GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: TULARE COUNTY

DETERMINATION: TUL-2019-2

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE DATE OF NEXT INCREASE 1 AMOUNT OF INCREASE 1 INCREASE FOOTNOTE 1 DATE OF NEXT INCREASE 2 AMOUNT OF INCREASE 2 INCREASE FOOTNOTE 2 DATE OF NEXT INCREASE 3 AMOUNT OF INCREASE 3 INCREASE FOOTNOTE 3 DATE OF NEXT INCREASE 4 AMOUNT OF INCREASE 4 INCREASE FOOTNOTE 4
BRICKLAYER, STONEMASON, MARBLE MASON, CEMENT BLOCKLAYER, POINTER, CAULKER, CLEANER 08/22/2019 04/30/2020** 05/01/2020 $1.960 A
ELECTRICIAN: INSIDE WIREMAN, TECHNICIAN 08/22/2019 02/29/2020** 03/01/2020 $1.000 A 09/01/2020 $1.000 A 03/01/2021 $1.000 A
ELECTRICIAN: CABLE SPLICER 08/22/2019 02/29/2020** 03/01/2020 $1.000 A 09/01/2020 $1.000 A 03/01/2021 $1.000 A
FIELD SURVEYOR: CHIEF OF PARTY B 02/22/2019 02/29/2020** 03/01/2020 $3.000 A
FIELD SURVEYOR: INSTRUMENTMAN B 02/22/2019 02/29/2020** 03/01/2020 $3.000 A
FIELD SURVEYOR: CHAINMAN/RODMAN B 02/22/2019 02/29/2020** 03/01/2020 $3.000 A
PAINTER TAPER 02/22/2019 12/31/2019** 01/01/2020 $4.000 A 01/01/2021 $4.000 A 01/01/2022 $4.000 A
PAINTER: C 02/22/2019 12/31/2019** 01/01/2020 $1.500 A 07/01/2020 $0.500 A
PAINTER: PAPERHANGER, SPRAY PAINTER C 02/22/2019 12/31/2019** 01/01/2020 $1.500 A 07/01/2020 $0.500 A
PAINTER: SANDBLASTER, LEAD ABATEMENT C 02/22/2019 12/31/2019** 01/01/2020 $1.500 A 07/01/2020 $0.500 A
PAINTER: REMEDIAL PATCHER C 02/22/2019 12/31/2019** 01/01/2020 $1.500 A 07/01/2020 $0.500 A
PAINTER: INDUSTRIAL PAINTER C 02/22/2019 12/31/2019** 01/01/2020 $1.750 D 07/01/2020 $0.500 A
PAINTER: METALIZING AND THERMAL SPRAY C 02/22/2019 12/31/2019** 01/01/2020 $2.500 E 07/01/2020 $0.500 A
PLASTERER 08/22/2019 06/30/2020** 07/01/2020 $2.750 A
PLASTER TENDER 08/22/2019 06/30/2020** 07/01/2020 $2.750 A 07/01/2021 $2.750 A 07/01/2022 $2.750 A
PLUMBER: PLUMBER, STEAMFITTER, REFRIGERATION FITTER (HVAC) 08/22/2019 12/31/2019** 01/01/2020 $1.500 A 07/01/2020 $1.500 A 01/01/2021 $1.750 A 07/01/2021 $1.750 A
PLUMBER: UNDERGROUND UTILITY PIPEFITTER 08/22/2019 06/30/2020** 07/01/2020 $1.500 F 07/01/2021 $1.500 F
PLUMBER: LANDSCAPE PIPEFITTER 08/22/2019 06/30/2020** 07/01/2020 $1.500 F 07/01/2021 $1.500 F
PLUMBER: UNDERGROUND UTILITY ASSISTANT JOURNEYMAN G 08/22/2019 06/30/2020** 07/01/2020 $1.000 H 07/01/2021 $1.000 H
PLUMBER: LANDSCAPE ASSISTANT JOURNEYMAN I 08/22/2019 06/30/2020** 07/01/2020 $1.000 H 07/01/2021 $1.000 H
PLUMBER: UNDERGROUND UTILITY TRADESMAN J 08/22/2019 06/30/2020** 07/01/2020 $1.000 H 07/01/2021 $1.000 H
PLUMBER: LANDSCAPE TRADESMAN I K 08/22/2019 06/30/2020** 07/01/2020 $1.000 H 07/01/2021 $1.000 H
PLUMBER: LANDSCAPE TRADESMAN II K 08/22/2019 06/30/2020** 07/01/2020 $1.000 H 07/01/2021 $1.000 H
ROOFER 02/22/2019 12/31/2019** 01/01/2020 $1.100 A 01/01/2021 $1.100 A
TILE FINISHER 08/22/2019 03/31/2020** 04/01/2020 $1.840 A
TILE SETTER 08/22/2019 03/31/2020** 04/01/2020 $3.000 A

Return to wage page

FOOTNOTES

**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
A
THE PREDETERMINED INCREASE SHOWN IS TO BE ALLOCATED TO WAGES AND/OR EMPLOYER PAYMENTS. PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 WHEN THE PREDETERMINED INCREASE BECOMES DUE TO CONFIRM THE DISTRIBUTION. PLEASE ALSO EXAMINE THE IMPORTANT NOTICES TO SEE IF ANY MODIFICATIONS HAVE BEEN ISSUED, AS THERE MAY BE REDUCTIONS TO PREDETERMINED INCREASES.
B
ALL CREWS, WITHOUT CONSIDERATION TO THE NUMBER OF INDIVIDUALS IN THE CREW, SHALL INCLUDE A CHIEF OF PARTY. A CREW CONSISTS OF ONE (1) OR MORE EMPLOYEES PERFORMING FIELD AND CONSTRUCTION SURVEY WORK.
C
EMPLOYEES SHALL BE ENTITLED TO HIGH TIME PREMIUM. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $1.00 PER HOUR ABOVE THE BASIC HOURLY RATE WHEN WORKING OVER 30 FEET (EXCLUDING WORK FROM A LIFT 60 FEET AND LOWER). EMPLOYEES SHALL BE ENTITLED TO $2.00 PER HOUR ABOVE THE BASIC HOURLY RATE WHEN PERFORMING WORK FROM OR TO A SUSPENDED PLATFORM SUCH AS SAFESPAN, QUICKDECK OR COMPARABLE PLATFORM SYSTEMS ON BRIDGE AND OVERPASS TYPE WORK.
D
$0.25 TO BASIC HOURLY RATE AND $1.50 TO BE ALLOCATED TO WAGES AND/OR EMPLOYER PAYMENTS. PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 WHEN THE PREDETERMINED INCREASE BECOMES DUE TO CONFIRM THE DISTRIBUTION. PLEASE ALSO EXAMINE THE IMPORTANT NOTICES TO SEE IF ANY MODIFICATIONS HAVE BEEN ISSUED, AS THERE MAY BE REDUCTIONS TO PREDETERMINED INCREASES.
E
$1.00 TO BASIC HOURLY RATE AND $1.50 TO BE ALLOCATED TO WAGES AND/OR EMPLOYER PAYMENTS. PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 WHEN THE PREDETERMINED INCREASE BECOMES DUE TO CONFIRM THE DISTRIBUTION. PLEASE ALSO EXAMINE THE IMPORTANT NOTICES TO SEE IF ANY MODIFICATIONS HAVE BEEN ISSUED, AS THERE MAY BE REDUCTIONS TO PREDETERMINED INCREASES.
F
$1.00 TO BASIC HOURLY RATE AND $0.50 TO HEALTH AND WELFARE
G
THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE.
H
$0.50 TO BASIC HOURLY RATE AND $0.50 TO HEALTH AND WELFARE.
I
THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE. THIS AGREEMENT MAY BE USED TO COVER MAINTENANCE AND PLANT ESTABLISHMENT. PLANT ESTABLISHMENT SHALL BE WORK COVERED BY THIS AGREEMENT. THIS WORK MAY BE PERFORMED EXCLUSIVELY BY ALL CLASSIFICATIONS OUTLINED IN THIS AGREEMENT WITHOUT THE SUPERVISION OF A JOURNEYMAN, EXCEPT FOR APPRENTICES WHO REQUIRE THE SUPERVISION OF A JOURNEYMAN.
J
THERE SHALL BE NO MORE THAN THREE TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON EACH JOBSITE.
K
THERE SHALL BE NO MORE THAN FOUR TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON EACH JOBSITE. THIS AGREEMENT MAY BE USED TO COVER MAINTENANCE AND PLANT ESTABLISHMENT. PLANT ESTABLISHMENT SHALL BE WORK COVERED BY THIS AGREEMENT. THIS WORK MAY BE PERFORMED EXCLUSIVELY BY ALL CLASSIFICATIONS OUTLINED IN THIS AGREEMENT WITHOUT THE SUPERVISION OF A JOURNEYMAN, EXCEPT FOR APPRENTICES WHO REQUIRE THE SUPERVISION OF A JOURNEYMAN

Return to main page