GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: SAN MATEO COUNTY

DETERMINATION: SMA-2019-1

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE DATE OF NEXT INCREASE 1 AMOUNT OF INCREASE 1 INCREASE FOOTNOTE 1 DATE OF NEXT INCREASE 2 AMOUNT OF INCREASE 2 INCREASE FOOTNOTE 2 DATE OF NEXT INCREASE 3 AMOUNT OF INCREASE 3 INCREASE FOOTNOTE 3 DATE OF NEXT INCREASE 4 AMOUNT OF INCREASE 4 INCREASE FOOTNOTE 4
BRICKLAYER, BLOCKLAYER, POINTER, CLEANER, CAULKER, WATERPROOFER (2ND SHIFT) 02/22/2019 06/30/2019** 07/01/2019 $2.500 A 07/01/2020 $2.500 A 07/01/2021 $2.500 A 07/01/2022 $2.500 A
BRICKLAYER, BLOCKLAYER, POINTER, CLEANER, CAULKER, WATERPROOFER (3RD SHIFT) 02/22/2019 06/30/2019** 07/01/2019 $2.500 A 07/01/2020 $2.500 A 07/01/2021 $2.500 A 07/01/2022 $2.500 A
ELECTRICIAN: INSIDE WIREMAN, TECHNICIAN SECOND SHIFT 08/22/2018 05/31/2019** 06/01/2019 $5.000 A 06/01/2020 $5.000 A
ELECTRICIAN: INSIDE WIREMAN, TECHNICIAN THIRD SHIFT 08/22/2018 05/31/2019** 06/01/2019 $5.000 A 06/01/2020 $5.000 A
ELECTRICIAN: CABLE SPLICER SECOND SHIFT 08/22/2018 05/31/2019** 06/01/2019 $5.000 A 06/01/2020 $5.000 A
ELECTRICIAN: CABLE SPLICER THIRD SHIFT 08/22/2018 05/31/2019** 06/01/2019 $5.000 A 06/01/2020 $5.000 A
FIELD SURVEYOR: CHIEF OF PARTY (NIGHT SHIFT) B 02/22/2019 02/29/2020** 03/01/2020 $3.000 A
FIELD SURVEYOR: INSTRUMENTMAN (NIGHT SHIFT) B 02/22/2019 02/29/2020** 03/01/2020 $3.000 A
FIELD SURVEYOR: CHAINMAN/RODMAN (NIGHT SHIFT) B 02/22/2019 02/29/2020** 03/01/2020 $3.000 A
PLASTERER PLASTERER: 2ND SHIFT 02/22/2019 06/30/2019** 07/01/2019 $2.750 A 07/01/2020 $2.750 A
PLASTERER PLASTERER: 3RD SHIFT 02/22/2019 06/30/2019** 07/01/2019 $2.750 A 07/01/2020 $2.750 A
SHEET METAL WORKER SHEET METAL WORKER (SPECIAL SHIFT) 08/22/2018 06/30/2019** 07/01/2019 $3.250 A 06/29/2020 $3.250 A 06/28/2021 $3.500 A
SHEET METAL WORKER SHEET METAL WORKER (2ND SHIFT) 08/22/2018 06/30/2019** 07/01/2019 $3.250 A 06/29/2020 $3.250 A 06/28/2021 $3.500 A
SHEET METAL WORKER SHEET METAL WORKER (3RD SHIFT) 08/22/2018 06/30/2019** 07/01/2019 $3.250 A 06/29/2020 $3.250 A 06/28/2021 $3.250 A
SHEET METAL WORKER TOTAL SHEET METAL CONTRACT OF $200000 OR LESS (SPECIAL SHIFT) 08/22/2018 06/30/2019** 07/01/2019 $2.750 A 06/29/2020 $2.750 A 06/28/2021 $3.000 A
SHEET METAL WORKER TOTAL SHEET METAL CONTRACT OF $200000 OR LESS (2ND SHIFT) 08/22/2018 06/30/2019** 07/01/2019 $2.750 A 06/29/2020 $2.750 A 06/28/2021 $3.000 A
SHEET METAL WORKER TOTAL SHEET METAL CONTRACT OF $200000 OR LESS (3RD SHIFT) 08/22/2018 06/30/2019** 07/01/2019 $2.750 A 06/29/2020 $2.750 A 06/28/2021 $3.000 A
SHEET METAL WORKER SERVICE MECHANIC (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (SPECIAL SHIFT) 02/22/2019 06/30/2019** 07/01/2019 $1.950 A 06/29/2020 $1.950 A 06/28/2021 $2.100 A
SHEET METAL WORKER SERVICE MECHANIC (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (2ND SHIFT) 08/22/2018 06/30/2019** 07/01/2019 $1.950 A 06/29/2020 $1.950 A 06/28/2021 $2.100 A
SHEET METAL WORKER SERVICE MECHANIC (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (3RD SHIFT) 02/22/2019 06/30/2019** 07/01/2019 $1.950 A 06/29/2020 $1.950 A 06/28/2021 $2.100 A
SHEET METAL WORKER SERVICE TECHNICIAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (SPECIAL SHIFT) 08/22/2018 06/30/2019** 07/01/2019 $1.790 A 06/29/2020 $1.790 A 06/28/2021 $1.930 A
SHEET METAL WORKER SERVICE TECHNICIAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (2ND SHIFT) 08/22/2018 06/30/2019** 07/01/2019 $1.790 A 06/29/2020 $1.790 A 06/28/2021 $1.930 A
SHEET METAL WORKER SERVICE TECHNICIAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (3RD SHIFT) 08/22/2018 06/30/2019** 07/01/2019 $1.790 A 06/29/2020 $1.790 A 06/28/2021 $1.930 A
SHEET METAL WORKER AIR CONDITIONING SPECIALIST (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (SPECIAL SHIFT) 08/22/2018 06/30/2019** 07/01/2019 $1.460 A 06/29/2020 $1.460 A 06/28/2021 $1.580 A
SHEET METAL WORKER AIR CONDITIONING SPECIALIST (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (2ND SHIFT) 08/22/2018 06/30/2019** 07/01/2019 $1.460 A 06/29/2020 $1.460 A 06/28/2021 $1.580 A
SHEET METAL WORKER AIR CONDITIONING SPECIALIST (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (3RD SHIFT) 08/22/2018 06/30/2019** 07/01/2019 $1.460 A 06/29/2020 $1.460 A 06/28/2021 $1.580 A
SHEET METAL WORKER AIR CONDITIONING JOURNEYMAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (SPECIAL SHIFT) 08/22/2018 06/30/2019** 07/01/2019 $1.790 A 06/29/2020 $1.790 A 06/28/2021 $1.930 A
SHEET METAL WORKER AIR CONDITIONING JOURNEYMAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (2ND SHIFT) 08/22/2018 06/30/2019** 07/01/2019 $1.790 A 06/29/2020 $1.790 A 06/28/2021 $1.930 A
SHEET METAL WORKER AIR CONDITIONING JOURNEYMAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (3RD SHIFT) 08/22/2018 06/30/2019** 07/01/2019 $1.790 A 06/29/2020 $1.790 A 06/28/2021 $1.930 A

Return to wage page

FOOTNOTES

**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
A
THE PREDETERMINED INCREASE SHOWN IS TO BE ALLOCATED TO WAGES AND/OR EMPLOYER PAYMENTS. PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 WHEN THE PREDETERMINED INCREASE BECOMES DUE TO CONFIRM THE DISTRIBUTION. PLEASE ALSO EXAMINE THE IMPORTANT NOTICES TO SEE IF ANY MODIFICATIONS HAVE BEEN ISSUED, AS THERE MAY BE REDUCTIONS TO PREDETERMINED INCREASES.
B
ALL CREWS, WITHOUT CONSIDERATION TO THE NUMBER OF INDIVIDUALS IN THE CREW, SHALL INCLUDE A CHIEF OF PARTY. A CREW CONSISTS OF ONE (1) OR MORE EMPLOYEES PERFORMING FIELD AND CONSTRUCTION SURVEY WORK.

Return to main page