GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: MARIN COUNTY

DETERMINATION: MAR-2021-1

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE BASIC HOURLY RATE BASIC HOURLY RATE FOOTNOTE HEALTH AND WELFARE HEALTH AND WELFARE FOOTNOTE PENSION PENSION FOOTNOTE VACATION/ HOLIDAY VACATION/ HOLIDAY FOOTNOTE TRAINING TRAINING FOOTNOTE OTHER PAYMENTS OTHER PAYMENTS FOOTNOTE HOURS HOURS FOOTNOTE STRAIGHT-TIME TOTAL HOURLY RATE DAILY OVERTIME HOURLY RATE DAILY OVERTIME HOURLY RATE FOOTNOTE SATURDAY OVERTIME HOURLY RATE SATURDAY OVERTIME HOURLY RATE FOOTNOTE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE FOOTNOTE HOLIDAY PROVISIONS SCOPE OF WORK PROVISIONS TRAVEL & SUBSISTENCE PROVISIONS
#BRICKLAYER, BLOCKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON 08/22/2020 04/30/2021** $44.650 A $10.750 $14.460 $3.000 B $0.800 $1.890 C 8.0 D $75.550 $99.380 E $99.380 E $123.200 HolidaysScope of WorkTravel & Subsistence
#BRICKLAYER, BLOCKLAYER: POINTER, CLEANER, CAULKER, WATERPROOFER 08/22/2020 06/30/2021** $52.750 A $10.750 $12.970 $0.000 F $1.580 $0.430 8.0 D $78.480 $104.860 $104.860 G $131.230 HolidaysScope of WorkTravel & Subsistence
#BRICK TENDER 08/22/2020 06/30/2021** $37.140 H $9.000 $11.210 $0.000 F $0.450 $0.300 8.0 $58.100 $76.670 I $76.670 I $95.240 HolidaysScope of WorkTravel & Subsistence
#CARPET, LINOLEUM, SOFT FLOOR LAYER 02/22/2021 12/31/2021** $53.050 A $10.550 $17.330 $0.000 J $1.050 $0.340 8.0 $82.320 $108.850 K $108.850 K $135.370 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, FLOOR COVERING HANDLER AFTER 3 YEARS 02/22/2021 12/31/2021** $26.500 A $10.550 $8.670 $0.000 J $0.050 $0.340 8.0 $46.110 $59.360 K $59.360 K $72.610 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, FLOOR COVERING HANDLER LESS THAN 3 YEARS 02/22/2021 12/31/2021** $21.190 A $10.550 $6.930 $0.000 J $0.050 $0.340 8.0 $39.060 $49.650 K $49.650 K $60.250 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, FLOOR COVERING HANDLER TRAINEE, FIRST 3 MONTHS 02/22/2021 12/31/2021** $16.940 A $10.550 $5.550 $0.000 J $0.050 $0.340 8.0 $33.430 $41.900 K $41.900 K $50.370 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, FLOOR COVERING HANDLER TRAINEE, SECOND 3 MONTHS 02/22/2021 12/31/2021** $19.070 A $10.550 $6.230 $0.000 J $0.050 $0.340 8.0 $36.240 $45.780 K $45.780 K $55.310 HolidaysScope of WorkTravel & Subsistence
#ELECTRICIAN: COMM & SYSTEM INSTALLER 02/22/2021 11/30/2021** $42.110 $11.900 $8.150 L $0.000 $1.100 $0.260 M 8.0 $64.990 $86.780 N $86.780 N $108.580 HolidaysScope of WorkTravel & Subsistence
#ELECTRICIAN: COMM & SYSTEM TECH. 02/22/2021 11/30/2021** $48.430 $11.900 $8.150 L $0.000 $1.100 $0.260 M 8.0 $71.530 $96.590 N $96.590 N $121.660 HolidaysScope of WorkTravel & Subsistence
#ELECTRICIAN: INSIDE WIREMAN 08/22/2020 05/31/2021* $52.400 A $13.500 $8.500 O $0.000 $1.310 $0.310 P 8.0 $77.850 $104.970 Q $104.970 Q $132.080 HolidaysScope of WorkTravel & Subsistence
#ELECTRICIAN: CABLE SPLICER 08/22/2020 05/31/2021* $57.640 A $13.500 $8.500 O $0.000 $1.310 $0.310 P 8.0 $83.280 $113.100 Q $113.100 Q $142.940 HolidaysScope of WorkTravel & Subsistence
#ELECTRICIAN: TUNNEL WIREMAN 08/22/2020 05/31/2021* $52.900 A $13.500 $8.500 O $0.000 $1.310 $0.310 P 8.0 $78.370 $105.750 R $133.120 $133.120 HolidaysScope of WorkTravel & Subsistence
#ELECTRICIAN: TUNNEL CABLE SPLICER 08/22/2020 05/31/2021* $58.140 A $13.500 $8.500 O $0.000 $1.310 $0.310 P 8.0 $83.790 $113.890 R $143.970 $143.970 HolidaysScope of WorkTravel & Subsistence
#FIELD SURVEYOR: CHIEF OF PARTY S 02/22/2021 02/28/2022* $49.630 $13.880 $12.010 T $4.870 U $1.210 $0.190 8.0 $81.790 $106.600 V $106.600 V $131.420 HolidaysScope of WorkTravel & Subsistence
#FIELD SURVEYOR: INSTRUMENTMAN S 02/22/2021 02/28/2022* $46.540 $13.880 $12.010 T $4.870 U $1.210 $0.190 8.0 $78.700 $101.970 V $101.970 V $125.240 HolidaysScope of WorkTravel & Subsistence
#FIELD SURVEYOR: CHAINMAN/RODMAN S 02/22/2021 02/28/2022* $43.660 $13.880 $12.010 T $4.870 U $1.210 $0.190 8.0 $75.820 $97.650 V $97.650 V $119.480 HolidaysScope of WorkTravel & Subsistence
#GLAZIER W 02/22/2021 06/30/2021* $53.020 A $10.550 $19.550 X $0.000 $1.050 $0.380 Y 8.0 $84.550 $111.060 Z $137.570 $137.570 HolidaysScope of WorkTravel & Subsistence
#MARBLE FINISHER AA 08/22/2020 07/31/2021** $36.530 AB $10.750 $5.340 $0.000 J $0.450 $0.870 8.0 $53.940 $72.210 AC $90.470 $90.470 HolidaysScope of WorkTravel & Subsistence
#MARBLE MASON AA 08/22/2020 07/31/2021** $51.300 AB $10.750 $16.120 $0.000 J $0.800 $1.190 8.0 $80.160 $105.810 AC $131.460 $131.460 HolidaysScope of WorkTravel & Subsistence
#PAINTER AD 02/22/2021 12/31/2021** $45.170 H $10.550 $14.070 T $0.000 J $0.860 $0.380 8.0 D $71.030 $93.610 AE $93.610 AE $116.200 HolidaysScope of WorkTravel & Subsistence
#PAINTER INDUSTRIAL PAINTER AF 02/22/2021 12/31/2021** $47.170 H $10.550 $14.070 T $0.000 J $0.860 $0.380 8.0 D $73.030 $96.610 AE $96.610 AE $120.200 HolidaysScope of WorkTravel & Subsistence
#PAINTER BRIDGE PAINTER AG 02/22/2021 12/31/2021** $49.170 H $10.550 $14.070 T $0.000 J $0.860 $0.380 8.0 D $75.030 $99.610 AE $99.610 AE $124.200 HolidaysScope of WorkTravel & Subsistence
#PAINTER: TAPER 02/22/2021 06/30/2021** $53.110 AH $10.550 $16.980 $0.000 J $0.960 $0.640 8.0 $82.240 $108.790 AI $108.790 AI $135.350 AJ HolidaysScope of WorkTravel & Subsistence
#PLASTERER 08/22/2020 06/30/2021* $40.040 AK $13.780 $17.340 $3.500 $1.230 $1.200 8.0 $77.090 $96.040 $96.040 AL $114.990 HolidaysScope of WorkTravel & Subsistence
#PLASTER TENDER 08/22/2020 06/30/2021** $34.270 $9.000 $13.280 $3.470 $0.500 $1.110 AM 8.0 $61.630 $78.760 K $78.760 K $95.900 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: PLUMBER, STEAMFITTER 08/22/2020 06/30/2021** $76.300 AN $17.410 $20.830 $0.000 F $3.600 $2.910 AO 8.0 $121.050 $159.200 AP $159.200 AQ $197.350 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: PLUMBING SERVICE AND REPAIR, LIGHT COMMERCIAL 08/22/2020 06/30/2021** $64.860 AN $16.560 $18.650 $0.000 F $2.340 $1.320 AO 8.0 $103.730 $136.160 AP $136.160 AQ $168.590 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: REFRIGERATION FITTER (HVAC) 08/22/2020 06/30/2021** $76.300 AN $17.410 $20.830 $0.000 F $3.600 $2.910 AO 8.0 $121.050 $159.200 AP $159.200 AQ $197.350 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: AIR CONDITIONING & REFRIGERATION/HVAC - SERVICE WORK 08/22/2020 06/30/2021** $76.300 AN $17.410 $20.830 $0.000 F $3.600 $2.910 AO 8.0 $121.050 $159.200 AP $159.200 AQ $197.350 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: LANDSCAPE/IRRIGATION PIPEFITTER 08/22/2020 06/30/2021** $64.860 A $16.560 $13.190 AR $0.000 F $1.100 $0.790 8.0 $96.500 $128.930 $128.930 AL $161.360 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: UNDERGROUND/UTILITY PIPEFITTER 08/22/2020 06/30/2021** $64.860 A $16.560 $13.190 AR $0.000 F $1.100 $0.790 8.0 $96.500 $128.930 $128.930 AL $161.360 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: SPRINKLER FITTER (FIRE PROTECTION AND FIRE CONTROL SYSTEMS) 02/22/2021 08/01/2021** $67.990 A $12.000 $20.500 $0.000 F $1.850 $0.300 8.0 $102.640 $136.630 E $136.630 E $170.630 HolidaysScope of WorkTravel & Subsistence
#ROOFER 08/22/2020 07/31/2021** $40.520 $11.050 $7.500 $4.100 $0.750 $0.700 8.0 $64.620 $84.880 K $84.880 AS $105.140 HolidaysScope of WorkTravel & Subsistence
#ROOFER BITUMASTIC, ENAMELER, PIPE WRAPPER, COAL TAR PITCH BUILD-UP 08/22/2020 07/31/2021** $42.520 $11.050 $7.500 $4.100 $0.750 $0.700 8.0 $66.620 $87.880 K $87.880 AS $109.140 HolidaysScope of WorkTravel & Subsistence
#ROOFER MASTIC WORKER, KETTLEMAN 08/22/2020 07/31/2021** $40.770 $11.050 $7.500 $4.100 $0.750 $0.700 8.0 $64.870 $85.250 K $85.250 AS $105.640 HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER 08/22/2020 06/27/2021** $64.060 H $14.850 AT $29.740 AU $0.000 F $1.530 $0.710 8.0 $110.890 $146.480 Q $146.480 Q $182.070 HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS 08/22/2020 06/27/2021** $55.920 H $14.850 AT $28.200 AU $0.000 F $1.530 $0.710 8.0 $101.210 $132.270 Q $132.270 Q $163.340 HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER SERVICE MECHANIC (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) 08/22/2020 06/27/2021** $43.950 H $14.250 AV $15.480 AU $0.000 F $1.430 $0.710 8.0 $75.820 $99.050 AW $99.050 AW $122.270 HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER SERVICE TECHNICIAN (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) 08/22/2020 06/27/2021** $39.580 H $14.250 AV $10.210 AU $0.000 F $1.430 $0.710 8.0 $66.180 $86.770 AW $86.770 AW $107.360 HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER AIR CONDITIONING SPECIALIST (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) 08/22/2020 06/27/2021** $34.680 H $14.250 AV $4.910 AU $0.000 F $1.410 $0.710 8.0 $55.960 $73.840 Q $73.840 Q $91.720 HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER AIR CONDITIONING PRO (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) 02/22/2021 06/27/2021** $40.820 H $14.250 AT $10.490 AU $0.000 F $1.410 $0.710 8.0 $67.680 $88.840 Q $88.840 Q $110.000 HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER METAL DECK & SIDING 08/22/2020 06/30/2021** $44.450 H $14.830 AR $20.400 AX $0.000 F $0.320 AY $0.000 8.0 $80.000 $103.230 Q $103.230 Q $126.450 HolidaysScope of WorkTravel & Subsistence
#TERRAZZO FINISHER AZ 08/22/2020 06/30/2021** $38.670 BA $10.750 $5.870 $0.000 F $0.800 $1.000 8.0 $57.090 $74.090 Q $74.090 Q $91.090 HolidaysScope of WorkTravel & Subsistence
#TERRAZZO WORKER AZ 08/22/2020 06/30/2021** $50.660 BA $10.750 $15.370 $0.000 F $0.800 $1.220 8.0 $78.800 $101.050 Q $101.050 Q $123.300 HolidaysScope of WorkTravel & Subsistence
#TILE FINISHER 08/22/2020 03/31/2021* $30.220 BB $10.310 $5.300 $1.000 $0.820 $1.060 8.0 $48.710 $63.820 $63.820 D $78.930 HolidaysScope of WorkTravel & Subsistence
#TILE FINISHER RED CIRCLED FINISHER 08/22/2020 03/31/2021* $36.100 BB $10.310 $6.080 $1.500 $0.820 $1.130 8.0 $55.940 $73.990 $73.990 D $92.040 HolidaysScope of WorkTravel & Subsistence
#TILE SETTER 08/22/2020 03/31/2021* $49.530 BB $10.310 $7.800 $2.500 $1.170 $1.750 8.0 $73.060 $97.820 $97.820 D $122.590 HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER: DRILLER, PUMP REPAIRMAN 08/22/2007 01/31/2008* $20.170 $8.120 $3.690 $0.800 BC $0.000 $0.000 8.0 $32.780 $42.870 BD $42.870 BD $42.870 BD HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER: PUMP INSTALLER 08/22/2007 01/31/2008* $17.860 $8.120 $3.690 $0.720 BE $0.000 $0.000 8.0 $30.390 $39.320 BD $39.320 BD $39.320 BD HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER: HELPER 02/22/2021 03/31/2021* $14.000 $8.120 $3.690 $0.580 BF $0.000 $0.000 8.0 $26.390 $33.390 BD $33.390 BD $33.390 BD HolidaysScope of WorkTravel & Subsistence

Go to increase page

FOOTNOTES

*
EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
#
INDICATES AN APPRENTICEABLE CRAFT. THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @ HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.
&
THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.
A
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
B
VACATION IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER
C
INCLUDES AMOUNT FOR INDUSTRY PROMOTION FUND, INTERNATIONAL MASONRY INSTITUTE, LABOR MANAGEMENT COOPERATION COMMITTEE, AND VACATION TRUST FUND.
D
SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
E
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
F
INCLUDED IN STRAIGHT-TIME HOURLY RATE.
G
RATE APPLIES TO THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
H
INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
I
RATE APPLIES TO FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWNDURING THE NORMAL WORK WEEK DUE TO INCLEMENT WEATHER.
J
INCLUDED IN BASIC HOURLY RATE.
K
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
L
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD.
M
IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES.
N
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
O
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
P
IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE FOR ADMINISTRATIVE MAINTENANCE FUND IS ADDED TO THE TOTAL HOURLY RATE AND IS FACTORED INTO THE OVERTIME HOURLY RATE.
Q
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
R
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS WORKED; ALL OTHER OVERTIME IS PAID AT THE SATURDAY, SUNDAY AND HOLIDAY OVERTIME RATE.
S
ALL CREWS, WITHOUT CONSIDERATION TO THE NUMBER OF INDIVIDUALS IN THE CREW, SHALL INCLUDE A CHIEF OF PARTY. A CREW CONSISTS OF ONE (1) OR MORE EMPLOYEES PERFORMING FIELD AND CONSTRUCTION SURVEY WORK.
T
INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
U
INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.
V
RATE APPLIES TO DAILY OVERTIME HOURS UP TO AND INCLUDING 12 HOURS WORKED IN A WORKDAY OR OTHER OVERTIME HOURS BEYOND 40 HOURS IN A WORKWEEK. ALL OTHER OVERTIME IS PAID AT THE SUNDAY/HOLIDAY RATE. IN THE EVENT THAT THERE ARE LESS THAN 40 HOURS WORKED MONDAY THROUGH FRIDAY, THEN THE BALANCE OF HOURS WORKED UP TO AND INCLUDING 40 HOURS FOR THE WORKWEEK, OR UP TO 8 HOURS FOR THE WORKDAY, MAY BE WORKED ON SATURDAY AT THE STRAIGHT-TIME RATE.
W
CERTIFIED MANIPULATOR WORK SHALL RECEIVE $1.25 PER HOUR ABOVE THE BASIC WAGE RATE
X
INCLUDES AN AMOUNT PER HOUR WORKED FOR IUPAT, IARP, AND RETIREE PENSION.
Y
INCLUDES AMOUNTS FOR INDUSTRY FUND, WORK PRESERVATION FUND, AND LABOR MANAGEMENT COOPERATION INITIATIVE
Z
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND FIRST 8 HOURS WORKED ON DESIGNATED DAYS OFF; ALL OTHER TIME IS PAID AT THE SATURDAY, SUNDAY AND HOLIDAY OVERTIME RATE.
AA
EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFFOLD SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.
AB
INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.
AC
RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
AD
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: WALLCOVERING ($2.00 PER HOUR), EXOTIC MATERIALS ($1.25 PER HOUR) AND LEAD ABATEMENT/REMOVAL ($1.00 PER HOUR). EMPLOYEES SHALL ALSO BE ENTITLED TO HIGH TIME PREMIUM PAY WHENEVER THE WORK PERFORMED REQUIRES PERSONAL FALL RESTRAINTS TO BE WORN BY THE EMPLOYEE. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $2.00 PER HOUR ABOVE BASIC HOURLY RATE WHEN WORKING OVER 50 FEET ABOVE GROUND OR WATER LEVEL, $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET AND $6.00 PER HOUR WHEN WORKING OVER 180 FEET. SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
AE
RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 12 HOURS WORKED ON SATURDAYS AND DESIGNATED DAYS OFF. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
AF
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: METALIZING AND THERMAL SPRAY ($4.00 PER HOUR). EMPLOYEES SHALL ALSO BE ENTITLED TO HIGH TIME PREMIUM PAY WHENEVER THE WORK PERFORMED REQUIRES PERSONAL FALL RESTRAINTS TO BE WORN BY THE EMPLOYEE. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET ABOVE GROUND OR WATER LEVEL AND $6.00 PER HOUR WHEN WORKING OVER 180 FEET. SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
AG
EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: METALIZING AND THERMAL SPRAY ($4.00 PER HOUR). SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.
AH
INCLUDES AMOUNTS FOR VACATION AND DUES CHECK OFF
AI
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
AJ
DESIGNATED DAYS OFF SHALL BE PAID AT THE SATURDAY OVERTIME RATE; PLEASE REFER TO THE HOLIDAY PROVISIONS FOR A LIST OF DESIGNATED DAYS OFF.
AK
INCLUDES AN AMOUNT WITHHELD FOR DUES CHECK OFF WHICH IS NOT FACTORED INTO OVERTIME AND HOLIDAY WAGE RATES. EMPLOYEES OPERATING AND WORKING BEHIND PLASTER GUNS SHALL RECEIVE AN ADDITIONAL $5.00 PER DAY.
AL
RATE APPLIES TO THE FIRST 8 HOURS WORKED; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AM
AMOUNT IS FOR VALLEY MORTAR TRADES FUND AND INDUSTRY STABILIZATION FUND
AN
INCLUDES AN AMOUNT FOR VACATION/HOLIDAY.
AO
INCLUDES FUNDS FOR SUB/JURY DUTY, CRAFT, CONTRACT ADMINISTRATION/HIRING HALL, JURISDICTIONAL PROTECTION AND SCHOLARSHIP.
AP
RATE APPLIES TO THE FIRST 2 OVERTIME HOURS ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AQ
RATE APPLIES TO THE FIRST 10 HOURS WORKED ON SATURDAY. ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
AR
PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AS
APPLIES TO THE FIRST 12 HOURS WORKED ON SATURDAY. ALL OTHER OVERTIME IS PAID AT THE SUNDAY/HOLIDAY RATE. IN THE EVENT THAT CONDITIONS OVER WHICH THE ROOFING CONTRACTOR HAS NO CONTROL (I.E. ADVERSE WEATHER, PROJECT DELAYS, LOGISTICAL PROBLEMS, GENERAL CONTRACTOR OR BUILDING OWNER REQUIREMENTS, ETC.) PREVENT EMPLOYEES FROM WORKING ON ONE OR MORE DAYS DURING THE REGULAR WORK WEEK, WORK PERFORMED ON SATURDAY MAY BE PAID AT THE STRAIGHT TIME RATES.
AT
INCLUDES SMOHIT AND SHC. EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AU
INCLUDES AN AMOUNT FOR PENSION WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AV
INCLUDES SHC. EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AW
RATE APPLIES TO FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY DURING THE EMPLOYEES NORMAL WORKING HOURS. ALL OTHER OVERTIME HOURS SHALL BE PAID AT THE SUNDAY AND HOLIDAY DOUBLE TIME RATE.
AX
INCLUDES AN AMOUNT FOR PENSION FACTORED AT THE OVERTIME MULTIPLIER RATE.
AY
INCLUDES $0.05 FOR SCHOLAR FUND.
AZ
THE RATIO OF TERRAZZO FINISHER HOURS TO TERRAZZO WORKER HOURS SHALL NOT EXCEED TWO (2) TO ONE (1).
BA
INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
BB
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF, WHICH IS FACTORED IN THE OVERTIME RATES. ANY EMPLOYEE WORKING UNDERGROUND SHALL RECEIVE $1.00 PER HOUR IN ADDITION TO REGULAR WAGES.
BC
RATE APPLIES TO FIRST TWO YEARS OF EMPLOYMENT ONLY; $1.35 AFTER 2 YEARS; $1.45 AFTER 5 YEARS; $1.60 AFTER 10 YEARS
BD
COMPUTATION IS BASED ON THE LOWEST VACATION AMOUNT. THESE RATES SHOULD BE INCREASED BY ANY ADDITIONAL VACATION/HOLIDAY PAY THAT IS REQUIRED.
BE
RATE APPLIES TO FIRST TWO YEARS OF EMPLOYMENT ONLY; $1.27 AFTER 2 YEARS; $1.37 AFTER 5 YEARS; $1.52 AFTER 10 YEARS.
BF
RATE APPLIES TO FIRST TWO YEARS OF EMPLOYMENT ONLY; $1.13 AFTER 2 YEARS; $1.23 AFTER 5 YEARS; $1.38 AFTER 10 YEARS.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH THE DIRECTOR OF INDUSTRIAL RELATIONS. IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE. YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

TRAVEL AND/OR SUBSISTENCE: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH WORKER TO EXECUTE THE WORK. YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

Return to main page