GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: LAKE COUNTY

DETERMINATION: LAK-2020-1

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE BASIC HOURLY RATE BASIC HOURLY RATE FOOTNOTE HEALTH AND WELFARE HEALTH AND WELFARE FOOTNOTE PENSION PENSION FOOTNOTE VACATION/ HOLIDAY VACATION/ HOLIDAY FOOTNOTE TRAINING TRAINING FOOTNOTE OTHER PAYMENTS OTHER PAYMENTS FOOTNOTE HOURS HOURS FOOTNOTE TOTAL HOURLY RATE DAILY OVERTIME HOURLY RATE DAILY OVERTIME HOURLY RATE FOOTNOTE SATURDAY OVERTIME HOURLY RATE SATURDAY OVERTIME HOURLY RATE FOOTNOTE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE FOOTNOTE HOLIDAY PROVISIONS SCOPE OF WORK PROVISIONS TRAVEL & SUBSISTENCE PROVISIONS
#BRICKLAYER, BLOCKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON 08/22/2019 04/30/2020** $42.920 A $10.200 $14.270 $3.000 B $0.800 $1.860 C 8 D $73.050 $96.010 E $96.010 E $118.970 HolidaysScope of WorkTravel & Subsistence
BRICKLAYER, BLOCKLAYER: POINTER, CLEANER, CAULKER, WATERPROOFER 08/22/2019 06/30/2020** $51.210 A $10.200 $12.580 $0.000 F $1.560 $0.430 8 D $75.980 $101.580 $101.580 G $127.190 HolidaysScope of WorkTravel & Subsistence
#BRICK TENDER 08/22/2019 06/30/2020** $35.010 H $8.500 $10.890 $0.000 F $0.450 $0.300 8 $55.150 $72.650 I $72.650 I $90.160 HolidaysScope of WorkTravel & Subsistence
#CARPET, LINOLEUM, SOFT FLOOR LAYER 02/22/2020 12/31/2020** $50.350 A $10.450 $17.330 $0.000 J $0.850 $0.340 8 $79.320 $104.490 K $104.490 K $129.670 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, FLOOR COVERING HANDLER AFTER 3 YEARS 02/22/2020 12/31/2020** $25.150 A $10.450 $8.670 $0.000 J $0.050 $0.340 8 $44.660 $57.230 K $57.230 K $69.810 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, FLOOR COVERING HANDLER TRAINEE, FIRST 3 MONTHS 02/22/2020 12/31/2020** $16.080 A $10.450 $5.550 $0.000 J $0.050 $0.340 8 $32.470 $40.510 K $40.510 K $48.550 HolidaysScope of WorkTravel & Subsistence
CARPET, LINOLEUM, FLOOR COVERING HANDLER TRAINEE, SECOND 3 MONTHS 02/22/2020 12/31/2020** $18.090 A $10.450 $6.230 $0.000 J $0.050 $0.340 8 $35.160 $44.210 K $44.210 K $53.250 HolidaysScope of WorkTravel & Subsistence
#ELECTRICIAN: COMM & SYSTEM INSTALLER 02/22/2020 11/30/2020** $35.250 $11.550 $7.150 L $0.000 $1.100 $0.260 M 8 $56.550 $74.790 N $74.790 N $93.040 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: COMM & SYSTEM TECH. 02/22/2020 11/30/2020** $40.540 $11.550 $7.150 L $0.000 $1.100 $0.260 M 8 $62.020 $82.990 N $82.990 N $103.970 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: INSIDE WIREMAN 08/22/2019 05/31/2020** $51.400 A $12.500 $7.500 O $0.000 $1.290 $0.310 P 8 $74.800 $101.400 Q $101.400 Q $127.990 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: CABLE SPLICER 08/22/2019 05/31/2020** $56.540 A $12.500 $7.500 O $0.000 $1.290 $0.310 P 8 $80.120 $109.380 Q $109.380 Q $138.640 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: TUNNEL WIREMAN 08/22/2019 05/31/2020** $51.900 A $12.500 $7.500 O $0.000 $1.290 $0.310 P 8 $75.320 $102.170 R $129.030 $129.030 HolidaysScope of WorkTravel & Subsistence
ELECTRICIAN: TUNNEL CABLE SPLICER 08/22/2019 05/31/2020** $57.040 A $12.500 $7.500 O $0.000 $1.290 $0.310 P 8 $80.640 $110.150 R $139.670 $139.670 HolidaysScope of WorkTravel & Subsistence
FIELD SURVEYOR: CHIEF OF PARTY (018.167-010) S 02/22/2020 03/31/2020* $21.880 & $4.200 $4.100 $2.500 $0.000 $0.000 8 $32.680 $43.620 $43.620 $54.560 HolidaysScope of WorkTravel & Subsistence
FIELD SURVEYOR: CHAINMAN/RODMAN (869.567-010) S 02/22/2020 03/31/2020* $15.640 & $4.200 $4.100 $2.500 $0.000 $0.000 8 $26.440 $34.260 $34.260 $42.080 HolidaysScope of WorkTravel & Subsistence
GLAZIER 02/22/2020 03/31/2020* $13.000 & $0.000 $0.000 $0.190 $0.000 $0.000 8 $13.190 $19.690 $19.690 $19.690 HolidaysScope of WorkTravel & Subsistence
#MARBLE FINISHER T 02/22/2020 07/31/2020** $35.410 U $10.200 $5.280 $0.000 J $0.450 $0.850 8 $52.190 $69.890 V $87.600 $87.600 HolidaysScope of WorkTravel & Subsistence
#MARBLE MASON T 02/22/2020 07/31/2020** $49.420 U $10.200 $16.080 $0.000 J $0.800 $1.160 8 $77.660 $102.370 V $127.080 $127.080 HolidaysScope of WorkTravel & Subsistence
#PAINTER: BRUSH AND SPRAY W 02/22/2020 06/30/2020* $43.620 H $10.450 $13.820 X $0.000 J $0.760 $0.380 8 D $69.030 $90.840 $90.840 Y $112.650 HolidaysScope of WorkTravel & Subsistence
PAINTER: METALIZING AND THERMAL SPRAY W 02/22/2020 06/30/2020* $47.620 H $10.450 $13.820 X $0.000 J $0.760 $0.380 8 D $73.030 $96.840 $96.840 Y $120.650 HolidaysScope of WorkTravel & Subsistence
PAINTER: INDUSTRIAL PAINTER Z 02/22/2020 06/30/2020* $45.120 H $10.450 $13.820 X $0.000 J $0.760 $0.380 8 D $70.530 $93.090 $93.090 Y $115.650 HolidaysScope of WorkTravel & Subsistence
PAINTER: SANDBLASTER, STEAM CLEANER, WATERBLASTER W 02/22/2020 06/30/2020* $44.120 H $10.450 $13.820 X $0.000 J $0.760 $0.380 8 D $69.530 $91.590 $91.590 Y $113.650 HolidaysScope of WorkTravel & Subsistence
PAINTER: EXOTIC MATERIALS W 02/22/2020 06/30/2020* $44.370 H $10.450 $13.820 X $0.000 J $0.760 $0.380 8 D $69.780 $91.960 $91.960 Y $114.150 HolidaysScope of WorkTravel & Subsistence
PAINTER: PAPERHANGER, WALLCOVERING, LEAD ABATEMENT W 02/22/2020 06/30/2020* $44.620 H $10.450 $13.820 X $0.000 J $0.760 $0.380 8 D $70.030 $92.340 $92.340 Y $114.650 HolidaysScope of WorkTravel & Subsistence
PAINTER: TAPER 02/22/2020 12/31/2020** $47.330 AA $10.450 $14.680 $0.000 J $0.860 $0.580 8 $73.900 $97.570 AB $97.570 AB $121.230 Y HolidaysScope of WorkTravel & Subsistence
#PLASTERER 08/22/2019 06/30/2020** $36.840 AC $13.580 $15.970 $3.500 $1.180 $1.200 8 $72.270 $89.620 $89.620 AD $106.970 HolidaysScope of WorkTravel & Subsistence
#PLASTER TENDER 08/22/2019 06/30/2020** $32.770 $8.500 $12.800 $3.250 $0.450 $1.110 AE 8 $58.880 $75.260 K $75.260 K $91.650 HolidaysScope of WorkTravel & Subsistence
#PLUMBER: PLUMBER, STEAMFITTER 08/22/2019 06/30/2020** $74.160 AF $16.560 $20.830 $0.000 F $3.600 $2.550 AG 8 $117.700 $154.780 AH $154.780 AI $191.860 HolidaysScope of WorkTravel & Subsistence
PLUMBER: PLUMBING SERVICE AND REPAIR, LIGHT COMMERCIAL 08/22/2019 06/30/2020** $63.040 AF $15.840 $18.650 $0.000 F $2.100 $1.280 AG 8 $100.910 $132.430 AH $132.430 AI $163.950 HolidaysScope of WorkTravel & Subsistence
PLUMBER: REFRIGERATION FITTER (HVAC) 08/22/2019 06/30/2020** $74.160 AF $16.560 $20.830 $0.000 F $3.600 $2.550 AG 8 $117.700 $154.780 AH $154.780 AI $191.860 HolidaysScope of WorkTravel & Subsistence
PLUMBER: AIR CONDITIONING & REFRIGERATION/HVAC - SERVICE WORK 08/22/2019 06/30/2020** $74.160 AF $16.560 $20.830 $0.000 F $3.600 $2.550 AG 8 $117.700 $154.780 AH $154.780 AI $191.860 HolidaysScope of WorkTravel & Subsistence
PLUMBER: LANDSCAPE/IRRIGATION PIPEFITTER 08/22/2019 06/30/2020** $63.040 A $15.840 $13.690 AJ $0.000 F $1.360 $0.790 8 $94.720 $126.240 $126.240 AD $157.760 HolidaysScope of WorkTravel & Subsistence
PLUMBER: UNDERGROUND/UTILITY PIPEFITTER 08/22/2019 06/30/2020** $63.040 A $15.840 $13.690 AJ $0.000 F $1.360 $0.790 8 $94.720 $126.240 $126.240 AD $157.760 HolidaysScope of WorkTravel & Subsistence
PLUMBER: FIRE SPRINKLER FITTER (PROTECTION AND CONTROL SYSTEMS, OVERHEAD AND UNDERGROUND) 02/22/2020 03/31/2020** $40.870 $10.230 $13.590 AK $0.000 $0.520 $0.250 8 $65.460 $85.900 $85.900 $106.330 HolidaysScope of WorkTravel & Subsistence
ROOFER 02/22/2020 03/31/2020* $13.000 & $1.840 $1.200 $0.500 $0.100 $0.000 8 $16.640 $23.140 $23.140 $23.140 HolidaysScope of WorkTravel & Subsistence
#SHEET METAL WORKER 08/22/2019 06/28/2020** $61.360 H $14.600 AL $29.440 AM $0.000 F $1.530 $0.710 8 $107.640 $141.730 Q $141.730 Q $175.820 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER TOTAL SHEET METAL CONTRACT OF $200000 OR LESS 08/22/2019 06/28/2020** $53.670 H $14.600 AL $27.950 AM $0.000 F $1.530 $0.710 8 $98.460 $128.270 Q $128.270 Q $158.090 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER SERVICE MECHANIC (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2019 06/28/2020** $42.250 H $14.000 AN $15.480 AM $0.000 F $1.430 $0.710 8 $73.870 $96.250 AO $96.250 AO $118.620 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER SERVICE TECHNICIAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2019 06/28/2020** $38.040 H $14.000 AN $10.210 AM $0.000 F $1.430 $0.710 8 $64.390 $84.210 AO $84.210 AO $104.030 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER AIR CONDITIONING SPECIALIST (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2019 06/28/2020** $33.510 H $14.000 AN $4.870 AM $0.000 F $1.410 $0.710 8 $54.500 $71.780 Q $71.780 Q $89.050 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER AIR CONDITIONING JOURNEYMAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) 08/22/2019 06/28/2020** $39.280 H $14.000 AL $10.490 AM $0.000 F $1.410 $0.710 8 $65.890 $86.280 Q $86.280 Q $106.670 HolidaysScope of WorkTravel & Subsistence
SHEET METAL WORKER METAL DECK & SIDING 08/22/2019 06/30/2020* $42.330 H $14.580 AJ $20.400 AP $0.000 F $0.320 AQ $0.000 8 $77.630 $99.790 Q $99.790 Q $121.960 HolidaysScope of WorkTravel & Subsistence
#TERRAZZO FINISHER AR 08/22/2018 06/30/2019* $36.180 AS $9.950 $5.740 $0.000 F $0.800 $0.920 8 $53.590 $69.440 Q $69.440 Q $85.290 HolidaysScope of WorkTravel & Subsistence
#TERRAZZO WORKER AR 08/22/2018 06/30/2019* $45.900 AS $9.950 $15.040 $0.000 F $0.800 $1.110 8 $72.800 $92.810 Q $92.810 Q $112.820 HolidaysScope of WorkTravel & Subsistence
#TILE FINISHER 02/22/2020 03/31/2020** $27.060 AT $9.810 $4.760 $1.000 $0.790 $1.010 8 $44.430 $57.960 $57.960 D $71.490 HolidaysScope of WorkTravel & Subsistence
TILE FINISHER RED CIRCLED FINISHER 02/22/2020 03/31/2020** $30.490 AT $9.810 $6.040 $1.500 $0.790 $1.070 8 $49.700 $64.940 $64.940 D $80.190 HolidaysScope of WorkTravel & Subsistence
#TILE SETTER 02/22/2020 03/31/2020** $44.270 AT $9.810 $7.460 $2.500 $1.120 $1.690 8 $66.850 $88.990 $88.990 D $111.120 HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER DRILLER, PUMP REPAIRMAN 08/22/2007 01/31/2008* $20.170 $8.120 $3.690 $0.800 AU $0.000 $0.000 8 $32.780 $42.870 AV $42.870 AV $42.870 AV HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER PUMP INSTALLER 08/22/2007 01/31/2008* $17.860 $8.120 $3.690 $0.720 AW $0.000 $0.000 8 $30.390 $39.320 AV $39.320 AV $39.320 AV HolidaysScope of WorkTravel & Subsistence
WATER WELL DRILLER HELPER 08/22/2007 01/31/2008* $12.470 $8.120 $3.690 $0.530 AX $0.000 $0.000 8 $24.810 $31.040 AV $31.040 AV $31.040 AV HolidaysScope of WorkTravel & Subsistence

Go to increase page

FOOTNOTES

*
EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
#
INDICATES AN APPRENTICEABLE CRAFT. THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @ HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.
&
THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.
A
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
B
VACATION IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER
C
INCLUDES AMOUNT FOR INDUSTRY PROMOTION FUND, INTERNATIONAL MASONRY INSTITUTE, LABOR MANAGEMENT COOPERATION COMMITTEE, AND VACATION TRUST FUND.
D
SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
E
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
F
INCLUDED IN STRAIGHT-TIME HOURLY RATE.
G
RATE APPLIES TO THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
H
INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
I
RATE APPLIES TO FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWNDURING THE NORMAL WORK WEEK DUE TO INCLEMENT WEATHER.
J
INCLUDED IN BASIC HOURLY RATE.
K
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
L
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD.
M
IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES.
N
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
O
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
P
IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE FOR ADMINISTRATIVE MAINTENANCE FUND IS ADDED TO THE TOTAL HOURLY RATE AND IS FACTORED INTO THE OVERTIME HOURLY RATE.
Q
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
R
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS WORKED; ALL OTHER OVERTIME IS PAID AT THE SATURDAY, SUNDAY AND HOLIDAY OVERTIME RATE.
S
DICTIONARY OF OCCUPATIONAL TITLES, FOURTH EDITION, 1977, U.S. DEPARTMENT OF LABOR.
T
EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFFOLD SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.
U
INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.
V
RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
W
EMPLOYEES SHALL BE ENTITLED TO HIGH TIME PREMIUM WHENEVER THE WORK PERFORMED REQUIRES PERSONAL FALL RESTRAINTS TO BE WORN BY THE EMPLOYEE. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $2.00 PER HOUR ABOVE BASIC HOURLY RATE WHEN WORKING OVER 50 FEET ABOVE GROUND OR WATER LEVEL, $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET AND $6.00 PER HOUR WHEN WORKING OVER 180 FEET. EMPLOYEES SHALL BE ENTITLED TO $3.00 PER HOUR ABOVE THE BASIC HOURLY RATE WHEN PERFORMING WORK FROM OR TO A SUSPENDED PLATFORM SUCH AS SAFESPAN, QUICKDECK OR COMPARABLE PLATFORM SYSTEMS ON BRIDGE AND OVERPASS TYPE WORK.
X
INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
Y
DESIGNATED DAYS OFF SHALL BE PAID AT THE SATURDAY OVERTIME RATE; PLEASE REFER TO THE HOLIDAY PROVISIONS FOR A LIST OF DESIGNATED DAYS OFF.
Z
EMPLOYEES SHALL BE ENTITLED TO HIGH TIME PREMIUM WHENEVER THE WORK PERFORMED REQUIRES PERSONAL FALL RESTRAINTS TO BE WORN BY THE EMPLOYEE. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET ABOVE GROUND OR WATER LEVEL AND $6.00 PER HOUR WHEN WORKING OVER 180 FEET. EMPLOYEES SHALL BE ENTITLED TO $3.00 PER HOUR ABOVE THE BASIC HOURLY RATE WHEN PERFORMING WORK FROM OR TO A SUSPENDED PLATFORM SUCH AS SAFESPAN, QUICKDECK OR COMPARABLE PLATFORM SYSTEMS ON BRIDGE AND OVERPASS TYPE WORK.
AA
INCLUDES AMOUNTS FOR VACATION AND DUES CHECK OFF
AB
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
AC
INCLUDES AN AMOUNT WITHHELD FOR DUES CHECK OFF WHICH IS NOT FACTORED INTO OVERTIME AND HOLIDAY WAGE RATES. EMPLOYEES OPERATING AND WORKING BEHIND PLASTER GUNS SHALL RECEIVE AN ADDITIONAL $5.00 PER DAY.
AD
RATE APPLIES TO THE FIRST 8 HOURS WORKED; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AE
AMOUNT IS FOR VALLEY MORTAR TRADES FUND AND INDUSTRY STABILIZATION FUND
AF
INCLUDES AN AMOUNT FOR VACATION/HOLIDAY.
AG
INCLUDES FUNDS FOR SUB/JURY DUTY, CRAFT, CONTRACT ADMINISTRATION/HIRING HALL, JURISDICTIONAL PROTECTION AND SCHOLARSHIP.
AH
RATE APPLIES TO THE FIRST 2 OVERTIME HOURS ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AI
RATE APPLIES TO THE FIRST 10 HOURS WORKED ON SATURDAY. ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
AJ
PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AK
INCLUDES AN AMOUNT FOR SUPPLEMENTAL PENSION FUND.
AL
INCLUDES SMOHIT AND SHC. EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AM
INCLUDES AN AMOUNT FOR PENSION WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AN
INCLUDES SHC. EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AO
RATE APPLIES TO FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY DURING THE EMPLOYEES NORMAL WORKING HOURS. ALL OTHER OVERTIME HOURS SHALL BE PAID AT THE SUNDAY AND HOLIDAY DOUBLE TIME RATE.
AP
INCLUDES AN AMOUNT FOR PENSION FACTORED AT THE OVERTIME MULTIPLIER RATE.
AQ
INCLUDES $0.05 FOR SCHOLAR FUND.
AR
THE RATIO OF TERRAZZO FINISHER HOURS TO TERRAZZO WORKER HOURS SHALL NOT EXCEED TWO (2) TO ONE (1).
AS
INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
AT
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF, WHICH IS FACTORED IN THE OVERTIME RATES. ANY EMPLOYEE WORKING UNDERGROUND SHALL RECEIVE $1.00 PER HOUR IN ADDITION TO REGULAR WAGES.
AU
RATE APPLIES TO FIRST TWO YEARS OF EMPLOYMENT ONLY; $1.35 AFTER 2 YEARS; $1.45 AFTER 5 YEARS; $1.60 AFTER 10 YEARS
AV
COMPUTATION IS BASED ON THE LOWEST VACATION AMOUNT. THESE RATES SHOULD BE INCREASED BY ANY ADDITIONAL VACATION/HOLIDAY PAY THAT IS REQUIRED.
AW
RATE APPLIES TO FIRST TWO YEARS OF EMPLOYMENT ONLY; $1.27 AFTER 2 YEARS; $1.37 AFTER 5 YEARS; $1.52 AFTER 10 YEARS.
AX
RATE APPLIES TO FIRST TWO YEARS OF EMPLOYMENT ONLY; $1.08 AFTER 2 YEARS; $1.18 AFTER 5 YEARS; $1.33 AFTER 10 YEARS.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH THE DIRECTOR OF INDUSTRIAL RELATIONS. IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE. YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

TRAVEL AND/OR SUBSISTENCE: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH WORKER TO EXECUTE THE WORK. YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

Return to main page