GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: LAKE COUNTY

DETERMINATION: LAK-2019-1

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE DATE OF NEXT INCREASE 1 AMOUNT OF INCREASE 1 INCREASE FOOTNOTE 1 DATE OF NEXT INCREASE 2 AMOUNT OF INCREASE 2 INCREASE FOOTNOTE 2 DATE OF NEXT INCREASE 3 AMOUNT OF INCREASE 3 INCREASE FOOTNOTE 3 DATE OF NEXT INCREASE 4 AMOUNT OF INCREASE 4 INCREASE FOOTNOTE 4
BRICKLAYER, BLOCKLAYER, POINTER, CLEANER, CAULKER, WATERPROOFER (2ND SHIFT) 02/22/2019 06/30/2019** 07/01/2019 $2.500 A 07/01/2020 $2.500 A 07/01/2021 $2.500 A 07/01/2022 $2.500 A
BRICKLAYER, BLOCKLAYER, POINTER, CLEANER, CAULKER, WATERPROOFER (3RD SHIFT) 02/22/2019 06/30/2019** 07/01/2019 $2.500 A 07/01/2020 $2.500 A 07/01/2021 $2.500 A 07/01/2022 $2.500 A
BRICK TENDER: BRICK TENDER (SPECIAL SINGLE SHIFT) 08/22/2018 06/30/2019** 07/01/2019 $1.200 A
ELECTRICIAN: INSIDE WIREMAN, 2ND SHIFT 08/22/2018 05/31/2019** 06/01/2019 $3.000 A 06/01/2020 $3.000 A
ELECTRICIAN: INSIDE WIREMAN, 3RD SHIFT 08/22/2018 05/31/2019** 06/01/2019 $3.000 A 06/01/2020 $3.000 A
ELECTRICIAN: CABLE SPLICER, 2ND SHIFT 08/22/2018 05/31/2019** 06/01/2019 $3.000 A 06/01/2020 $3.000 A
ELECTRICIAN: CABLE SPLICER, 3RD SHIFT 08/22/2018 05/31/2019** 06/01/2019 $3.000 A 06/01/2020 $3.000 A
ELECTRICIAN: TUNNEL WIREMAN SECOND SHIFT 08/22/2018 05/31/2019** 06/01/2019 $3.000 A 06/01/2020 $3.000 A
ELECTRICIAN: TUNNEL WIREMAN THIRD SHIFT 08/22/2018 05/31/2019** 06/01/2019 $3.000 A 06/01/2020 $3.000 A
ELECTRICIAN: TUNNEL CABLE SPLICER SECOND SHIFT 08/22/2018 05/31/2019** 06/01/2019 $3.000 A 06/01/2020 $3.000 A
ELECTRICIAN: TUNNEL CABLE SPLICER THIRD SHIFT 08/22/2018 05/31/2019** 06/01/2019 $3.000 A 06/01/2020 $3.000 A
SHEET METAL WORKER SHEET METAL WORKER (SPECIAL SHIFT) 08/22/2018 06/30/2019** 07/01/2019 $3.250 A 06/29/2020 $3.250 A 06/28/2021 $3.500 A
SHEET METAL WORKER SHEET METAL WORKER (2ND SHIFT) 08/22/2018 06/30/2019** 07/01/2019 $3.250 A 06/29/2020 $3.250 A 06/28/2021 $3.500 A
SHEET METAL WORKER SHEET METAL WORKER (3RD SHIFT) 08/22/2018 06/30/2019** 07/01/2019 $3.250 A 06/29/2020 $3.250 A 06/28/2021 $3.250 A
SHEET METAL WORKER TOTAL SHEET METAL CONTRACT OF $200000 OR LESS (SPECIAL SHIFT) 08/22/2018 06/30/2019** 07/01/2019 $2.750 A 06/29/2020 $2.750 A 06/28/2021 $3.000 A
SHEET METAL WORKER TOTAL SHEET METAL CONTRACT OF $200000 OR LESS (2ND SHIFT) 08/22/2018 06/30/2019** 07/01/2019 $2.750 A 06/29/2020 $2.750 A 06/28/2021 $3.000 A
SHEET METAL WORKER TOTAL SHEET METAL CONTRACT OF $200000 OR LESS (3RD SHIFT) 08/22/2018 06/30/2019** 07/01/2019 $2.750 A 06/29/2020 $2.750 A 06/28/2021 $3.000 A
SHEET METAL WORKER SERVICE MECHANIC (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (SPECIAL SHIFT) 02/22/2019 06/30/2019** 07/01/2019 $1.950 A 06/29/2020 $1.950 A 06/28/2021 $2.100 A
SHEET METAL WORKER SERVICE MECHANIC (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (2ND SHIFT) 08/22/2018 06/30/2019** 07/01/2019 $1.950 A 06/29/2020 $1.950 A 06/28/2021 $2.100 A
SHEET METAL WORKER SERVICE MECHANIC (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (3RD SHIFT) 02/22/2019 06/30/2019** 07/01/2019 $1.950 A 06/29/2020 $1.950 A 06/28/2021 $2.100 A
SHEET METAL WORKER SERVICE TECHNICIAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (SPECIAL SHIFT) 08/22/2018 06/30/2019** 07/01/2019 $1.790 A 06/29/2020 $1.790 A 06/28/2021 $1.930 A
SHEET METAL WORKER SERVICE TECHNICIAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (2ND SHIFT) 08/22/2018 06/30/2019** 07/01/2019 $1.790 A 06/29/2020 $1.790 A 06/28/2021 $1.930 A
SHEET METAL WORKER SERVICE TECHNICIAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (3RD SHIFT) 08/22/2018 06/30/2019** 07/01/2019 $1.790 A 06/29/2020 $1.790 A 06/28/2021 $1.930 A
SHEET METAL WORKER AIR CONDITIONING SPECIALIST (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (SPECIAL SHIFT) 08/22/2018 06/30/2019** 07/01/2019 $1.460 A 06/29/2020 $1.460 A 06/28/2021 $1.580 A
SHEET METAL WORKER AIR CONDITIONING SPECIALIST (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (2ND SHIFT) 08/22/2018 06/30/2019** 07/01/2019 $1.460 A 06/29/2020 $1.460 A 06/28/2021 $1.580 A
SHEET METAL WORKER AIR CONDITIONING SPECIALIST (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (3RD SHIFT) 08/22/2018 06/30/2019** 07/01/2019 $1.460 A 06/29/2020 $1.460 A 06/28/2021 $1.580 A
SHEET METAL WORKER AIR CONDITIONING JOURNEYMAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (SPECIAL SHIFT) 08/22/2018 06/30/2019** 07/01/2019 $1.790 A 06/29/2020 $1.790 A 06/28/2021 $1.930 A
SHEET METAL WORKER AIR CONDITIONING JOURNEYMAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (2ND SHIFT) 08/22/2018 06/30/2019** 07/01/2019 $1.790 A 06/29/2020 $1.790 A 06/28/2021 $1.930 A
SHEET METAL WORKER AIR CONDITIONING JOURNEYMAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (3RD SHIFT) 08/22/2018 06/30/2019** 07/01/2019 $1.790 A 06/29/2020 $1.790 A 06/28/2021 $1.930 A

Return to wage page

FOOTNOTES

**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
A
THE PREDETERMINED INCREASE SHOWN IS TO BE ALLOCATED TO WAGES AND/OR EMPLOYER PAYMENTS. PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 WHEN THE PREDETERMINED INCREASE BECOMES DUE TO CONFIRM THE DISTRIBUTION. PLEASE ALSO EXAMINE THE IMPORTANT NOTICES TO SEE IF ANY MODIFICATIONS HAVE BEEN ISSUED, AS THERE MAY BE REDUCTIONS TO PREDETERMINED INCREASES.

Return to main page