GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: YOLO COUNTY

DETERMINATION: YOL-2020-1

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE DATE OF NEXT INCREASE 1 AMOUNT OF INCREASE 1 INCREASE FOOTNOTE 1 DATE OF NEXT INCREASE 2 AMOUNT OF INCREASE 2 INCREASE FOOTNOTE 2 DATE OF NEXT INCREASE 3 AMOUNT OF INCREASE 3 INCREASE FOOTNOTE 3 DATE OF NEXT INCREASE 4 AMOUNT OF INCREASE 4 INCREASE FOOTNOTE 4
BRICKLAYER, BLOCKLAYER, POINTER, CLEANER, CAULKER, WATERPROOFER (2ND SHIFT) 08/22/2019 06/30/2020** 07/01/2020 $2.250 A 07/01/2021 $2.250 A 07/01/2022 $2.250 A
BRICKLAYER, BLOCKLAYER, POINTER, CLEANER, CAULKER, WATERPROOFER (3RD SHIFT) 08/22/2019 06/30/2020** 07/01/2020 $2.250 A 07/01/2021 $2.250 A 07/01/2022 $2.250 A
BRICKLAYER, BLOCKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON (2ND SHIFT) 08/22/2019 04/30/2020** 05/01/2020 $2.500 A 05/01/2021 $2.850 A
BRICKLAYER, BLOCKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON (3RD SHIFT) 08/22/2019 04/30/2020** 05/01/2020 $2.500 A 05/01/2021 $2.850 A
BRICK TENDER BRICK TENDER (SPECIAL SINGLE SHIFT) 08/22/2019 06/30/2020** 07/01/2020 $1.950 A 07/01/2021 $1.950 A 07/01/2022 $2.000 A
ELECTRICIAN: INSIDE WIREMAN, 2ND SHIFT 02/22/2020 07/31/2020** 08/01/2020 $1.000 A 02/01/2021 $1.000 A
ELECTRICIAN: INSIDE WIREMAN, 3RD SHIFT 02/22/2020 07/31/2020** 08/01/2020 $1.000 A 02/01/2021 $1.000 A
ELECTRICIAN: CABLE SPLICER, 2ND SHIFT 02/22/2020 07/31/2020** 08/01/2020 $1.000 A 02/01/2021 $1.000 A
ELECTRICIAN: CABLE SPLICER, 3RD SHIFT 02/22/2020 07/31/2020** 08/01/2020 $1.000 A 02/01/2021 $1.000 A
MARBLE FINISHER MARBLE FINISHER (2ND SHIFT) B 02/22/2020 07/31/2020** 08/01/2020 $1.750 A 08/01/2021 $1.750 A 08/01/2022 $2.150 A 08/01/2023 $2.250 A
MARBLE MASON MARBLE MASON (2ND SHIFT) B 02/22/2020 07/31/2020** 08/01/2020 $2.500 A 08/01/2021 $2.500 A 08/01/2022 $3.250 A 08/01/2023 $3.500 A
SHEET METAL WORKER SHEET METAL WORKER (2ND SHIFT) 08/22/2019 06/30/2020** 07/01/2020 $3.000 A
SHEET METAL WORKER SHEET METAL WORKER (3RD SHIFT) 08/22/2019 06/30/2020** 07/01/2020 $3.000 A

Return to wage page

FOOTNOTES

**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
A
THE PREDETERMINED INCREASE SHOWN IS TO BE ALLOCATED TO WAGES AND/OR EMPLOYER PAYMENTS. PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 WHEN THE PREDETERMINED INCREASE BECOMES DUE TO CONFIRM THE DISTRIBUTION. PLEASE ALSO EXAMINE THE IMPORTANT NOTICES TO SEE IF ANY MODIFICATIONS HAVE BEEN ISSUED, AS THERE MAY BE REDUCTIONS TO PREDETERMINED INCREASES.
B
EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFFOLD SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.

Return to main page