GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: SAN FRANCISCO COUNTY

DETERMINATION: SFR-2020-1

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE BASIC HOURLY RATE BASIC HOURLY RATE FOOTNOTE HEALTH AND WELFARE HEALTH AND WELFARE FOOTNOTE PENSION PENSION FOOTNOTE VACATION/ HOLIDAY VACATION/ HOLIDAY FOOTNOTE TRAINING TRAINING FOOTNOTE OTHER PAYMENTS OTHER PAYMENTS FOOTNOTE HOURS HOURS FOOTNOTE TOTAL HOURLY RATE DAILY OVERTIME HOURLY RATE DAILY OVERTIME HOURLY RATE FOOTNOTE SATURDAY OVERTIME HOURLY RATE SATURDAY OVERTIME HOURLY RATE FOOTNOTE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE FOOTNOTE HOLIDAY PROVISIONS SCOPE OF WORK PROVISIONS TRAVEL & SUBSISTENCE PROVISIONS
#BRICKLAYER, BLOCKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON 08/22/2019 04/30/2020** $42.920 A $10.200 $14.270 $3.000 B $0.800 $1.860 C 8 D $73.050 $96.010 E $96.010 E $118.970 HolidaysScope of WorkTravel & Subsistence
BRICKLAYER, BLOCKLAYER: POINTER, CLEANER, CAULKER, WATERPROOFER 08/22/2019 06/30/2020** $51.210 A $10.200 $12.580 $0.000 F $1.560 $0.430 8 D $75.980 $101.580 $101.580 G $127.190 HolidaysScope of WorkTravel & Subsistence
#BRICK TENDER 08/22/2019 06/30/2020** $36.110 H $8.500 $12.210 $0.000 F $0.450 $0.300 8 $57.570 $75.630 I $75.630 I $93.680 HolidaysScope of WorkTravel & Subsistence
#CARPET, LINOLEUM, SOFT FLOOR LAYER 02/22/2020 12/31/2020** $50.350 A $10.450 $17.330 $0.000 J $0.850 $0.340 8 $79.320 $104.490 K $104.490 K $129.670 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, FLOOR COVERING HANDLER AFTER 3 YEARS 02/22/2020 12/31/2020** $25.150 A $10.450 $8.670 $0.000 J $0.050 $0.340 8 $44.660 $57.230 K $57.230 K $69.810 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, FLOOR COVERING HANDLER LESS THAN 3 YEARS 02/22/2020 12/31/2020** $20.110 A $10.450 $6.930 $0.000 J $0.050 $0.340 8 $37.880 $47.930 K $47.930 K $57.990 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, FLOOR COVERING HANDLER TRAINEE, FIRST 3 MONTHS 02/22/2020 12/31/2020** $16.080 A $10.450 $5.550 $0.000 J $0.050 $0.340 8 $32.470 $40.510 K $40.510 K $48.550 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, FLOOR COVERING HANDLER TRAINEE, SECOND 3 MONTHS 02/22/2020 12/31/2020** $18.090 A $10.450 $6.230 $0.000 J $0.050 $0.340 8 $35.160 $44.210 K $44.210 K $53.250 HolidaysScope of WorkTravel & Subsistence
#ELECTRICIAN: COMM & SYSTEM INSTALLER 02/22/2020 11/30/2020** $43.430 $11.550 $7.650 L $0.000 $1.100 $0.260 M 8 $65.510 $87.990 N $87.990 N $110.470 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: COMM & SYSTEM TECH. 02/22/2020 11/30/2020** $49.940 $11.550 $7.650 L $0.000 $1.100 $0.260 M 8 $72.250 $98.090 N $98.090 N $123.940 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: INSIDE WIREMAN 08/22/2019 05/31/2020** $74.500 $15.730 $16.520 O $0.000 F $1.085 $0.380 P 7 Q $111.010 $149.660 R $188.300 S $188.300 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: CABLE SPLICER 08/22/2019 05/31/2020** $83.810 $15.730 $16.520 O $0.000 F $1.085 $0.380 P 7 Q $120.670 $164.150 R $207.620 S $207.620 HolidaysScope of WorkTravel & Subsistence
#FIELD SURVEYOR: CHIEF OF PARTY T 02/22/2020 02/28/2021* $47.030 $13.880 $12.010 U $4.790 V $1.160 $0.210 8 $79.080 $102.600 W $102.600 X $126.110 HolidaysScope of WorkTravel & Subsistence
FIELD SURVEYOR: INSTRUMENTMAN T 02/22/2020 02/28/2021* $43.940 $13.880 $12.010 U $4.790 V $1.160 $0.210 8 $75.990 $97.960 W $97.960 X $119.930 HolidaysScope of WorkTravel & Subsistence
FIELD SURVEYOR: CHAINMAN/RODMAN T 02/22/2020 02/28/2021* $41.060 $13.880 $12.010 U $4.790 V $1.160 $0.210 8 $73.110 $93.640 W $93.640 X $114.170 HolidaysScope of WorkTravel & Subsistence
#GLAZIER Y 02/22/2020 06/30/2020** $51.370 A $10.450 $18.550 Z $0.000 $0.800 $0.380 AA 8 $81.550 $107.240 AB $132.920 $132.920 HolidaysScope of WorkTravel & Subsistence
#MARBLE FINISHER AC 02/22/2020 07/31/2020** $35.410 AD $10.200 $5.280 $0.000 J $0.450 $0.850 8 $52.190 $69.890 AE $87.600 $87.600 HolidaysScope of WorkTravel & Subsistence
#MARBLE MASON AC 02/22/2020 07/31/2020** $49.420 AD $10.200 $16.080 $0.000 J $0.800 $1.160 8 $77.660 $102.370 AE $127.080 $127.080 HolidaysScope of WorkTravel & Subsistence
#PAINTER: BRUSH AND SPRAY AF 02/22/2020 06/30/2020* $47.240 H $10.450 $13.820 U $0.000 J $0.760 $0.380 8 D $72.650 $96.270 $96.270 AG $119.890 HolidaysScope of WorkTravel & Subsistence
PAINTER: METALIZING AND THERMAL SPRAY AF 02/22/2020 06/30/2020* $51.240 H $10.450 $13.820 U $0.000 J $0.760 $0.380 8 D $76.650 $102.270 $102.270 AG $127.890 HolidaysScope of WorkTravel & Subsistence
PAINTER: INDUSTRIAL PAINTER AH 02/22/2020 06/30/2020* $48.740 H $10.450 $13.820 U $0.000 J $0.760 $0.380 8 D $74.150 $98.520 $98.520 AG $122.890 HolidaysScope of WorkTravel & Subsistence
PAINTER: SANDBLASTER, STEAM CLEANER, WATERBLASTER AF 02/22/2020 06/30/2020* $47.740 H $10.450 $13.820 U $0.000 J $0.760 $0.380 8 D $73.150 $97.020 $97.020 AG $120.890 HolidaysScope of WorkTravel & Subsistence
PAINTER: EXOTIC MATERIALS AF 02/22/2020 06/30/2020* $47.990 H $10.450 $13.820 U $0.000 J $0.760 $0.380 8 D $73.400 $97.400 $97.400 AG $121.390 HolidaysScope of WorkTravel & Subsistence
PAINTER: PAPERHANGER, WALLCOVERING, LEAD ABATEMENT AF 02/22/2020 06/30/2020* $48.240 H $10.450 $13.820 U $0.000 J $0.760 $0.380 8 D $73.650 $97.770 $97.770 AG $121.890 HolidaysScope of WorkTravel & Subsistence
PAINTER: TAPER 02/22/2020 12/31/2020** $51.460 AI $10.450 $16.080 $0.000 J $0.860 $0.630 8 $79.480 $105.210 AJ $105.210 AJ $130.940 AG HolidaysScope of WorkTravel & Subsistence
#PLASTERER 08/22/2019 06/30/2020** $42.410 AK $13.580 $15.970 $0.000 F $1.180 $1.200 8 D $74.340 $92.580 AL $92.580 AL $110.820 HolidaysScope of WorkTravel & Subsistence
#PLASTER TENDER 08/22/2019 06/30/2020** $34.730 $8.500 $14.020 $4.510 $0.450 $0.450 8 $62.660 $80.030 K $80.030 K $97.390 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: PLUMBER, STEAMFITTER, REFRIGERATION FITTER (HVAC) 08/22/2019 06/30/2020** $74.160 AM $16.560 $20.830 $0.000 F $3.600 $2.550 AN 7 $117.700 $154.780 AO $154.780 AP $191.860 HolidaysScope of WorkTravel & Subsistence
PLUMBER: PLUMBING SERVICE AND REPAIR 08/22/2019 06/30/2020** $63.040 AM $15.840 $18.650 $0.000 F $2.100 $1.280 AN 8 $100.910 $132.430 AQ $132.430 AR $163.950 HolidaysScope of WorkTravel & Subsistence
PLUMBER: AIR CONDITIONING & REFRIGERATION/HVAC - SERVICE WORK 08/22/2019 06/30/2020** $74.160 AM $16.560 $20.830 $0.000 F $3.600 $2.550 AN 8 $117.700 $154.780 AQ $154.780 AR $191.860 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE/IRRIGATION PIPEFITTER 08/22/2019 06/30/2020** $63.040 A $15.840 $13.690 AS $0.000 F $1.360 $0.790 8 $94.720 $126.240 $126.240 AT $157.760 HolidaysScope of WorkTravel & Subsistence
PLUMBER: UNDERGROUND/UTILITY PIPEFITTER 08/22/2019 06/30/2020** $63.040 A $15.840 $13.690 AS $0.000 F $1.360 $0.790 8 $94.720 $126.240 $126.240 AT $157.760 HolidaysScope of WorkTravel & Subsistence
PLUMBER: SPRINKLER FITTER (FIRE PROTECTION AND FIRE CONTROL SYSTEMS) 02/22/2020 08/02/2020** $65.250 A $11.740 $19.740 $0.000 F $1.600 $0.550 8 $98.880 $131.510 E $131.510 E $164.130 HolidaysScope of WorkTravel & Subsistence
#ROOFER 08/22/2019 07/31/2020** $38.300 $10.210 $8.380 $3.580 $0.850 $0.550 AU 8 $61.870 $81.020 AV $81.020 AV $100.170 HolidaysScope of WorkTravel & Subsistence
ROOFER BITUMASTIC, ENAMELER, PIPE WRAPPER, COAL TAR PITCH BUILD-UP 08/22/2019 07/31/2020** $40.300 $10.210 $8.380 $3.580 $0.850 $0.550 AU 8 $63.870 $84.020 AV $84.020 AV $104.170 HolidaysScope of WorkTravel & Subsistence
ROOFER MASTIC WORKER, KETTLEMAN (2 KETTLES WITHOUT PUMPS) 08/22/2019 07/31/2020** $38.550 $10.210 $8.380 $3.580 $0.850 $0.550 AU 8 $62.120 $81.390 AV $81.390 AV $100.670 HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER 08/22/2019 06/28/2020** $61.360 H $14.600 AW $29.440 AX $0.000 F $1.530 $0.710 7 $107.640 $141.730 AY $141.730 AY $175.820 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER TOTAL SHEET METAL CONTRACT OF $200000 OR LESS 08/22/2019 06/28/2020** $53.670 H $14.600 AW $27.950 AX $0.000 F $1.530 $0.710 8 $98.460 $128.270 AZ $128.270 AZ $158.090 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER SERVICE MECHANIC (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2019 06/28/2020** $42.250 H $14.000 BA $15.480 AX $0.000 F $1.430 $0.710 8 $73.870 $96.250 BB $96.250 BB $118.620 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER SERVICE TECHNICIAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2019 06/28/2020** $38.040 H $14.000 BA $10.210 AX $0.000 F $1.430 $0.710 8 $64.390 $84.210 BB $84.210 BB $104.030 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER AIR CONDITIONING SPECIALIST (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2019 06/28/2020** $33.510 H $14.000 BA $4.870 AX $0.000 F $1.410 $0.710 8 $54.500 $71.780 AZ $71.780 AZ $89.050 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER AIR CONDITIONING JOURNEYMAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2019 06/28/2020** $39.280 H $14.000 AW $10.490 AX $0.000 F $1.410 $0.710 8 $65.890 $86.280 AZ $86.280 AZ $106.670 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER METAL DECK & SIDING 08/22/2019 06/30/2020* $42.330 H $14.580 AS $20.400 BC $0.000 F $0.320 BD $0.000 8 $77.630 $99.790 AZ $99.790 AZ $121.960 HolidaysScope of WorkTravel & Subsistence
#TERRAZZO FINISHER BE 08/22/2018 06/30/2019* $36.180 BF $9.950 $5.740 $0.000 F $0.800 $0.920 8 $53.590 $69.440 AZ $69.440 AZ $85.290 HolidaysScope of WorkTravel & Subsistence
#TERRAZZO WORKER BE 08/22/2018 06/30/2019* $45.900 BF $9.950 $15.040 $0.000 F $0.800 $1.110 8 $72.800 $92.810 AZ $92.810 AZ $112.820 HolidaysScope of WorkTravel & Subsistence
#TILE FINISHER 02/22/2020 03/31/2020** $28.940 BG $9.810 $5.260 $1.000 $0.820 $1.040 8 $46.870 $61.340 $61.340 D $75.810 HolidaysScope of WorkTravel & Subsistence
TILE FINISHER RED CIRCLED FINISHER 02/22/2020 03/31/2020** $34.820 BG $9.810 $6.040 $1.500 $0.820 $1.110 8 $54.100 $71.510 $71.510 D $88.920 HolidaysScope of WorkTravel & Subsistence
#TILE SETTER 02/22/2020 03/31/2020** $47.400 BG $9.810 $7.460 $2.500 $1.170 $1.720 8 $70.060 $93.760 $93.760 D $117.460 HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER 02/22/2020 03/31/2020* $13.000 $3.200 $0.780 $0.630 BH $0.000 $0.000 8 $17.610 $24.110 BI $24.110 BI $24.110 BI HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER PUMP INSTALLER 02/22/2020 03/31/2020* $13.000 $3.200 $0.780 $0.630 BH $0.000 $0.000 8 $17.610 $24.110 BI $24.110 BI $24.110 BI HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER HELPER 02/22/2020 03/31/2020* $13.000 $3.200 $0.780 $0.520 BJ $0.000 $0.000 8 $17.500 $24.000 BI $24.000 BI $24.000 BI HolidaysScope of WorkTravel & Subsistence

Go to increase page

FOOTNOTES

*
EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
#
INDICATES AN APPRENTICEABLE CRAFT. THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @ HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.
&
THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.
A
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
B
VACATION IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER
C
INCLUDES AMOUNT FOR INDUSTRY PROMOTION FUND, INTERNATIONAL MASONRY INSTITUTE, LABOR MANAGEMENT COOPERATION COMMITTEE, AND VACATION TRUST FUND.
D
SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
E
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
F
INCLUDED IN STRAIGHT-TIME HOURLY RATE.
G
RATE APPLIES TO THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
H
INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
I
RATE APPLIES TO FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWNDURING THE NORMAL WORK WEEK DUE TO INCLEMENT WEATHER.
J
INCLUDED IN BASIC HOURLY RATE.
K
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
L
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD.
M
IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES.
N
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
O
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
P
IN ADDITION, AN AMOUNT EQUAL TO .75% OF THE BASIC HOURLY RATE FOR THE ADMINISTRATIVE MAINTENANCE FUND IS ADDED TO THE TOTAL HOURLY RATE AND IS FACTORED INTO THE OVERTIME HOURLY RATE.
Q
8 HOURS OF WORK IF MULTIPLE SHIFT IS WORKED.
R
RATE APPLIES TO THE FIRST 2 OVERTIME HOURS; ALL OTHER TIME IS PAID AT THE SATURDAY OVERTIME HOURLY RATE.
S
SEVEN HOURS ON SATURDAY MAY BE WORKED AT THE DAILY OVERTIME RATE PROVIDED NO OVERTIME HOUR IS WORKED DURING THE WEEK.
T
ALL CREWS, WITHOUT CONSIDERATION TO THE NUMBER OF INDIVIDUALS IN THE CREW, SHALL INCLUDE A CHIEF OF PARTY. A CREW CONSISTS OF ONE (1) OR MORE EMPLOYEES PERFORMING FIELD AND CONSTRUCTION SURVEY WORK.
U
INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
V
INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.
W
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS, MONDAY THROUGH FRIDAY. ALL OTHER OVERTIME IS PAID AT THE SUNDAY/HOLIDAY RATE.
X
RATE APPLIES TO THE FIRST 12 OVERTIME HOURS WORKED. ALL OTHER OVERTIME IS PAID AT THE SUNDAY/HOLIDAY RATE. IN THE EVENT IT IS NOT REASONABLY POSSIBLE TO COMPLETE 40 HOURS OF WORK ON AN 8 HOUR DAY, MONDAY THROUGH FRIDAY, THEN THE BALANCE OF THE 40 HOURS, UP TO 8 HOURS, MAY BE WORKED ON SATURDAY AT THE STRAIGHT-TIME RATE.
Y
CERTIFIED MANIPULATOR WORK SHALL RECEIVE $1.25 PER HOUR ABOVE THE BASIC WAGE RATE
Z
INCLUDES AN AMOUNT PER HOUR WORKED FOR IUPAT, IARP, AND RETIREE PENSION.
AA
INCLUDES AMOUNTS FOR INDUSTRY FUND, WORK PRESERVATION FUND, AND LABOR MANAGEMENT COOPERATION INITIATIVE
AB
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND FIRST 8 HOURS WORKED ON DESIGNATED DAYS OFF; ALL OTHER TIME IS PAID AT THE SATURDAY, SUNDAY AND HOLIDAY OVERTIME RATE.
AC
EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFFOLD SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.
AD
INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.
AE
RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
AF
EMPLOYEES SHALL BE ENTITLED TO HIGH TIME PREMIUM WHENEVER THE WORK PERFORMED REQUIRES PERSONAL FALL RESTRAINTS TO BE WORN BY THE EMPLOYEE. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $2.00 PER HOUR ABOVE BASIC HOURLY RATE WHEN WORKING OVER 50 FEET ABOVE GROUND OR WATER LEVEL, $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET AND $6.00 PER HOUR WHEN WORKING OVER 180 FEET. EMPLOYEES SHALL BE ENTITLED TO $3.00 PER HOUR ABOVE THE BASIC HOURLY RATE WHEN PERFORMING WORK FROM OR TO A SUSPENDED PLATFORM SUCH AS SAFESPAN, QUICKDECK OR COMPARABLE PLATFORM SYSTEMS ON BRIDGE AND OVERPASS TYPE WORK.
AG
DESIGNATED DAYS OFF SHALL BE PAID AT THE SATURDAY OVERTIME RATE; PLEASE REFER TO THE HOLIDAY PROVISIONS FOR A LIST OF DESIGNATED DAYS OFF.
AH
EMPLOYEES SHALL BE ENTITLED TO HIGH TIME PREMIUM WHENEVER THE WORK PERFORMED REQUIRES PERSONAL FALL RESTRAINTS TO BE WORN BY THE EMPLOYEE. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET ABOVE GROUND OR WATER LEVEL AND $6.00 PER HOUR WHEN WORKING OVER 180 FEET. EMPLOYEES SHALL BE ENTITLED TO $3.00 PER HOUR ABOVE THE BASIC HOURLY RATE WHEN PERFORMING WORK FROM OR TO A SUSPENDED PLATFORM SUCH AS SAFESPAN, QUICKDECK OR COMPARABLE PLATFORM SYSTEMS ON BRIDGE AND OVERPASS TYPE WORK.
AI
INCLUDES AMOUNTS FOR VACATION AND DUES CHECK OFF
AJ
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
AK
INCLUDE AMOUNTS WITHHELD FOR DUES CHECK OFF AND VACATION WHICH IS NOT FACTORED INTO OVERTIME. EMPLOYEES OPERATING AND WORKING BEHIND PLASTER GUNS SHALL RECEIVE AN ADDITIONAL $5.00 PER DAY ABOVE THE WAGE RATE. EMPLOYEES WORKING ON AN EXTERIOR SUSPENDED SCAFFOLD SHALL BE PAID AN ADDITIONAL $10.00 PER DAY ABOVE THE WAGE RATE.
AL
RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAYS AND DESIGNATED DAYS OFF. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
AM
INCLUDES AN AMOUNT FOR VACATION/HOLIDAY.
AN
INCLUDES FUNDS FOR SUB/JURY DUTY, CRAFT, CONTRACT ADMINISTRATION/HIRING HALL, JURISDICTIONAL PROTECTION AND SCHOLARSHIP.
AO
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 9 HOURS ON SATURDAY ONLY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AP
THE FIRST 9 HOURS WORKED ON SATURDAY SHALL BE PAID AT TIME AND ONE-HALF.
AQ
RATE APPLIES TO THE FIRST 2 OVERTIME HOURS ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AR
RATE APPLIES TO THE FIRST 10 HOURS WORKED ON SATURDAY. ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
AS
PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AT
RATE APPLIES TO THE FIRST 8 HOURS WORKED; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AU
INCLUDES AMOUNTS FOR LABOR MANAGEMENT AND PROMOTION FUND
AV
RATE APPLIES FOR THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 12 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY/HOLIDAY RATE. IN THE EVENT THAT CONDITIONS OVER WHICH THE ROOFING CONTRACTOR HAS NO CONTROL (I.E. ADVERSE WEATHER, PROJECT DELAYS, LOGISTICAL PROBLEMS, GENERAL CONTRACTOR OR BUILDING OWNER REQUIREMENTS, ETC.) PREVENT EMPLOYEES FROM WORKING ON ONE OR MORE DAYS DURING THE REGULAR WORK WEEK, WORK PERFORMED ON SATURDAY MAY BE PAID AT THE STRAIGHT TIME RATES.
AW
INCLUDES SMOHIT AND SHC. EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AX
INCLUDES AN AMOUNT FOR PENSION WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AY
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 7 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AZ
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
BA
INCLUDES SHC. EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
BB
RATE APPLIES TO FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY DURING THE EMPLOYEES NORMAL WORKING HOURS. ALL OTHER OVERTIME HOURS SHALL BE PAID AT THE SUNDAY AND HOLIDAY DOUBLE TIME RATE.
BC
INCLUDES AN AMOUNT FOR PENSION FACTORED AT THE OVERTIME MULTIPLIER RATE.
BD
INCLUDES $0.05 FOR SCHOLAR FUND.
BE
THE RATIO OF TERRAZZO FINISHER HOURS TO TERRAZZO WORKER HOURS SHALL NOT EXCEED TWO (2) TO ONE (1).
BF
INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
BG
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF, WHICH IS FACTORED IN THE OVERTIME RATES. ANY EMPLOYEE WORKING UNDERGROUND SHALL RECEIVE $1.00 PER HOUR IN ADDITION TO REGULAR WAGES.
BH
RATE APPLIES TO FIRST YEAR OF EMPLOYMENT ONLY; $0.88 AFTER 2 YEARS OF EMPLOYMENT.
BI
RATE APPLIES TO ALL TIME WORKED IN EXCESS OF 8 HOURS PER DAY OR 40 HOURS PER WEEK AND FOR ALL HOURS ON SUNDAYS AND HOLIDAYS. RATE DOES NOT INCLUDE ANY ADDITIONAL AMOUNT THAT MAY BE REQUIRED FOR VACATION/HOLIDAY PAYMENT.
BJ
RATE APPLIES TO FIRST YEAR OF EMPLOYMENT ONLY; $0.72 AFTER 2 YEARS OF EMPLOYMENT.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH THE DIRECTOR OF INDUSTRIAL RELATIONS. IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE. YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

TRAVEL AND/OR SUBSISTENCE: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH WORKER TO EXECUTE THE WORK. YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

Return to main page