GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: SAN LUIS OBISPO COUNTY

DETERMINATION: SLO-2019-1

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE DATE OF NEXT INCREASE 1 AMOUNT OF INCREASE 1 INCREASE FOOTNOTE 1 DATE OF NEXT INCREASE 2 AMOUNT OF INCREASE 2 INCREASE FOOTNOTE 2 DATE OF NEXT INCREASE 3 AMOUNT OF INCREASE 3 INCREASE FOOTNOTE 3 DATE OF NEXT INCREASE 4 AMOUNT OF INCREASE 4 INCREASE FOOTNOTE 4 DATE OF NEXT INCREASE 5 AMOUNT OF INCREASE 5 INCREASE FOOTNOTE 5 DATE OF NEXT INCREASE 6 AMOUNT OF INCREASE 6 INCREASE FOOTNOTE 6 DATE OF NEXT INCREASE 7 AMOUNT OF INCREASE 7 INCREASE FOOTNOTE 7
BRICKLAYER, STONEMASON, CEMENT BLOCKLAYER, POINTER, CAULKER, CLEANER 08/22/2018 04/30/2019** 05/01/2019 $2.250 A 05/01/2020 $2.100 A
BRICK TENDER B 08/22/2018 06/30/2019** 07/01/2019 $1.600 A 07/01/2020 $1.550 A
BRICK TENDER: FORKLIFT OPERATOR 08/22/2018 06/30/2019** 07/01/2019 $1.600 A 07/01/2020 $1.550 A
DRYWALL FINISHER DRYWALL FINISHER 02/22/2019 09/30/2019** 10/01/2019 $2.400 A
ELECTRICIAN: INSIDE WIREMAN, TECHNICIAN 02/22/2019 12/31/2019** 01/01/2020 $2.250 A 01/01/2021 $2.500 A
ELECTRICIAN: CABLE SPLICER 02/22/2019 12/31/2019** 01/01/2020 $2.250 A 01/01/2021 $2.500 A
GLAZIER C 02/22/2019 12/31/2019** 01/01/2020 $2.500 A 01/01/2021 $2.000 A
MARBLE FINISHER 08/22/2018 05/31/2019** 06/01/2019 $1.850 A
PAINTER INDUSTRIAL PAINTER D 08/22/2018 06/30/2019** 07/01/2019 $2.650 E 07/01/2020 $2.650 F
PAINTER: PAINTER, LEAD ABATEMENT D 08/22/2018 06/30/2019** 07/01/2019 $2.150 G 07/01/2020 $2.150 H
PAINTER: REPAINT PAINTER, LEAD ABATEMENT D 08/22/2018 06/30/2019** 07/01/2019 $2.150 G 07/01/2020 $2.150 H
PAINTER: INDUSTRIAL REPAINT PAINTER D 08/22/2018 06/30/2019** 07/01/2019 $2.650 E 07/01/2020 $2.650 F
PLASTERER 08/22/2018 08/06/2019** 08/07/2019 $2.050 A 08/05/2020 $2.200 A 08/04/2021 $2.200 A
PLASTER TENDER I 02/22/2019 08/06/2019** 08/07/2019 $2.050 A 08/05/2020 $2.200 A 08/04/2021 $2.200 A
PLASTER TENDER PLASTER CLEAN-UP LABORER 02/22/2019 08/06/2019** 08/07/2019 $2.050 A 08/05/2020 $2.200 A 08/04/2021 $2.200 A
PLUMBER: PLUMBER, INDUSTRIAL AND GENERAL PIPEFITTER 08/22/2018 08/31/2019** 09/01/2019 $2.010 A 09/01/2020 $2.010 A 09/01/2021 $2.260 A 09/01/2022 $2.260 A 09/01/2023 $2.350 A 09/01/2024 $2.500 A 09/01/2025 $2.500 A
PLUMBER: SEWER AND STORM DRAIN PIPELAYER 08/22/2018 08/31/2019** 09/01/2019 $2.010 A 09/01/2020 $2.010 A 09/01/2021 $2.260 A 09/01/2022 $2.260 A 09/01/2023 $2.350 A 09/01/2024 $2.500 A 09/01/2025 $2.500 A
PLUMBER: SEWER AND STORM DRAIN PIPE TRADESMAN J 08/22/2018 08/31/2019** 09/01/2019 $0.800 A 09/01/2020 $0.800 A 09/01/2021 $0.900 A 09/01/2022 $0.900 A 09/01/2023 $0.940 A 09/01/2024 $1.000 A 09/01/2025 $1.000 A
PLUMBER: SERVICE AND REPAIR 08/22/2018 08/31/2019** 09/01/2019 $2.010 A 09/01/2020 $2.010 A 09/01/2021 $2.260 A 09/01/2022 $2.260 A 09/01/2023 $2.350 A 09/01/2024 $2.500 A 09/01/2025 $2.500 A
PLUMBER: LANDSCAPE/IRRIGATION FITTER 08/22/2018 08/31/2019** 09/01/2019 $2.010 A 09/01/2020 $2.010 A 09/01/2021 $2.260 A 09/01/2022 $2.260 A 09/01/2023 $2.350 A 09/01/2024 $2.500 A 09/01/2025 $2.500 A
PLUMBER: LANDSCAPE/IRRIGATION TRADESMAN K 08/22/2018 08/31/2019** 09/01/2019 $0.520 A 09/01/2020 $0.520 A 09/01/2021 $0.590 A 09/01/2022 $0.590 A 09/01/2023 $0.610 A 09/01/2024 $0.650 A 09/01/2025 $0.650 A
PLUMBER: REFRIGERATION SERVICE HVACR 02/22/2019 08/31/2019** 09/01/2019 $2.150 A 09/01/2020 $2.150 A 09/01/2021 $2.150 A 09/01/2022 $2.150 A 09/01/2023 $2.150 A
SHEET METAL WORKER (HVAC) 08/22/2018 07/31/2019** 08/01/2019 $2.550 L 08/01/2020 $2.550 M 08/01/2021 $2.750 N 08/01/2022 $2.750 O
TILE FINISHER 08/22/2018 05/31/2019** 06/01/2019 $1.850 A
TILE LAYER 08/22/2018 05/31/2019** 06/01/2019 $2.150 A

Return to wage page

FOOTNOTES

**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
A
THE PREDETERMINED INCREASE SHOWN IS TO BE ALLOCATED TO WAGES AND/OR EMPLOYER PAYMENTS. PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 WHEN THE PREDETERMINED INCREASE BECOMES DUE TO CONFIRM THE DISTRIBUTION. PLEASE ALSO EXAMINE THE IMPORTANT NOTICES TO SEE IF ANY MODIFICATIONS HAVE BEEN ISSUED, AS THERE MAY BE REDUCTIONS TO PREDETERMINED INCREASES.
B
THE RATIO OF BRICK TENDERS TO BRICKLAYERS SHALL BE AS FOLLOWS: ONE (1) BRICK TENDER TO NO MORE THAN THREE (3) BRICKLAYERS DURING THE INSTALLATION OF BLOCK ON A TYPICAL MASONRY PROJECT.
C
CERTIFIED MANIPULATOR WORK SHALL RECEIVE $1.25 PER HOUR ABOVE THE BASIC WAGE RATE
D
AN ADDITIONAL $0.25 PER HOUR WILL BE ADDED TO THE BASIC HOURLY RATE WHEN PERFORMING PAPERHANGING WORK.
E
$1.50 TO THE BASIC HOURLY RATE, $0.05 TO HEALTH & WELFARE, $1.00 TO PENSION AND $0.10 TO OTHER.
F
$1.50 TO THE BASIC HOURLY RATE, $0.90 TO PENSION AND $0.25 TO WAGES AND/OR FRINGES.
G
$1.00 TO THE BASIC HOURLY RATE, $0.05 TO HEALTH & WELFARE, $1.00 TO PENSION AND $0.10 TO OTHER.
H
$1.00 TO THE BASIC HOURLY RATE, $0.90 TO PENSION AND $0.25 TO WAGES AND/OR FRINGES.
I
THE RATIO OF PLASTER TENDERS TO PLASTERERS SHALL BE AS FOLLOWS: THERE SHALL BE A PLASTER TENDER ON THE JOBSITE WHENEVER THERE IS A PLASTERER PERFORMING WORK ON THE JOBSITE, EXCEPT ON SMALL PATCH WORK WHERE ONLY ONE PLASTERER IS PERFORMING WORK. FOR INSIDE BROWN COATINGS THERE SHALL BE 2 PLASTER TENDERS FOR UP TO EVERY 3 PLASTERERS. FOR INSIDE FINISH COATINGS THERE SHALL BE 1 PLASTER TENDER FOR UP TO EVERY 3 PLASTERERS. ON OUTSIDE FINISH AND BROWN COATINGS AND FOR ALL OTHER WORK, THERE SHALL BE 1 PLASTER TENDER FOR UP TO EVERY 2 PLASTERERS.
J
PIPE TRADESMEN SHALL NOT BE PERMITTED ON ANY JOB WITHOUT A JOURNEYMAN.
K
TRADESMEN SHALL ONLY BE USED IF THE FIRST WORKER ON THE JOB IS A LANDSCAPE/IRRIGATION FITTER, SECOND WORKER MUST BE A LANDSCAPE/IRRIGATION FITTER OR APPRENTICE LANDSCAPE/IRRIGATION FITTER. THE 3RD AND 4TH MAY BE A TRADESMAN. THE 5TH MUST BE A LANDSCAPE/IRRIGATION FITTER AND THEREAFTER TRADESMEN WILL BE REFERRED ON A 50-50 BASIS, TO JOURNEYMAN OR APPRENTICE.
L
$0.05 TO TRAINING, $0.25 TO PENSION, $0.05 TO OTHER, AND $2.20 TO WAGES AND/OR FRINGES.
M
$0.01 TO OTHER, $0.25 TO PENSION, $0.05 TO OTHER, AND $2.24 TO WAGES AND/OR FRINGES.
N
$0.05 TO TRAINING AND $2.70 TO WAGES AND/OR FRINGES.
O
$0.01 TO OTHER AND $2.74 TO WAGES AND/OR FRINGES.

Return to main page