHALL BE 2 PLASTER TENDERS FOR UP TO EVERY 3 PLASTERERS. FOR INSIDE FINISH COATINGS THERE SHALL BE 1 PLASTER TENDER FOR UP TO EVERY 3 PLASTERERS. ON OUTSIDE FINISH AND BROWN COATINGS AND FOR ALL OTHER WORK, THERE SHALL BE 1 PLASTER TENDER FOR UP TO EVERY 2 PLASTERERS.
L
PIPE TRADESMEN SHALL NOT BE PERMITTED ON ANY JOB WITHOUT A JOURNEYMAN.
M
TRADESMEN SHALL ONLY BE USED IF THE FIRST WORKER ON THE JOB IS A LANDSCAPE/IRRIGATION FITTER, SECOND WORKER MUST BE A LANDSCAPE/IRRIGATION FITTER OR APPRENTICE LANDSCAPE/IRRIGATION FITTER. THE 3RD AND 4TH MAY BE A TRADESMAN. THE 5TH MUST BE A LANDSCAPE/IRRIGATION FITTER AND THEREAFTER TRADESMEN WILL BE REFERRED ON A 50-50 BASIS, TO JOURNEYMAN OR APPRENTICE.
N
$1.30 TO BASIC HOURLY RATE AND $0.70 TO PENSION
O
$1.40 TO BASIC HOURLY RATE AND $0.60 TO PENSION
P
$0.05 TO TRAINING AND $2.70 TO WAGES AND/OR FRINGES.
Q
$0.01 TO OTHER AND $2.74 TO WAGES AND/OR FRINGES.

Return to main page