GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: DEL NORTE COUNTY

DETERMINATION: DEL-2019-1

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE BASIC HOURLY RATE BASIC HOURLY RATE FOOTNOTE HEALTH AND WELFARE HEALTH AND WELFARE FOOTNOTE PENSION PENSION FOOTNOTE VACATION/ HOLIDAY VACATION/ HOLIDAY FOOTNOTE TRAINING TRAINING FOOTNOTE OTHER PAYMENTS OTHER PAYMENTS FOOTNOTE HOURS HOURS FOOTNOTE TOTAL HOURLY RATE DAILY OVERTIME HOURLY RATE DAILY OVERTIME HOURLY RATE FOOTNOTE SATURDAY OVERTIME HOURLY RATE SATURDAY OVERTIME HOURLY RATE FOOTNOTE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE FOOTNOTE HOLIDAY PROVISIONS SCOPE OF WORK PROVISIONS TRAVEL & SUBSISTENCE PROVISIONS SHIFT PROVISIONS
#BRICKLAYER, BLOCKLAYER, POINTER, CLEANER, CAULKER, WATERPROOFER (2ND SHIFT) 02/22/2019 06/30/2019** $56.960 A $9.950 $12.040 $0.000 B $1.530 $0.430 8 C $80.910 $109.390 $109.390 D $137.870 HolidaysScope of WorkTravel & SubsistenceShift
BRICKLAYER, BLOCKLAYER, POINTER, CLEANER, CAULKER, WATERPROOFER (3RD SHIFT) 02/22/2019 06/30/2019** $59.440 A $9.950 $12.040 $0.000 B $1.530 $0.430 8 C $83.390 $113.110 $113.110 D $142.830 HolidaysScope of WorkTravel & SubsistenceShift
#BRICKLAYER, BLOCKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON (2ND SHIFT) 08/22/2018 04/30/2019* $45.280 A $9.950 $14.230 $3.000 E $0.800 $1.380 F 8 C $74.640 $98.780 G $98.780 G $122.920 HolidaysScope of WorkTravel & SubsistenceShift
BRICKLAYER, BLOCKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON (3RD SHIFT) 08/22/2018 04/30/2019* $47.470 A $9.950 $14.230 $3.000 E $0.800 $1.380 F 8 C $76.830 $102.070 G $102.070 G $127.300 HolidaysScope of WorkTravel & SubsistenceShift
#BRICK TENDER: BRICK TENDER (SPECIAL SINGLE SHIFT) 08/22/2018 06/30/2019** $37.270 H $8.250 $10.680 $0.000 B $0.450 $0.300 8 C $56.950 $75.580 G $75.580 G $94.220 HolidaysScope of WorkTravel & SubsistenceShift
#ELECTRICIAN: COMM & SYSTEM INSTALLER, SECOND SHIFT 02/22/2019 11/30/2019* $36.950 $11.050 $6.400 I $0.000 $1.100 $0.260 J 7.5 $57.050 $76.170 K $76.170 K $95.290 L HolidaysScope of WorkTravel & SubsistenceShift
ELECTRICIAN: COMM & SYSTEM INSTALLER, THIRD SHIFT 02/22/2019 11/30/2019* $38.630 $11.050 $6.400 I $0.000 $1.100 $0.260 J 7 $58.790 $78.780 K $78.780 K $98.770 L HolidaysScope of WorkTravel & SubsistenceShift
ELECTRICIAN: COMM & SYSTEM TECH., SECOND SHIFT 02/22/2019 11/30/2019* $42.490 $11.050 $6.400 I $0.000 $1.100 $0.260 J 7.5 $62.780 $84.770 K $84.770 K $106.760 L HolidaysScope of WorkTravel & SubsistenceShift
ELECTRICIAN: COMM & SYSTEM TECH., THIRD SHIFT 02/22/2019 11/30/2019* $44.420 $11.050 $6.400 I $0.000 $1.100 $0.260 J 7 $64.780 $87.770 K $87.770 K $110.760 L HolidaysScope of WorkTravel & SubsistenceShift
ELECTRICIAN: INSIDE WIREMAN, 2ND SHIFT 08/22/2018 05/31/2019** $56.770 A $12.500 $7.500 M $0.000 $1.180 $0.310 N 8 $80.240 $109.620 O $109.620 P $139.000 Q HolidaysScope of WorkTravel & SubsistenceShift
ELECTRICIAN: INSIDE WIREMAN, 3RD SHIFT 08/22/2018 05/31/2019** $63.600 A $12.500 $7.500 M $0.000 $1.180 $0.310 N 8 $87.320 $120.230 O $120.230 P $153.150 Q HolidaysScope of WorkTravel & SubsistenceShift
ELECTRICIAN: CABLE SPLICER, 2ND SHIFT 08/22/2018 05/31/2019** $62.450 A $12.500 $7.500 M $0.000 $1.180 $0.310 N 8 $86.120 $118.440 O $118.440 P $150.760 Q HolidaysScope of WorkTravel & SubsistenceShift
ELECTRICIAN: CABLE SPLICER, 3RD SHIFT 08/22/2018 05/31/2019** $69.960 A $12.500 $7.500 M $0.000 $1.180 $0.310 N 8 $93.900 $130.100 O $130.100 P $166.310 Q HolidaysScope of WorkTravel & SubsistenceShift
ELECTRICIAN: TUNNEL WIREMAN SECOND SHIFT 08/22/2018 05/31/2019** $57.360 A $12.500 $7.500 M $0.000 $1.180 $0.310 N 8 $80.860 $110.550 R $140.230 S $140.230 L HolidaysScope of WorkTravel & SubsistenceShift
ELECTRICIAN: TUNNEL WIREMAN THIRD SHIFT 08/22/2018 05/31/2019** $64.250 A $12.500 $7.500 M $0.000 $1.180 $0.310 N 8 $87.990 $121.240 R $154.490 S $154.490 L HolidaysScope of WorkTravel & SubsistenceShift
ELECTRICIAN: TUNNEL CABLE SPLICER SECOND SHIFT 08/22/2018 05/31/2019** $63.040 A $12.500 $7.500 M $0.000 $1.180 $0.310 N 8 $86.730 $119.350 R $151.970 S $151.970 L HolidaysScope of WorkTravel & SubsistenceShift
ELECTRICIAN: TUNNEL CABLE SPLICER THIRD SHIFT 08/22/2018 05/31/2019** $70.610 A $12.500 $7.500 M $0.000 $1.180 $0.310 N 8 $94.570 $131.110 R $167.650 S $167.650 L HolidaysScope of WorkTravel & SubsistenceShift
#FIELD SURVEYOR: CHIEF OF PARTY (NIGHT SHIFT) T 02/22/2019 02/29/2020** $50.660 $13.880 $11.510 U $4.330 V $1.120 $0.210 7 $81.710 $107.040 W $107.040 X $132.370 L HolidaysScope of WorkTravel & SubsistenceShift
FIELD SURVEYOR: INSTRUMENTMAN (NIGHT SHIFT) T 02/22/2019 02/29/2020** $47.180 $13.880 $11.510 U $4.330 V $1.120 $0.210 7 $78.230 $101.820 W $101.820 X $125.410 L HolidaysScope of WorkTravel & SubsistenceShift
FIELD SURVEYOR: CHAINMAN/RODMAN (NIGHT SHIFT) T 02/22/2019 02/29/2020** $43.940 $13.880 $11.510 U $4.330 V $1.120 $0.210 7 $74.990 $96.960 W $96.960 X $118.930 L HolidaysScope of WorkTravel & SubsistenceShift
#MARBLE FINISHER MARBLE FINISHER (2ND SHIFT) Y 08/22/2018 07/31/2019* $39.250 Z $9.950 $4.860 $0.000 AA $0.450 $0.830 8 $55.340 $74.960 AB $94.590 $94.590 HolidaysScope of WorkTravel & SubsistenceShift
#MARBLE MASON MARBLE MASON (2ND SHIFT) Y 08/22/2018 07/31/2019* $53.030 Z $9.950 $16.040 $0.000 AA $0.800 $1.090 8 $80.910 $107.430 AB $133.940 $133.940 HolidaysScope of WorkTravel & SubsistenceShift
#PLUMBER: PLUMBER, PIPEFITTER (2ND SHIFT) 08/22/2018 03/31/2019** $49.320 A $15.010 $13.000 AC $0.000 B $1.550 $0.260 7.5 AD $79.140 $103.800 AE $103.800 AE $128.460 HolidaysScope of WorkTravel & SubsistenceShift
PLUMBER: PLUMBER, PIPEFITTER (3RD SHIFT) 08/22/2018 03/31/2019** $49.320 A $15.010 $13.000 AC $0.000 B $1.550 $0.260 7 AF $79.140 $103.800 AE $103.800 AE $128.460 HolidaysScope of WorkTravel & SubsistenceShift
#SHEET METAL WORKER SHEET METAL WORKER (SPECIAL SHIFT) 08/22/2018 06/30/2019** $66.200 H $14.400 AG $28.690 AH $0.000 B $1.480 $0.710 8 $111.480 $147.870 AI $147.870 AI $184.250 HolidaysScope of WorkTravel & SubsistenceShift
SHEET METAL WORKER SHEET METAL WORKER (2ND SHIFT) 08/22/2018 06/30/2019** $65.020 H $14.400 AG $28.690 AH $0.000 B $1.480 $0.710 7.5 AJ $110.300 $146.100 AI $146.100 AI $181.890 HolidaysScope of WorkTravel & SubsistenceShift
SHEET METAL WORKER SHEET METAL WORKER (3RD SHIFT) 08/22/2018 06/30/2019** $67.980 H $14.400 AG $28.690 AH $0.000 B $1.480 $0.710 7 AK $113.260 $150.540 AI $150.540 AI $187.810 HolidaysScope of WorkTravel & SubsistenceShift
SHEET METAL WORKER TOTAL SHEET METAL CONTRACT OF $200000 OR LESS (SPECIAL SHIFT) 08/22/2018 06/30/2019** $58.090 H $14.400 AG $27.250 AH $0.000 B $1.480 $0.710 8 $101.930 $133.860 AI $133.860 AI $165.780 HolidaysScope of WorkTravel & SubsistenceShift
SHEET METAL WORKER TOTAL SHEET METAL CONTRACT OF $200000 OR LESS (2ND SHIFT) 08/22/2018 06/30/2019** $57.060 H $14.400 AG $27.250 AH $0.000 B $1.480 $0.710 7.5 AJ $100.900 $132.320 AI $132.320 AI $163.720 HolidaysScope of WorkTravel & SubsistenceShift
SHEET METAL WORKER TOTAL SHEET METAL CONTRACT OF $200000 OR LESS (3RD SHIFT) 08/22/2018 06/30/2019** $59.650 H $14.400 AG $27.250 AH $0.000 B $1.480 $0.710 7 AK $103.490 $136.200 AI $136.200 AI $168.900 HolidaysScope of WorkTravel & SubsistenceShift
SHEET METAL WORKER SERVICE MECHANIC (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (SPECIAL SHIFT) 02/22/2019 06/30/2019** $45.640 H $13.800 AL $15.280 AH $0.000 B $1.380 $0.710 8 $76.810 $100.890 AM $100.890 AM $124.950 HolidaysScope of WorkTravel & SubsistenceShift
SHEET METAL WORKER SERVICE MECHANIC (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (2ND SHIFT) 08/22/2018 06/30/2019** $44.830 H $13.800 AL $15.280 AH $0.000 B $1.380 $0.710 7.5 AJ $76.000 $99.670 AM $99.670 AM $123.330 HolidaysScope of WorkTravel & SubsistenceShift
SHEET METAL WORKER SERVICE MECHANIC (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (3RD SHIFT) 02/22/2019 06/30/2019** $46.860 H $13.800 AL $15.280 AH $0.000 B $1.380 $0.710 7 AK $78.030 $102.720 AM $102.720 AM $127.390 HolidaysScope of WorkTravel & SubsistenceShift
SHEET METAL WORKER SERVICE TECHNICIAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (SPECIAL SHIFT) 08/22/2018 06/30/2019** $41.100 H $13.800 AL $10.010 AH $0.000 B $1.380 $0.710 8 $67.000 $88.350 AM $88.350 AM $109.700 HolidaysScope of WorkTravel & SubsistenceShift
SHEET METAL WORKER SERVICE TECHNICIAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (2ND SHIFT) 08/22/2018 06/30/2019** $40.370 H $13.800 AL $10.010 AH $0.000 B $1.380 $0.710 7.5 AJ $66.270 $87.260 AM $87.260 AM $108.240 HolidaysScope of WorkTravel & SubsistenceShift
SHEET METAL WORKER SERVICE TECHNICIAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (3RD SHIFT) 08/22/2018 06/30/2019** $42.210 H $13.800 AL $10.010 AH $0.000 B $1.380 $0.710 7 AK $68.110 $90.020 AM $90.020 AM $111.920 HolidaysScope of WorkTravel & SubsistenceShift
SHEET METAL WORKER AIR CONDITIONING SPECIALIST (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (SPECIAL SHIFT) 08/22/2018 06/30/2019** $36.310 H $13.800 AL $4.750 AH $0.000 B $1.360 $0.710 8 $56.930 $75.600 AI $75.600 AI $94.260 HolidaysScope of WorkTravel & SubsistenceShift
SHEET METAL WORKER AIR CONDITIONING SPECIALIST (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (2ND SHIFT) 08/22/2018 06/30/2019** $35.660 H $13.800 AL $4.750 AH $0.000 B $1.360 $0.710 7.5 AJ $56.280 $74.620 AI $74.620 AI $92.960 HolidaysScope of WorkTravel & SubsistenceShift
SHEET METAL WORKER AIR CONDITIONING SPECIALIST (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (3RD SHIFT) 08/22/2018 06/30/2019** $37.280 H $13.800 AL $4.750 AH $0.000 B $1.360 $0.710 7 AK $57.900 $77.050 AI $77.050 AI $96.200 HolidaysScope of WorkTravel & SubsistenceShift
SHEET METAL WORKER AIR CONDITIONING JOURNEYMAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (SPECIAL SHIFT) 08/22/2018 06/30/2019** $42.490 H $13.800 AG $10.290 AH $0.000 B $1.360 $0.710 8 $68.650 $90.650 AI $90.650 AI $112.640 HolidaysScope of WorkTravel & SubsistenceShift
SHEET METAL WORKER AIR CONDITIONING JOURNEYMAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (2ND SHIFT) 08/22/2018 06/30/2019** $41.730 H $13.800 AG $10.290 AH $0.000 B $1.360 $0.710 7.5 AJ $67.890 $89.510 AI $89.510 AI $111.120 HolidaysScope of WorkTravel & SubsistenceShift
SHEET METAL WORKER AIR CONDITIONING JOURNEYMAN (TOTAL SHEET METAL CONTRACT OF $200000 OR LESS) (3RD SHIFT) 08/22/2018 06/30/2019** $43.630 H $13.800 AG $10.290 AH $0.000 B $1.360 $0.710 7 AK $69.790 $92.360 AI $92.360 AI $114.920 HolidaysScope of WorkTravel & SubsistenceShift
#TERRAZZO FINISHER TERRAZZO FINISHER, 2ND SHIFT AN 08/22/2018 06/30/2019* $41.180 AO $9.950 $5.740 $0.000 B $0.800 $0.920 8 $58.590 $76.940 AI $76.940 AI $95.290 HolidaysScope of WorkTravel & SubsistenceShift
TERRAZZO FINISHER TERRAZZO FINISHER, 3RD SHIFT AN 08/22/2018 06/30/2019* $41.180 AO $9.950 $5.740 $0.000 B $0.800 $0.920 8 $58.590 $76.940 AI $76.940 AI $95.290 HolidaysScope of WorkTravel & SubsistenceShift
#TERRAZZO WORKER TERRAZZO WORKER, 2ND SHIFT AN 08/22/2018 06/30/2019* $53.900 AO $9.950 $15.040 $0.000 B $0.800 $1.110 8 $80.800 $104.810 AI $104.810 AI $128.820 HolidaysScope of WorkTravel & SubsistenceShift
TERRAZZO WORKER TERRAZZO WORKER, 3RD SHIFT AN 08/22/2018 06/30/2019* $53.900 AO $9.950 $15.040 $0.000 B $0.800 $1.110 8 $80.800 $104.810 AI $104.810 AI $128.820 HolidaysScope of WorkTravel & SubsistenceShift
#TILE FINISHER TILE FINISHER, 2ND SHIFT 08/22/2018 03/31/2019* $31.560 AP $9.380 $5.220 $1.000 $0.820 $1.000 8 $48.980 $62.760 $62.760 C $76.540 HolidaysScope of WorkTravel & SubsistenceShift
TILE FINISHER TILE FINISHER - RED CIRCLED FINISHER, 2ND SHIFT 08/22/2018 03/31/2019* $37.440 AP $9.380 $5.840 $1.500 $0.820 $1.070 8 $56.050 $72.770 $72.770 C $89.490 HolidaysScope of WorkTravel & SubsistenceShift
#TILE SETTER TILE SETTER, 2ND SHIFT 08/22/2018 03/31/2019* $50.270 AP $9.380 $7.070 $2.500 $1.170 $1.670 8 $72.060 $94.690 $94.690 C $117.330 HolidaysScope of WorkTravel & SubsistenceShift

Go to increase page

FOOTNOTES

*
EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
#
INDICATES AN APPRENTICEABLE CRAFT. THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @ HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.
&
THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.
A
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
B
INCLUDED IN STRAIGHT-TIME HOURLY RATE.
C
SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
D
RATE APPLIES TO THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
E
VACATION IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER
F
INCLUDES AMOUNT FOR INDUSTRY PROMOTION FUND, INTERNATIONAL MASONRY INSTITUTE, LABOR MANAGEMENT COOPERATION COMMITTEE, AND VACATION TRUST FUND.
G
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
H
INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
I
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD.
J
IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES.
K
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
L
DISREGARD THIS RATE. USE THE SUNDAY AND HOLIDAY NON-SHIFT DIFFERENTIAL RATE FOR THIS CLASSIFICATION AS PUBLISHED IN THE DIRECTOR'S GENERAL PREVAILING WAGE DETERMINATIONS.
M
IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
N
IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE FOR ADMINISTRATIVE MAINTENANCE FUND IS ADDED TO THE TOTAL HOURLY RATE AND IS FACTORED INTO THE OVERTIME HOURLY RATE.
O
ALL OVERTIME WORK REQUIRED AFTER THE COMPLETION OF A REGULAR SHIFT SHALL BE PAID AT ONE-AND-ONE-HALF TIMES THE SHIFT HOURLY RATE.
P
RATE APPLIES TO THE FIRST 8 HOURS WORKED; ALL OTHER TIME IS PAID AT THE SUNDAY & HOLIDAY NON-SHIFT RATE.
Q
DISREGARD THIS RATE. FOR ALL HOURS IN EXCESS OF THE FIRST EIGHT HOURS OF WORK PERFORMED ON SATURDAY AND FOR ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS, USE THE SUNDAY AND HOLIDAY NON-SHIFT DIFFERENTIAL RATE FOR THIS CLASSIFICATION AS PUBLISHED IN THE DIRECTOR'S GENERAL PREVAILING WAGE DETERMINATIONS.
R
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS WORKED; ALL OTHER OVERTIME IS PAID AT THE SATURDAY, SUNDAY AND HOLIDAY OVERTIME RATE.
S
DISREGARD THIS RATE. USE THE SATURDAY NON-SHIFT DIFFERENTIAL RATE FOR THIS CLASSIFICATION AS PUBLISHED IN THE DIRECTOR'S GENERAL PREVAILING WAGE DETERMINATIONS.
T
ALL CREWS, WITHOUT CONSIDERATION TO THE NUMBER OF INDIVIDUALS IN THE CREW, SHALL INCLUDE A CHIEF OF PARTY. A CREW CONSISTS OF ONE (1) OR MORE EMPLOYEES PERFORMING FIELD AND CONSTRUCTION SURVEY WORK.
U
INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
V
INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.
W
DISREGARD THIS RATE. FOR THE FIRST 4 DAILY OVERTIME HOURS, SUNDAY NIGHT THROUGH THURSDAY NIGHT, USE THE DAILY OVERTIME NON-SHIFT DIFFERENTIAL RATE FOR THIS CLASSIFICATION. ALL OTHER OVERTIME IS PAID AT THE SUNDAY AND HOLIDAY NON-SHIFT DIFFERENTIAL RATE. IN THE EVENT IT IS NOT REASONABLY POSSIBLE TO COMPLETE 35 HOURS OF WORK ON A 7 HOUR DAY, SUNDAY NIGHT THROUGH THURSDAY NIGHT, THE BALANCE OF THE 35 HOURS, UP TO 7 HOURS, MAY BE WORKED ON FRIDAY NIGHT AT THE STRAIGHT-TIME RATE.
X
DISREGARD THIS RATE. FOR THE FIRST 12 HOURS OF WORK ON SATURDAY, USE THE SATURDAY NON-SHIFT DIFFERENTIAL RATE. FOR ALL HOURS AFTER THE FIRST 12 HOURS WORKED ON SATURDAY, USE THE SUNDAY AND HOLIDAY NON-SHIFT DIFFERENTIAL RATE.
Y
EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFFOLD SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.
Z
INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.
AA
INCLUDED IN BASIC HOURLY RATE.
AB
RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
AC
PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AD
8 HOURS PAY FOR 7.5 HOURS WORKED AT THE STRAIGHT TIME BASIC HOURLY RATE
AE
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND FIRST 10 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
AF
8 HOURS PAY FOR 7 HOURS WORKED AT THE STRAIGHT TIME BASIC HOURLY RATE.
AG
INCLUDES SMOHIT AND SHC. EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AH
INCLUDES AN AMOUNT FOR PENSION WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AI
RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AJ
8 HOURS PAY AT THE STRAIGHT TIME TOTAL HOURLY RATE FOR 7.5 HOURS WORKED
AK
8 HOURS PAY AT THE STRAIGHT TIME TOTAL HOURLY RATE FOR 7 HOURS WORKED
AL
INCLUDES SHC. EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AM
RATE APPLIES TO FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY DURING THE EMPLOYEES NORMAL WORKING HOURS. ALL OTHER OVERTIME HOURS SHALL BE PAID AT THE SUNDAY AND HOLIDAY DOUBLE TIME RATE.
AN
THE RATIO OF TERRAZZO FINISHER HOURS TO TERRAZZO WORKER HOURS SHALL NOT EXCEED TWO (2) TO ONE (1).
AO
INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
AP
INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF, WHICH IS FACTORED IN THE OVERTIME RATES. INCLUDES AN AMOUNT OF PREMIUM RATE PER HOUR ABOVE THE REGULAR STRAIGHT-TIME RATE, WHICH IS NOT FACTORED IN THE OVERTIME RATES. ANY EMPLOYEE WORKING UNDERGROUND SHALL RECEIVE $1.00 PER HOUR IN ADDITION TO REGULAR WAGES.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH THE DIRECTOR OF INDUSTRIAL RELATIONS. IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE. YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

TRAVEL AND/OR SUBSISTENCE: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH WORKER TO EXECUTE THE WORK. YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

Return to main page