GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: SANTA CLARA COUNTY

DETERMINATION: STC-2021-1

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE BASIC HOURLY RATE BASIC HOURLY RATE FOOTNOTE HEALTH AND WELFARE HEALTH AND WELFARE FOOTNOTE PENSION PENSION FOOTNOTE VACATION/ HOLIDAY VACATION/ HOLIDAY FOOTNOTE TRAINING TRAINING FOOTNOTE OTHER PAYMENTS OTHER PAYMENTS FOOTNOTE HOURS HOURS FOOTNOTE STRAIGHT-TIME TOTAL HOURLY RATE DAILY OVERTIME HOURLY RATE DAILY OVERTIME HOURLY RATE FOOTNOTE SATURDAY OVERTIME HOURLY RATE SATURDAY OVERTIME HOURLY RATE FOOTNOTE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE FOOTNOTE HOLIDAY PROVISIONS SCOPE OF WORK PROVISIONS TRAVEL & SUBSISTENCE PROVISIONS
#BRICKLAYER, BLOCKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON 08/22/2020 04/30/2021** $46.420 A $10.750 $10.420 $3.000 B $0.800 $1.860 C 8.0 D $73.250 $97.960 E $97.960 E $122.670 HolidaysScope of WorkTravel & Subsistence
#BRICKLAYER, BLOCKLAYER: POINTER, CLEANER, CAULKER, WATERPROOFER 08/22/2020 06/30/2021** $52.750 A $10.750 $12.970 $0.000 F $1.580 $0.430 8.0 D $78.480 $104.860 $104.860 G $131.230 HolidaysScope of WorkTravel & Subsistence
#BRICK TENDER 08/22/2020 06/30/2021** $35.180 H $9.000 $11.770 $0.000 F $0.450 $0.300 8.0 $56.700 $74.290 I $74.290 I $91.880 HolidaysScope of WorkTravel & Subsistence
#CARPET, LINOLEUM, SOFT FLOOR LAYER 02/22/2021 12/31/2021** $53.050 A $10.550 $17.330 $0.000 J $1.050 $0.340 8.0 $82.320 $108.850 K $108.850 K $135.370 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, FLOOR COVERING HANDLER AFTER 3 YEARS 02/22/2021 12/31/2021** $26.500 A $10.550 $8.670 $0.000 J $0.050 $0.340 8.0 $46.110 $59.360 K $59.360 K $72.610 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, FLOOR COVERING HANDLER LESS THAN 3 YEARS 02/22/2021 12/31/2021** $21.190 A $10.550 $6.930 $0.000 J $0.050 $0.340 8.0 $39.060 $49.650 K $49.650 K $60.250 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, FLOOR COVERING HANDLER TRAINEE, FIRST 3 MONTHS 02/22/2021 12/31/2021** $16.940 A $10.550 $5.550 $0.000 J $0.050 $0.340 8.0 $33.430 $41.900 K $41.900 K $50.370 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, FLOOR COVERING HANDLER TRAINEE, SECOND 3 MONTHS 02/22/2021 12/31/2021** $19.070 A $10.550 $6.230 $0.000 J $0.050 $0.340 8.0 $36.240 $45.780 K $45.780 K $55.310 HolidaysScope of WorkTravel & Subsistence
#ELECTRICIAN: COMM & SYSTEM INSTALLER 02/22/2021 11/30/2021** $45.500 $11.900 $8.150 L $0.000 $1.100 $0.260 M 8.0 $68.510 $92.050 N $92.050 N $115.600 HolidaysScope of WorkTravel & Subsistence
#ELECTRICIAN: COMM & SYSTEM TECH. 02/22/2021 11/30/2021** $52.330 $11.900 $8.150 L $0.000 $1.100 $0.260 M 8.0 $75.570 $102.650 N $102.650 N $129.730 HolidaysScope of WorkTravel & Subsistence
#ELECTRICIAN: INSIDE WIREMAN, TECHNICIAN 08/22/2020 05/31/2021* $71.520 O $15.800 $20.900 P $0.000 $1.500 $0.600 Q 8.0 $112.470 $149.300 R $149.300 R $186.130 HolidaysScope of WorkTravel & Subsistence
#ELECTRICIAN: CABLE SPLICER 08/22/2020 05/31/2021* $82.250 O $15.800 $20.900 P $0.000 $1.500 $0.650 Q 8.0 $123.570 $165.930 R $165.930 R $208.290 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: MATERIAL HANDLER S 08/22/2020 07/31/2021* $34.270 $11.450 $3.550 L $0.000 $0.000 $0.280 8.0 $50.580 $68.230 $68.230 $85.880 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: MATERIAL HANDLER - FOURTH SIX MONTHS S 08/22/2020 07/31/2021* $29.130 $11.450 $3.550 L $0.000 $0.000 $0.260 8.0 $45.260 $60.270 $60.270 $75.270 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: MATERIAL HANDLER - THIRD SIX MONTHS S 08/22/2020 07/31/2021* $25.700 $11.450 $3.550 L $0.000 $0.000 $0.240 8.0 $41.710 $54.950 $54.950 $68.180 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: MATERIAL HANDLER - SECOND SIX MONTHS S 08/22/2020 07/31/2021* $22.280 $11.450 $3.550 L $0.000 $0.000 $0.220 8.0 $38.170 $49.640 $49.640 $61.120 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: MATERIAL HANDLER - FIRST SIX MONTHS S 08/22/2020 07/31/2021* $20.560 $0.000 $0.000 L $0.000 $0.000 $0.210 8.0 $21.390 $31.980 $31.980 $42.560 HolidaysScope of WorkTravel & Subsistence
#FIELD SURVEYOR: CHIEF OF PARTY T 02/22/2021 02/28/2022* $49.630 $13.880 $12.010 U $4.870 V $1.210 $0.190 8.0 $81.790 $106.600 W $106.600 W $131.420 HolidaysScope of WorkTravel & Subsistence
#FIELD SURVEYOR: INSTRUMENTMAN T 02/22/2021 02/28/2022* $46.540 $13.880 $12.010 U $4.870 V $1.210 $0.190 8.0 $78.700 $101.970 W $101.970 W $125.240 HolidaysScope of WorkTravel & Subsistence
#FIELD SURVEYOR: CHAINMAN/RODMAN T 02/22/2021 02/28/2022* $43.660 $13.880 $12.010 U $4.870 V $1.210 $0.190 8.0 $75.820 $97.650 W $97.650 W $119.480 HolidaysScope of WorkTravel & Subsistence
#GLAZIER X 02/22/2021 06/30/2021* $53.020 A $10.550 $19.550 Y $0.000 $1.050 $0.380 Z 8.0 $84.550 $111.060 AA $137.570 $137.570 HolidaysScope of WorkTravel & Subsistence
#MARBLE FINISHER AB 08/22/2020 07/31/2021** $36.530 AC $10.750 $5.340 $0.000 J $0.450 $0.870 8.0 $53.940 $72.210 AD $90.470 $90.470 HolidaysScope of WorkTravel & Subsistence
#MARBLE MASON AB 08/22/2020 07/31/2021** $51.300 AC $10.750 $16.120 $0.000 J $0.800 $1.190 8.0 $80.160 $105.810 AD $131.460 $131.460 HolidaysScope of WorkTravel & Subsistence
#PAINTER AE 02/22/2021 12/31/2021** $45.170 H $10.550 $14.070 U $0.000 J $0.860 $0.380 8.0 D $71.030 $93.610 AF $93.610 AF $116.200 HolidaysScope of WorkTravel & Subsistence
#PAINTER INDUSTRIAL PAINTER AG 02/22/2021 12/31/2021** $47.170 H $10.550 $14.070 U $0.000 J $0.860 $0.380 8.0 D $73.030 $96.610 AF $96.610 AF $120.200 HolidaysScope of WorkTravel & Subsistence
#PAINTER BRIDGE PAINTER AH 02/22/2021 12/31/2021** $49.170 H $10.550 $14.070 U $0.000 J $0.860 $0.380 8.0 D $75.030 $99.610 AF $99.610 AF $124.200 HolidaysScope of WorkTravel & Subsistence
#PAINTER: TAPER 02/22/2021 06/30/2021** $53.110 AI $10.550 $16.980 $0.000 J $0.960 $0.640 8.0 $82.240 $108.790 AJ $108.790 AJ $135.350 AK HolidaysScope of WorkTravel & Subsistence
#PLASTERER 08/22/2020 06/30/2021* $40.110 AL $13.780 $17.340 $3.500 $1.230 $1.200 8.0 $77.160 $96.150 $96.150 AM $115.130 HolidaysScope of WorkTravel & Subsistence
#PLASTER TENDER 08/22/2020 06/30/2021** $35.480 $9.000 $13.280 $4.810 $0.500 $0.450 8.0 $63.520 $81.260 K $81.260 K $99.000 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: UNDERGROUND UTILITY PIPEFITTER 02/22/2021 06/30/2021** $29.900 $11.650 $3.000 AN $1.250 $0.400 $0.800 8.0 $47.000 $61.950 $61.950 D $76.900 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: LANDSCAPE PIPEFITTER 02/22/2021 06/30/2021** $29.900 $11.650 $3.000 AN $1.250 $0.400 $0.800 8.0 $47.000 $61.950 $61.950 D $76.900 HolidaysScope of WorkTravel & Subsistence
PLUMBER: UNDERGROUND UTILITY ASSISTANT JOURNEYMAN AO 02/22/2021 06/30/2021** $17.900 $11.650 $3.000 AN $1.250 $0.400 $0.800 8.0 $35.000 $43.950 $43.950 D $52.900 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE ASSISTANT JOURNEYMAN AP 02/22/2021 06/30/2021** $17.900 $11.650 $3.000 AN $1.250 $0.400 $0.800 8.0 $35.000 $43.950 $43.950 D $52.900 HolidaysScope of WorkTravel & Subsistence
PLUMBER: UNDERGROUND UTILITY TRADESMAN AQ 02/22/2021 06/30/2021** $14.900 $11.650 $3.000 AN $1.250 $0.400 $0.800 8.0 $32.000 $39.450 $39.450 D $46.900 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE TRADESMAN I AR 02/22/2021 06/30/2021** $14.900 $11.650 $0.000 AN $1.250 $0.400 $0.800 8.0 $29.000 $36.450 $36.450 D $43.900 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE TRADESMAN II AR 02/22/2021 06/30/2021** $14.900 $11.650 $3.000 AN $1.250 $0.400 $0.800 8.0 $32.000 $39.450 $39.450 D $46.900 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: PLUMBER, STEAMFITTER, REFRIGERATION FITTER (HVAC) 08/22/2020 06/30/2021* $66.660 A $16.960 AS $25.420 AT $0.000 F $1.950 $0.900 AU 8.0 $111.890 $149.970 E $149.970 E $188.050 HolidaysScope of WorkTravel & Subsistence
PLUMBER: CONSTRUCTION TRADESMAN (YEAR 2) 08/22/2020 06/30/2021* $22.980 A $10.700 AN $0.500 AN $0.000 F $0.000 $0.250 AV 8.0 $34.430 $45.920 E $45.920 E $57.410 HolidaysScope of WorkTravel & Subsistence
PLUMBER: CONSTRUCTION TRADESMAN (YEAR 3) 08/22/2020 06/30/2021* $28.580 A $10.700 AN $0.500 AN $0.000 F $0.000 $0.250 AV 8.0 $40.030 $54.330 E $54.330 E $68.610 HolidaysScope of WorkTravel & Subsistence
PLUMBER: CONSTRUCTION TRADESMAN (YEAR 4) 08/22/2020 06/30/2021* $29.960 A $10.700 AN $0.500 AN $0.000 F $0.000 $0.250 AV 8.0 $41.410 $56.390 E $56.390 E $71.370 HolidaysScope of WorkTravel & Subsistence
PLUMBER: CONSTRUCTION TRADESMAN (YEAR 5) 08/22/2020 06/30/2021* $32.950 A $10.700 AN $2.250 AN $0.000 F $0.000 $0.250 AV 8.0 $46.150 $62.630 E $62.630 E $79.100 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: SERVICE AND REPAIR 08/22/2020 06/30/2021* $66.660 A $16.960 AS $25.420 AT $0.000 F $1.950 $0.900 AU 8.0 $111.890 $149.970 $149.970 AW $149.970 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: SPRINKLER FITTER (FIRE PROTECTION AND FIRE CONTROL SYSTEMS) 02/22/2021 08/01/2021** $67.990 A $12.000 $20.500 $0.000 F $1.850 $0.300 8.0 $102.640 $136.630 E $136.630 E $170.630 HolidaysScope of WorkTravel & Subsistence
#ROOFER ROOFER, KETTLEMAN 08/22/2020 07/31/2021* $43.290 AX $10.610 $9.030 $3.250 $1.050 $0.440 8.0 $67.670 $88.600 AY $88.600 AZ $109.520 HolidaysScope of WorkTravel & Subsistence
#ROOFER HELPER 08/22/2020 07/31/2021* $39.110 AX $10.610 $9.030 $3.250 $1.050 $0.440 8.0 $63.490 $82.330 AY $82.330 AZ $101.160 HolidaysScope of WorkTravel & Subsistence
#ROOFER KETTLEMAN (2 KETTLES) 08/22/2020 07/31/2021* $45.290 AX $10.610 $9.030 $3.250 $1.050 $0.440 8.0 $69.670 $91.600 AY $91.600 AZ $113.520 HolidaysScope of WorkTravel & Subsistence
#ROOFER BITUMASTIC, ENAMELER, COAL TAR, PITCH AND MASTIC WORKER 08/22/2020 07/31/2021* $45.290 AX $10.610 $9.030 $3.250 $1.050 $0.440 8.0 $69.670 $91.600 AY $91.600 AZ $113.520 HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER 08/22/2020 06/27/2021** $64.060 H $14.850 BA $29.740 BB $0.000 F $1.530 $0.710 8.0 $110.890 $146.480 BC $146.480 BC $182.070 HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS 08/22/2020 06/27/2021** $55.920 H $14.850 BA $28.200 BB $0.000 F $1.530 $0.710 8.0 $101.210 $132.270 BC $132.270 BC $163.340 HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER SERVICE MECHANIC (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) 08/22/2020 06/27/2021** $43.950 H $14.250 BD $15.480 BB $0.000 F $1.430 $0.710 8.0 $75.820 $99.050 BE $99.050 BE $122.270 HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER SERVICE TECHNICIAN (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) 08/22/2020 06/27/2021** $39.580 H $14.250 BD $10.210 BB $0.000 F $1.430 $0.710 8.0 $66.180 $86.770 BE $86.770 BE $107.360 HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER AIR CONDITIONING SPECIALIST (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) 08/22/2020 06/27/2021** $34.680 H $14.250 BD $4.910 BB $0.000 F $1.410 $0.710 8.0 $55.960 $73.840 BC $73.840 BC $91.720 HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER AIR CONDITIONING PRO (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) 02/22/2021 06/27/2021** $40.820 H $14.250 BA $10.490 BB $0.000 F $1.410 $0.710 8.0 $67.680 $88.840 BC $88.840 BC $110.000 HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER METAL DECK & SIDING 08/22/2020 06/30/2021** $44.450 H $14.830 AN $20.400 BF $0.000 F $0.320 BG $0.000 8.0 $80.000 $103.230 BC $103.230 BC $126.450 HolidaysScope of WorkTravel & Subsistence
#TERRAZZO FINISHER BH 08/22/2020 06/30/2021** $38.670 BI $10.750 $5.870 $0.000 F $0.800 $1.000 8.0 $57.090 $74.090 BC $74.090 BC $91.090 HolidaysScope of WorkTravel & Subsistence
#TERRAZZO WORKER BH 08/22/2020 06/30/2021** $50.660 BI $10.750 $15.370 $0.000 F $0.800 $1.220 8.0 $78.800 $101.050 BC $101.050 BC $123.300 HolidaysScope of WorkTravel & Subsistence
#TILE FINISHER 08/22/2020 03/31/2021* $30.220 BJ $10.310 $5.300 $1.000 $0.820 $1.060 8.0 $48.710 $63.820 $63.820 D $78.930 HolidaysScope of WorkTravel & Subsistence
#TILE FINISHER RED CIRCLED FINISHER 08/22/2020 03/31/2021* $36.100 BJ $10.310 $6.080 $1.500 $0.820 $1.130 8.0 $55.940 $73.990 $73.990 D $92.040 HolidaysScope of WorkTravel & Subsistence
#TILE SETTER 08/22/2020 03/31/2021* $49.530 BJ $10.310 $7.800 $2.500 $1.170 $1.750 8.0 $73.060 $97.820 $97.820 D $122.590 HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER: 02/22/2021 03/31/2021* $14.000 $3.200 $0.780 $0.630 BK $0.000 $0.000 8.0 $18.610 $25.610 BL $25.610 BL $25.610 BL HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER: PUMP INSTALLER 02/22/2021 03/31/2021* $14.000 $3.200 $0.780 $0.630 BK $0.000 $0.000 8.0 $18.610 $25.610 BL $25.610 BL $25.610 BL HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER: HELPER 02/22/2021 03/31/2021* $14.000 $3.200 $0.780 $0.520 BM $0.000 $0.000 8.0 $18.500 $25.500 BL $25.500 BL $25.500 BL HolidaysScope of WorkTravel & Subsistence

Go to increase page

FOOTNOTES

*
EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
#
INDICATES AN APPRENTICEABLE CRAFT. THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @ HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.
&
THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.
A
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
B
VACATION IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER
C
INCLUDES AMOUNT FOR INDUSTRY PROMOTION FUND, INTERNATIONAL MASONRY INSTITUTE, LABOR MANAGEMENT COOPERATION COMMITTEE, AND VACATION TRUST FUND.
D
SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
E
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
F
INCLUDED IN STRAIGHT-TIME HOURLY RATE.
G
RATE APPLIES TO THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
H
INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
I
RATE APPLIES TO FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWNDURING THE NORMAL WORK WEEK DUE TO INCLEMENT WEATHER.
J
INCLUDED IN BASIC HOURLY RATE.
K
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
L
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD.
M
IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES.
N
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
O
INCLUDES AMOUNT WITHHELD FOR WORKING DUES.
P
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
Q
INCLUDES AMOUNT EQUAL TO 0.5% OF THE HOURLY RATE FOR THE ADMINISTRATIVE MAINTENANCE FUND AND THE REMAINING AMOUNT IS FOR THE JOINT ELECTRICAL INDUSTRY FUND.
R
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS UP TO A MAXIMUM OF 10 HOURS IN ANY ONE WEEK OR THE FIRST 8 HOURS WORKED ON SATURDAY IF NO OVERTIME HAS BEEN WORKED DURING THE WEEK. IF OVERTIME IS WORKED MONDAY THROUGH FRIDAY, SUBTRACT THAT AMOUNT OF TIME FROM THE TIME ALLOWED AT TIME AND ONE HALF (1 1/2) ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY/HOLIDAY RATE.
S
THE MATERIAL HANDLER MAY BE UTILIZED IN CONJUNCTION WITH BOTH INSIDE AND LINE PROJECTS. THE RATIO OF MATERIAL HANDLER TO JOURNEYMEN SHALL BE ONE (1) MATERIAL HANDLER TO THREE (3) JOURNEYMEN.
T
ALL CREWS, WITHOUT CONSIDERATION TO THE NUMBER OF INDIVIDUALS IN THE CREW, SHALL INCLUDE A CHIEF OF PARTY. A CREW CONSISTS OF ONE (1) OR MORE EMPLOYEES PERFORMING FIELD AND CONSTRUCTION SURVEY WORK.
U
INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
V
INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.
W
RATE APPLIES TO DAILY OVERTIME HOURS UP TO AND INCLUDING 12 HOURS WORKED IN A WORKDAY OR OTHER OVERTIME HOURS BEYOND 40 HOURS IN A WORKWEEK. ALL OTHER OVERTIME IS PAID AT THE SUNDAY/HOLIDAY RATE. IN THE EVENT THAT THERE ARE LESS THAN 40 HOURS WORKED MONDAY THROUGH FRIDAY, THEN THE BALANCE OF HOURS WORKED UP TO AND INCLUDING 40 HOURS FOR THE WORKWEEK, OR UP TO 8 HOURS FOR THE WORKDAY, MAY BE WORKED ON SATURDAY AT THE STRAIGHT-TIME RATE.
X
CERTIFIED MANIPULATOR WORK SHALL RECEIVE $1.25 PER HOUR ABOVE THE BASIC WAGE RATE
Y
INCLUDES AN AMOUNT PER HOUR WORKED FOR IUPAT, IARP, AND RETIREE PENSION.
Z
INCLUDES AMOUNTS FOR INDUSTRY FUND, WORK PRESERVATION FUND, AND LABOR MANAGEMENT COOPERATION INITIATIVE
AA
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND FIRST 8 HOURS WORKED ON DESIGNATED DAYS OFF; ALL OTHER TIME IS PAID AT THE SATURDAY, SUNDAY AND HOLIDAY OVERTIME RATE.
AB
EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFFOLD SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.
AC
INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.
AD
RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
AE
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: WALLCOVERING ($2.00 PER HOUR), EXOTIC MATERIALS ($1.25 PER HOUR) AND LEAD ABATEMENT/REMOVAL ($1.00 PER HOUR). EMPLOYEES SHALL ALSO BE ENTITLED TO HIGH TIME PREMIUM PAY WHENEVER THE WORK PERFORMED REQUIRES PERSONAL FALL RESTRAINTS TO BE WORN BY THE EMPLOYEE. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $2.00 PER HOUR ABOVE BASIC HOURLY RATE WHEN WORKING OVER 50 FEET ABOVE GROUND OR WATER LEVEL, $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET AND $6.00 PER HOUR WHEN WORKING OVER 180 FEET. SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
AF
RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 12 HOURS WORKED ON SATURDAYS AND DESIGNATED DAYS OFF. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
AG
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: METALIZING AND THERMAL SPRAY ($4.00 PER HOUR). EMPLOYEES SHALL ALSO BE ENTITLED TO HIGH TIME PREMIUM PAY WHENEVER THE WORK PERFORMED REQUIRES PERSONAL FALL RESTRAINTS TO BE WORN BY THE EMPLOYEE. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET ABOVE GROUND OR WATER LEVEL AND $6.00 PER HOUR WHEN WORKING OVER 180 FEET. SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
AH
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: METALIZING AND THERMAL SPRAY ($4.00 PER HOUR). SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
AI
INCLUDES AMOUNTS FOR VACATION AND DUES CHECK OFF
AJ
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
AK
DESIGNATED DAYS OFF SHALL BE PAID AT THE SATURDAY OVERTIME RATE; PLEASE REFER TO THE HOLIDAY PROVISIONS FOR A LIST OF DESIGNATED DAYS OFF.
AL
INCLUDES AN AMOUNT WITHHELD FOR DUES CHECKOFF WHICH IS NOT FACTORED IN OVERTIME AND HOLIDAY WAGE RATES. EMPLOYEES WORKING ON AND BEHIND PLASTER GUNS SHALL RECEIVE AN ADDITIONAL $5.00 PER DAY ABOVE THE WAGE RATE.
AM
RATE APPLIES TO THE FIRST 8 HOURS WORKED; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AN
PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AO
THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE.
AP
THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE. THIS AGREEMENT MAY BE USED TO COVER MAINTENANCE AND PLANT ESTABLISHMENT. PLANT ESTABLISHMENT SHALL BE WORK COVERED BY THIS AGREEMENT. THIS WORK MAY BE PERFORMED EXCLUSIVELY BY ALL CLASSIFICATIONS OUTLINED IN THIS AGREEMENT WITHOUT THE SUPERVISION OF A JOURNEYMAN, EXCEPT FOR APPRENTICES WHO REQUIRE THE SUPERVISION OF A JOURNEYMAN.
AQ
THERE SHALL BE NO MORE THAN THREE TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON EACH JOBSITE.
AR
THERE SHALL BE NO MORE THAN FOUR TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON EACH JOBSITE. THIS AGREEMENT MAY BE USED TO COVER MAINTENANCE AND PLANT ESTABLISHMENT. PLANT ESTABLISHMENT SHALL BE WORK COVERED BY THIS AGREEMENT. THIS WORK MAY BE PERFORMED EXCLUSIVELY BY ALL CLASSIFICATIONS OUTLINED IN THIS AGREEMENT WITHOUT THE SUPERVISION OF A JOURNEYMAN, EXCEPT FOR APPRENTICES WHO REQUIRE THE SUPERVISION OF A JOURNEYMAN
AS
INCLUDES AN AMOUNT FOR HEALTH AND WELFARE EXTENDED RESERVE WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AT
INCLUDES AN AMOUNT FOR 401A-PART B PENSION WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AU
$0.50 TO SUPPLEMENTAL UNEMPLOYMENT.
AV
AMOUNT IS FOR CONTRACT ADMINISTRATION
AW
SATURDAY MAY BE PAID AT STRAIGHT TIME IF THE WORK WEEK IS TUESDAY THROUGH SATURDAY.
AX
INCLUDES AN AMOUNT WITHHELD FOR DUES CHECK OFF WHICH IS NOT FACTORED IN OVERTIME AND HOLIDAY WAGE RATES.
AY
RATE APPLIES TO THE FIRST 2 OVERTIME HOURS ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AZ
IN THE EVENT THAT CONDITIONS ON ONE OR MORE DAYS DURING THE REGULAR WORK WEEK PREVENT EMPLOYEES FROM WORKING ON SCHEDULED WORK DURING SUCH WEEK, WORK MAY BE PERFORMED ON SATURDAY AT STRAIGHT TIME RATES OF PAY.
BA
INCLUDES SMOHIT AND SHC. EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
BB
INCLUDES AN AMOUNT FOR PENSION WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
BC
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
BD
INCLUDES SHC. EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
BE
RATE APPLIES TO FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY DURING THE EMPLOYEES NORMAL WORKING HOURS. ALL OTHER OVERTIME HOURS SHALL BE PAID AT THE SUNDAY AND HOLIDAY DOUBLE TIME RATE.
BF
INCLUDES AN AMOUNT FOR PENSION FACTORED AT THE OVERTIME MULTIPLIER RATE.
BG
INCLUDES $0.05 FOR SCHOLAR FUND.
BH
THE RATIO OF TERRAZZO FINISHER HOURS TO TERRAZZO WORKER HOURS SHALL NOT EXCEED TWO (2) TO ONE (1).
BI
INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
BJ
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF, WHICH IS FACTORED IN THE OVERTIME RATES. ANY EMPLOYEE WORKING UNDERGROUND SHALL RECEIVE $1.00 PER HOUR IN ADDITION TO REGULAR WAGES.
BK
RATE APPLIES TO FIRST YEAR OF EMPLOYMENT ONLY; $0.88 AFTER 2 YEARS OF EMPLOYMENT.
BL
RATE APPLIES TO ALL TIME WORKED IN EXCESS OF 8 HOURS PER DAY OR 40 HOURS PER WEEK AND FOR ALL HOURS ON SUNDAYS AND HOLIDAYS. RATE DOES NOT INCLUDE ANY ADDITIONAL AMOUNT THAT MAY BE REQUIRED FOR VACATION/HOLIDAY PAYMENT.
BM
RATE APPLIES TO FIRST YEAR OF EMPLOYMENT ONLY; $0.72 AFTER 2 YEARS OF EMPLOYMENT.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH THE DIRECTOR OF INDUSTRIAL RELATIONS. IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE. YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

TRAVEL AND/OR SUBSISTENCE: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH WORKER TO EXECUTE THE WORK. YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

Return to main page