GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: IMPERIAL COUNTY

DETERMINATION: IMP-2020-1

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE DATE OF NEXT INCREASE 1 AMOUNT OF INCREASE 1 INCREASE FOOTNOTE 1 DATE OF NEXT INCREASE 2 AMOUNT OF INCREASE 2 INCREASE FOOTNOTE 2 DATE OF NEXT INCREASE 3 AMOUNT OF INCREASE 3 INCREASE FOOTNOTE 3 DATE OF NEXT INCREASE 4 AMOUNT OF INCREASE 4 INCREASE FOOTNOTE 4 DATE OF NEXT INCREASE 5 AMOUNT OF INCREASE 5 INCREASE FOOTNOTE 5 DATE OF NEXT INCREASE 6 AMOUNT OF INCREASE 6 INCREASE FOOTNOTE 6
BRICKLAYER: 02/22/2020 10/31/2020** 11/01/2020 $2.000 A
BRICK TENDER B 08/22/2019 06/30/2020** 07/01/2020 $1.550 A
BRICK TENDER FORKLIFT OPERATOR 08/22/2019 06/30/2020** 07/01/2020 $1.550 A
CARPET LAYER: RESILIENT TILE LAYER 02/22/2020 12/31/2020** 01/01/2021 $1.650 C 01/01/2022 $1.600 D
DRYWALL FINISHER DRYWALL FINISHER 02/22/2020 09/30/2020** 10/01/2020 $2.500 A 10/01/2021 $2.500 A
ELECTRICIAN: SOUND AND SIGNAL TECHNICIAN 08/22/2019 05/31/2020** 06/01/2020 $1.500 A 06/01/2021 $1.500 A
FIELD SURVEYOR: CHIEF OF PARTY (018.167-010) E 02/22/2020 09/30/2020** 10/01/2020 $2.750 A 10/01/2021 $2.750 A
FIELD SURVEYOR: INSTRUMENTMAN (018.167-034) E 02/22/2020 09/30/2020** 10/01/2020 $2.450 A 10/01/2021 $2.450 A
FIELD SURVEYOR: CHAINMAN/RODMAN (869.567-010) E 02/22/2020 09/30/2020** 10/01/2020 $2.450 A 10/01/2021 $2.450 A
PAINTER: PAINTER, LEAD ABATEMENT F 02/22/2020 06/30/2020** 07/01/2020 $2.150 G
PAINTER: REPAINT PAINTER, LEAD ABATEMENT F 02/22/2020 06/30/2020** 07/01/2020 $2.150 G
PAINTER: INDUSTRIAL PAINTER F 02/22/2020 06/30/2020** 07/01/2020 $2.650 H
PAINTER: INDUSTRIAL REPAINT PAINTER F 02/22/2020 06/30/2020** 07/01/2020 $2.650 H
PLASTERER 08/22/2019 08/04/2020** 08/05/2020 $2.200 A 08/04/2021 $2.200 A
PLASTER TENDER I 08/22/2019 08/04/2020** 08/05/2020 $2.200 A 08/04/2021 $2.200 A
PLASTER TENDER PLASTER CLEAN-UP LABORER 08/22/2019 08/04/2020** 08/05/2020 $2.200 A 08/04/2021 $2.200 A
PLUMBER: PLUMBER, INDUSTRIAL AND GENERAL PIPEFITTER 02/22/2020 08/31/2020** 09/01/2020 $2.010 A 09/01/2021 $2.260 A 09/01/2022 $2.260 A 09/01/2023 $2.350 A 09/01/2024 $2.500 A 09/01/2025 $2.500 A
PLUMBER: SEWER AND STORM DRAIN PIPELAYER 02/22/2020 08/31/2020** 09/01/2020 $2.010 A 09/01/2021 $2.260 A 09/01/2022 $2.260 A 09/01/2023 $2.350 A 09/01/2024 $2.500 A 09/01/2025 $2.500 A
PLUMBER: SEWER AND STORM DRAIN PIPE TRADESMAN J 02/22/2020 08/31/2020** 09/01/2020 $0.800 A 09/01/2021 $0.900 A 09/01/2022 $0.900 A 09/01/2023 $0.940 A 09/01/2024 $1.000 A 09/01/2025 $1.000 A
PLUMBER: SERVICE & REPAIR (PLUMBER/HVAC-FITTER) 02/22/2020 08/31/2020** 09/01/2020 $2.010 A 09/01/2021 $2.260 A 09/01/2022 $2.260 A 09/01/2023 $2.350 A 09/01/2024 $2.500 A 09/01/2025 $2.500 A
PLUMBER: LANDSCAPE/IRRIGATION FITTER 08/22/2019 08/31/2020** 09/01/2020 $2.010 A 09/01/2021 $2.260 A 09/01/2022 $2.260 A 09/01/2023 $2.350 A 09/01/2024 $2.500 A 09/01/2025 $2.500 A
PLUMBER: LANDSCAPE/IRRIGATION TRADESMAN K 08/22/2019 08/31/2020** 09/01/2020 $0.520 A 09/01/2021 $0.590 A 09/01/2022 $0.590 A 09/01/2023 $0.610 A 09/01/2024 $0.650 A 09/01/2025 $0.650 A
ROOFER 08/22/2019 06/30/2020** 07/01/2020 $2.000 A 07/01/2021 $2.000 A
ROOFER PITCH WORK 08/22/2019 06/30/2020** 07/01/2020 $2.000 A 07/01/2021 $2.000 A
TERRAZZO FINISHER 02/22/2020 08/31/2020** 09/01/2020 $1.630 A 09/01/2021 $1.680 A
TERRAZZO WORKER 02/22/2020 08/31/2020** 09/01/2020 $1.910 A 09/01/2021 $1.980 A

Return to wage page

FOOTNOTES

**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
A
THE PREDETERMINED INCREASE SHOWN IS TO BE ALLOCATED TO WAGES AND/OR EMPLOYER PAYMENTS. PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 WHEN THE PREDETERMINED INCREASE BECOMES DUE TO CONFIRM THE DISTRIBUTION. PLEASE ALSO EXAMINE THE IMPORTANT NOTICES TO SEE IF ANY MODIFICATIONS HAVE BEEN ISSUED, AS THERE MAY BE REDUCTIONS TO PREDETERMINED INCREASES.
B
THE RATIO OF BRICK TENDERS TO BRICKLAYERS SHALL BE AS FOLLOWS: ONE (1) BRICK TENDER TO NO MORE THAN THREE (3) BRICKLAYERS DURING THE INSTALLATION OF BLOCK ON A TYPICAL MASONRY PROJECT.
C
$1.25 TO BASIC HOURLY RATE, $0.25 TO VACATION/HOLIDAY, $0.10 TO TRAINING,$0.05 TO OTHER
D
$1.25 TO BASIC HOURLY RATE, $0.25 TO VACATION/HOLIDAY, $0.05 TO TRAINING, $0.05 TO OTHER
E
DICTIONARY OF OCCUPATIONAL TITLES, FOURTH EDITION, 1977, U.S. DEPARTMENT OF LABOR.
F
AN ADDITIONAL $0.25 PER HOUR WILL BE ADDED TO THE BASIC HOURLY RATE WHEN PERFORMING PAPERHANGING WORK.
G
$1.00 TO THE BASIC HOURLY RATE, $0.90 TO PENSION, $0.10 TO HEALTH AND WELFARE AND $0.15 TO TRAINING.
H
$1.50 TO THE BASIC HOURLY RATE, $0.90 TO PENSION, $0.10 TO HEALTH AND WELFARE AND $0.15 TO TRAINING.
I
THE RATIO OF PLASTER TENDERS TO PLASTERERS SHALL BE AS FOLLOWS: THERE SHALL BE A PLASTER TENDER ON THE JOBSITE WHENEVER THERE IS A PLASTERER PERFORMING WORK ON THE JOBSITE, EXCEPT ON SMALL PATCH WORK WHERE ONLY ONE PLASTERER IS PERFORMING WORK. FOR INSIDE BROWN COATINGS THERE SHALL BE 2 PLASTER TENDERS FOR UP TO EVERY 3 PLASTERERS. FOR INSIDE FINISH COATINGS THERE SHALL BE 1 PLASTER TENDER FOR UP TO EVERY 3 PLASTERERS. ON OUTSIDE FINISH AND BROWN COATINGS AND FOR ALL OTHER WORK, THERE SHALL BE 1 PLASTER TENDER FOR UP TO EVERY 2 PLASTERERS.
J
PIPE TRADESMEN SHALL NOT BE PERMITTED ON ANY JOB WITHOUT A JOURNEYMAN.
K
TRADESMEN SHALL ONLY BE USED IF THE FIRST WORKER ON THE JOB IS A LANDSCAPE/IRRIGATION FITTER, SECOND WORKER MUST BE A LANDSCAPE/IRRIGATION FITTER OR APPRENTICE LANDSCAPE/IRRIGATION FITTER. THE 3RD AND 4TH MAY BE A TRADESMAN. THE 5TH MUST BE A LANDSCAPE/IRRIGATION FITTER AND THEREAFTER TRADESMEN WILL BE REFERRED ON A 50-50 BASIS, TO JOURNEYMAN OR APPRENTICE.

Return to main page