GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: AMADOR COUNTY

DETERMINATION: AMA-2021-1

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE BASIC HOURLY RATE BASIC HOURLY RATE FOOTNOTE HEALTH AND WELFARE HEALTH AND WELFARE FOOTNOTE PENSION PENSION FOOTNOTE VACATION/ HOLIDAY VACATION/ HOLIDAY FOOTNOTE TRAINING TRAINING FOOTNOTE OTHER PAYMENTS OTHER PAYMENTS FOOTNOTE HOURS HOURS FOOTNOTE STRAIGHT-TIME TOTAL HOURLY RATE DAILY OVERTIME HOURLY RATE DAILY OVERTIME HOURLY RATE FOOTNOTE SATURDAY OVERTIME HOURLY RATE SATURDAY OVERTIME HOURLY RATE FOOTNOTE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE FOOTNOTE HOLIDAY PROVISIONS SCOPE OF WORK PROVISIONS TRAVEL & SUBSISTENCE PROVISIONS SHIFT PROVISIONS
#BRICKLAYER, BLOCKLAYER, POINTER, CLEANER, CAULKER, WATERPROOFER (2ND SHIFT) 08/22/2020 06/30/2021** $54.000 A $10.750 $11.220 $0.000 B $1.510 $0.430 8.0 C $77.910 $104.910 $104.910 D $131.910 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#BRICKLAYER, BLOCKLAYER, POINTER, CLEANER, CAULKER, WATERPROOFER (3RD SHIFT) 08/22/2020 06/30/2021** $56.350 A $10.750 $11.220 $0.000 B $1.510 $0.430 8.0 C $80.260 $108.430 $108.430 D $136.610 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#BRICKLAYER, BLOCKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON (2ND SHIFT) 08/22/2020 04/30/2021** $47.130 A $10.750 $9.320 $2.500 E $0.800 $1.810 F 8.0 C $72.310 $97.130 G $97.130 G $121.940 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#BRICKLAYER, BLOCKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON (3RD SHIFT) 08/22/2020 04/30/2021** $49.390 A $10.750 $9.320 $2.500 E $0.800 $1.810 F 8.0 C $74.570 $100.510 G $100.510 G $126.460 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#BRICK TENDER BRICK TENDER (SPECIAL SINGLE SHIFT) 08/22/2020 06/30/2021** $38.890 H $9.000 $11.210 $0.000 B $0.450 $0.300 8.0 $59.850 $79.290 I $79.290 I $98.740 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#CARPET, LINOLEUM, RESILIENT TILE LAYER (2ND SHIFT) 02/22/2021 12/31/2021** $46.320 A $10.550 $12.140 $0.000 J $0.700 $0.160 8.0 $69.870 $116.190 $116.190 $116.190 K HolidaysScope of WorkTravel & Subsistence Shift Provisions
#ELECTRICIAN: COMM & SYSTEM INSTALLER, SECOND SHIFT 02/22/2020 01/31/2021* $35.600 $11.300 $5.950 L $0.000 $1.100 $1.110 M 8.0 $56.310 $74.730 $74.730 $93.160 N HolidaysScope of WorkTravel & Subsistence Shift Provisions
#ELECTRICIAN: COMM & SYSTEM INSTALLER, THIRD SHIFT 02/22/2020 01/31/2021* $39.880 $11.300 $5.950 L $0.000 $1.100 $1.110 M 8.0 $60.740 $81.370 $81.370 $102.010 N HolidaysScope of WorkTravel & Subsistence Shift Provisions
#ELECTRICIAN: COMM & SYSTEM TECH., SECOND SHIFT 02/22/2020 01/31/2021* $40.940 $11.300 $5.950 L $0.000 $1.100 $1.110 M 8.0 $61.830 $83.010 $83.010 $104.200 N HolidaysScope of WorkTravel & Subsistence Shift Provisions
#ELECTRICIAN: COMM & SYSTEM TECH., THIRD SHIFT 02/22/2020 01/31/2021* $45.860 $11.300 $5.950 L $0.000 $1.100 $1.110 M 8.0 $66.930 $90.660 $90.660 $114.390 N HolidaysScope of WorkTravel & Subsistence Shift Provisions
#ELECTRICIAN: INSIDE WIREMAN, 2ND SHIFT 02/22/2021 05/31/2021* $48.750 $12.760 $8.750 L $0.000 B $1.760 $7.970 O 8.0 $82.230 $107.730 P $107.730 P $133.230 N HolidaysScope of WorkTravel & Subsistence Shift Provisions
#ELECTRICIAN: INSIDE WIREMAN, 3RD SHIFT 02/22/2021 05/31/2021* $54.610 $12.760 $8.750 L $0.000 B $1.760 $7.970 O 8.0 $88.360 $116.920 P $116.920 P $145.480 N HolidaysScope of WorkTravel & Subsistence Shift Provisions
#ELECTRICIAN: CABLE SPLICER, 2ND SHIFT 02/22/2021 05/31/2021* $53.630 $12.760 $8.750 L $0.000 B $1.760 $7.970 O 8.0 $87.340 $115.390 P $115.390 P $143.440 N HolidaysScope of WorkTravel & Subsistence Shift Provisions
#ELECTRICIAN: CABLE SPLICER, 3RD SHIFT 02/22/2021 05/31/2021* $58.630 $12.760 $8.750 L $0.000 B $1.760 $7.970 O 8.0 $92.570 $123.230 P $123.230 P $153.900 N HolidaysScope of WorkTravel & Subsistence Shift Provisions
#GLAZIER GLAZIER (2ND SHIFT) Q 02/22/2021 06/30/2021* $45.610 A $10.550 $19.720 R $0.000 $1.090 $0.380 S 7.5 T $77.350 $122.960 $122.960 $122.960 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#GLAZIER GLAZIER (3RD SHIFT) Q 02/22/2021 06/30/2021* $47.690 A $10.550 $19.720 R $0.000 $1.090 $0.380 S 7.5 T $79.430 $127.120 $127.120 $127.120 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#MARBLE FINISHER MARBLE FINISHER (2ND SHIFT) U 08/22/2020 07/31/2021** $41.530 V $10.750 $5.340 $0.000 J $0.450 $0.870 8.0 $58.940 $79.710 W $100.470 $100.470 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#MARBLE MASON MARBLE MASON (2ND SHIFT) U 08/22/2020 07/31/2021** $57.300 V $10.750 $16.120 $0.000 J $0.800 $1.190 8.0 $86.160 $114.810 W $143.460 $143.460 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#PAINTER PAINTER (SPECIAL SHIFT) X 02/22/2021 12/31/2021** $41.210 H $10.550 $9.830 Y $0.000 J $0.780 $0.410 8.0 C $62.780 $83.390 Z $83.390 Z $103.990 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#PAINTER INDUSTRIAL PAINTER (SPECIAL SHIFT) AA 02/22/2021 12/31/2021** $43.510 H $10.550 $9.830 Y $0.000 J $0.780 $0.410 8.0 C $65.080 $86.830 Z $86.830 Z $108.590 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#PAINTER BRIDGE PAINTER (SPECIAL SHIFT) AB 02/22/2021 12/31/2021** $45.810 H $10.550 $9.830 Y $0.000 J $0.780 $0.410 8.0 C $67.380 $90.290 Z $90.290 Z $113.190 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#PLUMBER: PLUMBER, STEAMFITTER (2ND AND 3RD SHIFT) AC 02/22/2021 06/30/2021** $62.530 A $12.150 $12.150 AD $0.000 B $1.100 $0.700 8.0 $88.630 $119.890 G $119.890 AE $151.160 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#PLUMBER: PLUMBER (FOR TOTAL PLUMBING JOBS $150,000 OR UNDER) (2ND AND 3RD SHIFT) AC 02/22/2021 06/30/2021* $49.540 A $10.020 $8.900 $0.000 B $1.100 $0.700 8.0 $70.260 $95.030 G $95.030 AF $119.800 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#SHEET METAL WORKER SHEET METAL WORKER (2ND SHIFT) 08/22/2020 06/30/2021* $51.260 A $14.750 $24.070 AG $0.000 B $1.340 $0.820 7.5 AH $92.240 $119.870 G $119.870 G $147.500 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#SHEET METAL WORKER SHEET METAL WORKER (3RD SHIFT) 08/22/2020 06/30/2021* $53.590 A $14.750 $24.070 AG $0.000 B $1.340 $0.820 7.0 AI $94.570 $123.370 G $123.370 G $152.160 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#TERRAZZO FINISHER TERRAZZO FINISHER, 2ND SHIFT AJ 08/22/2020 06/30/2021** $43.670 AK $10.750 $5.870 $0.000 B $0.800 $1.000 8.0 $62.090 $81.590 AL $81.590 AL $101.090 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#TERRAZZO FINISHER TERRAZZO FINISHER, 3RD SHIFT AJ 08/22/2020 06/30/2021** $43.670 AK $10.750 $5.870 $0.000 B $0.800 $1.000 8.0 $62.090 $81.590 AL $81.590 AL $101.090 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#TERRAZZO WORKER TERRAZZO WORKER, 2ND SHIFT AJ 08/22/2020 06/30/2021** $58.660 AK $10.750 $15.370 $0.000 B $0.800 $1.220 8.0 $86.800 $113.050 AL $113.050 AL $139.300 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#TERRAZZO WORKER TERRAZZO WORKER, 3RD SHIFT AJ 08/22/2020 06/30/2021** $58.660 AK $10.750 $15.370 $0.000 B $0.800 $1.220 8.0 $86.800 $113.050 AL $113.050 AL $139.300 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#TILE FINISHER TILE FINISHER, 2ND SHIFT 08/22/2020 03/31/2021* $32.370 AM $10.310 $5.490 $1.000 $0.790 $1.030 8.0 $50.990 $64.680 $64.680 C $78.360 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#TILE FINISHER TILE FINISHER - RED CIRCLED FINISHER, 2ND SHIFT 08/22/2020 03/31/2021* $37.430 AM $10.310 $6.090 $1.300 $0.790 $1.090 8.0 $57.010 $73.230 $73.230 C $89.440 HolidaysScope of WorkTravel & Subsistence Shift Provisions
#TILE SETTER TILE SETTER, 2ND SHIFT 08/22/2020 03/31/2021* $50.780 AM $10.310 $7.800 $2.500 $1.120 $1.700 8.0 $74.210 $96.600 $96.600 C $118.990 HolidaysScope of WorkTravel & Subsistence Shift Provisions

Go to increase page

FOOTNOTES

*
EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
#
INDICATES AN APPRENTICEABLE CRAFT. THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @ HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.
&
THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.
A
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
B
INCLUDED IN STRAIGHT-TIME HOURLY RATE.
C
SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
D
RATE APPLIES TO THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
E
VACATION IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER
F
INCLUDES AMOUNT FOR INDUSTRY PROMOTION FUND, INTERNATIONAL MASONRY INSTITUTE, LABOR MANAGEMENT COOPERATION COMMITTEE, AND VACATION TRUST FUND.
G
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
H
INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
I
RATE APPLIES TO FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWNDURING THE NORMAL WORK WEEK DUE TO INCLEMENT WEATHER.
J
INCLUDED IN BASIC HOURLY RATE.
K
DESIGNATED DAYS OFF SHALL BE PAID AT TIME AND ONE-HALF (1 1/2X). PLEASE REFER TO THE HOLIDAY PROVISION FOR A LIST OF DESIGNATED DAYS OFF.
L
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD.
M
IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE ADMINISTRATIVE MAINTENANCE FUND.
N
DISREGARD THIS RATE. USE THE SUNDAY AND HOLIDAY NON-SHIFT DIFFERENTIAL RATE FOR THIS CLASSIFICATION AS PUBLISHED IN THE DIRECTOR'S GENERAL PREVAILING WAGE DETERMINATIONS.
O
IN ADDITION, AN AMOUNT EQUAL TO 1.6% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE CONTRACT ADMINISTRATION FUND.
P
DISREGARD THIS RATE. USE THE DAILY OVERTIME NON-SHIFT DIFFERENTIAL RATE FOR THIS CLASSIFICATION AS PUBLISHED IN THE DIRECTOR'S GENERAL PREVAILING WAGE DETERMINATIONS.
Q
CERTIFIED MANIPULATOR WORK SHALL RECEIVE $1.25 PER HOUR ABOVE THE BASIC WAGE RATE
R
INCLUDES AN AMOUNT PER HOUR WORKED FOR IUPAT, IARP, AND RETIREE PENSION.
S
INCLUDES AMOUNTS FOR INDUSTRY FUND, WORK PRESERVATION FUND, AND LABOR MANAGEMENT COOPERATION INITIATIVE
T
8 HOURS PAY FOR 7.5 HOURS WORKED AT THE STRAIGHT TIME BASIC HOURLY RATE
U
EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFFOLD SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.
V
INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.
W
RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
X
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: EXOTIC MATERIALS ($1.25 PER HOUR) AND LEAD ABATEMENT/REMOVAL ($1.00 PER HOUR). EMPLOYEES WORKING ON COMMERCIAL PROJECTS SHALL ALSO BE ENTITLED TO HIGH TIME PREMIUM WHENEVER THE WORK PERFORMED REQUIRES A SWINGING AND/OR PLATFORM SUSPENSION SYSTEM. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET ABOVE GROUND OR WATER LEVEL AND $6.00 PER HOUR WHEN WORKING OVER 180 FEET. SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
Y
INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
Z
RATE APPLIES TO FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY, FIRST 12 HOURS WORKED ON SATURDAYS AND ALL HOURS WORKED ON DESIGNATED DAYS OFF. ALL OTHER OVERTIME IS PAID AT SUNDAY/HOLIDAY RATE.
AA
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: METALIZING AND THERMAL SPRAY ($4.00 PER HOUR). EMPLOYEES SHALL ALSO BE ENTITLED TO HIGH TIME PREMIUM PAY WHENEVER THE WORK PERFORMED REQUIRES PERSONAL FALL RESTRAINTS TO BE WORN BY THE EMPLOYEE. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET ABOVE GROUND OR WATER LEVEL AND $6.00 PER HOUR WHEN WORKING OVER 180 FEET. SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
AB
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: METALIZING AND THERMAL SPRAY ($4.00 PER HOUR). SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
AC
RATE APPLIES TO THE PORTION OF THE COUNTY NORTH OF SUTTER CREEK.
AD
PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AE
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
AF
RATE APPLIES TO THE FIRST 10 HOURS ON SATURDAY IF HOURS WORKED ARE UNDER 40 HOURS PER WEEK. FOR WORK OVER 40 HOURS IN ONE WEEK, THE SATURDAY RATE IS 1.5X THE BASIC HOURLY RATE (NO FRINGE BENEFITS ARE INCLUDED). ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
AG
INCLUDES AN AMOUNT FOR PENSION WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AH
EIGHT (8) HOURS PAY FOR SEVEN AND ONE-HALF (7.5) HOURS WORKED
AI
EIGHT (8) HOURS PAY FOR SEVEN (7) HOURS WORKED
AJ
THE RATIO OF TERRAZZO FINISHER HOURS TO TERRAZZO WORKER HOURS SHALL NOT EXCEED TWO (2) TO ONE (1).
AK
INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
AL
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AM
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF, WHICH IS FACTORED IN THE OVERTIME RATES. INCLUDES AN AMOUNT OF PREMIUM RATE PER HOUR ABOVE THE REGULAR STRAIGHT-TIME RATE, WHICH IS NOT FACTORED IN THE OVERTIME RATES. ANY EMPLOYEE WORKING UNDERGROUND SHALL RECEIVE $1.00 PER HOUR IN ADDITION TO REGULAR WAGES.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH THE DIRECTOR OF INDUSTRIAL RELATIONS. IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE. YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

TRAVEL AND/OR SUBSISTENCE: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH WORKER TO EXECUTE THE WORK. YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

Return to main page