GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: ORANGE COUNTY

DETERMINATION: ORA-2018-1

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE DATE OF NEXT INCREASE 1 AMOUNT OF INCREASE 1 INCREASE FOOTNOTE 1 DATE OF NEXT INCREASE 2 AMOUNT OF INCREASE 2 INCREASE FOOTNOTE 2 DATE OF NEXT INCREASE 3 AMOUNT OF INCREASE 3 INCREASE FOOTNOTE 3 DATE OF NEXT INCREASE 4 AMOUNT OF INCREASE 4 INCREASE FOOTNOTE 4 DATE OF NEXT INCREASE 5 AMOUNT OF INCREASE 5 INCREASE FOOTNOTE 5 DATE OF NEXT INCREASE 6 AMOUNT OF INCREASE 6 INCREASE FOOTNOTE 6 DATE OF NEXT INCREASE 7 AMOUNT OF INCREASE 7 INCREASE FOOTNOTE 7 DATE OF NEXT INCREASE 8 AMOUNT OF INCREASE 8 INCREASE FOOTNOTE 8
BRICKLAYER, STONEMASON, MARBLE MASON, CEMENT BLOCKLAYER, POINTER, CAULKER, CLEANER 08/22/2017 04/30/2018** 05/01/2018 $1.780 A 05/01/2019 $1.880 A 05/01/2020 $1.950 A
BRICK TENDER B 08/22/2017 06/30/2018** 07/01/2018 $1.600 A 07/01/2019 $1.600 A 07/01/2020 $1.550 A
BRICK TENDER: FORKLIFT OPERATOR 08/22/2017 06/30/2018** 07/01/2018 $1.600 A 07/01/2019 $1.600 A 07/01/2020 $1.550 A
CARPET, LINOLEUM, RESILIENT TILE LAYER 08/22/2017 04/30/2018** 05/01/2018 $1.500 C 01/01/2019 $1.500 C
DRYWALL FINISHER DRYWALL FINISHER 02/22/2018 09/30/2018** 10/01/2018 $2.350 D 10/01/2019 $2.400 A
ELECTRICIAN: INSIDE WIREMAN, TECHNICIAN 02/22/2018 08/26/2018** 08/27/2018 $1.000 A 02/25/2019 $0.600 A
ELECTRICIAN: CABLE SPLICER 02/22/2018 08/26/2018** 08/27/2018 $1.000 A 02/25/2019 $0.600 A
ELECTRICIAN: TRANSPORTATION SYSTEMS ELECTRICIAN 02/22/2018 08/26/2018** 08/27/2018 $1.000 A 02/25/2019 $0.600 A
ELECTRICIAN: TRANSPORTATION SYSTEMS ELECTRICIAN (CABLE SPLICING, WELDING AND FIBER OPTIC SPLICING) 02/22/2018 08/26/2018** 08/27/2018 $1.000 A 02/25/2019 $0.600 A
ELECTRICIAN: TRANSPORTATION SYSTEMS TECHNICIAN 02/22/2018 08/26/2018** 08/27/2018 $0.750 A 02/25/2019 $0.450 A
ELECTRICIAN: SOUND INSTALLER 02/22/2018 12/31/2018** 01/01/2019 $2.000 A
FIELD SURVEYOR: CHIEF OF PARTY (018.167-010) E 02/22/2018 09/30/2018** 10/01/2018 $2.300 A
FIELD SURVEYOR: INSTRUMENTMAN (018.167-034) E 02/22/2018 09/30/2018** 10/01/2018 $2.300 A
FIELD SURVEYOR: CHAINMAN/RODMAN (869.567-010) E 02/22/2018 09/30/2018** 10/01/2018 $2.300 A
GLAZIER 02/22/2018 05/31/2018** 06/01/2018 $2.680 F 06/01/2019 $2.770 G 01/01/2020 $-3.460 H
MARBLE FINISHER 08/22/2017 05/31/2018** 06/01/2018 $1.850 A 06/01/2019 $1.850 A
PAINTER INDUSTRIAL PAINTER I 02/22/2018 06/30/2018** 07/01/2018 $1.050 J
PAINTER: PAINTER, LEAD ABATEMENT I 02/22/2018 06/30/2018** 07/01/2018 $0.900 K
PAINTER: REPAINT PAINTER, LEAD ABATEMENT I 02/22/2018 06/30/2018** 07/01/2018 $0.840 L
PAINTER: INDUSTRIAL REPAINT PAINTER I 02/22/2018 06/30/2018** 07/01/2018 $0.980 M
PLUMBER: PLUMBER, INDUSTRIAL AND GENERAL PIPEFITTER 02/22/2018 08/31/2018** 09/01/2018 $2.160 A 09/01/2019 $2.010 A 09/01/2020 $2.010 A 09/01/2021 $2.260 A 09/01/2022 $2.260 A 09/01/2023 $2.350 A 09/01/2024 $2.500 A 09/01/2025 $2.500 A
PLUMBER: SEWER AND STORM DRAIN PIPELAYER 02/22/2018 08/31/2018** 09/01/2018 $2.160 A 09/01/2019 $2.010 A 09/01/2020 $2.010 A 09/01/2021 $2.260 A 09/01/2022 $2.260 A 09/01/2023 $2.350 A 09/01/2024 $2.500 A 09/01/2025 $2.500 A
PLUMBER: SEWER AND STORM DRAIN PIPE TRADESMAN N 08/22/2017 08/31/2018** 09/01/2018 $0.860 A 09/01/2019 $0.800 A 09/01/2020 $0.800 A 09/01/2021 $0.900 A 09/01/2022 $0.900 A 09/01/2023 $0.940 A 09/01/2024 $1.000 A 09/01/2025 $1.000 A
PLUMBER: LANDSCAPE/IRRIGATION FITTER 02/22/2018 08/31/2018** 09/01/2018 $2.160 A 09/01/2019 $2.010 A 09/01/2020 $2.010 A 09/01/2021 $2.260 A 09/01/2022 $2.260 A 09/01/2023 $2.350 A 09/01/2024 $2.500 A 09/01/2025 $2.500 A
PLUMBER: LANDSCAPE/IRRIGATION TRADESMAN O 08/22/2017 08/31/2018** 09/01/2018 $0.560 A 09/01/2019 $0.520 A 09/01/2020 $0.520 A 09/01/2021 $0.590 A 09/01/2022 $0.590 A 09/01/2023 $0.610 A 09/01/2024 $0.650 A 09/01/2025 $0.650 A
PLUMBER: REFRIGERATION SERVICE AND REPAIR (HVACR) 02/22/2018 09/02/2018** 09/03/2018 $2.000 A
PLUMBER: FIRE SPRINKLER FITTER (PROTECTION AND CONTROL SYSTEMS, OVERHEAD AND UNDERGROUND) P 02/22/2018 03/31/2018** 04/01/2018 $1.750 Q 01/01/2019 $0.550 R
PLUMBER: FIRE SPRINKLER FITTER (PROTECTION AND CONTROL SYSTEMS, OVERHEAD AND UNDERGROUND) S 02/22/2018 08/31/2018** 09/01/2018 $3.000 A 01/01/2019 $0.550 R 09/01/2019 $3.000 A
ROOFER 08/22/2017 07/31/2018** 08/01/2018 $1.850 T 08/01/2019 $1.900 U
ROOFER PITCH WORK 08/22/2017 07/31/2018** 08/01/2018 $1.850 T 08/01/2019 $1.900 U
ROOFER PREPARER 08/22/2017 07/31/2018** 08/01/2018 $1.850 T 08/01/2019 $1.900 U
SHEET METAL WORKER 08/22/2017 06/30/2018** 07/01/2018 $2.000 A 07/01/2019 $2.000 A
TERRAZZO FINISHER 08/22/2017 08/31/2018** 09/01/2018 $2.000 A
TERRAZZO WORKER 08/22/2017 08/31/2018** 09/01/2018 $2.000 A
TILE FINISHER 08/22/2017 05/31/2018** 06/01/2018 $1.850 A 06/01/2019 $1.850 A
TILE LAYER 08/22/2017 05/31/2018** 06/01/2018 $2.150 A 06/01/2019 $2.150 A

Return to wage page

FOOTNOTES

**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
A
THE PREDETERMINED INCREASE SHOWN IS TO BE ALLOCATED TO WAGES AND/OR EMPLOYER PAYMENTS. PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 WHEN THE PREDETERMINED INCREASE BECOMES DUE TO CONFIRM THE DISTRIBUTION. PLEASE ALSO EXAMINE THE IMPORTANT NOTICES TO SEE IF ANY MODIFICATIONS HAVE BEEN ISSUED, AS THERE MAY BE REDUCTIONS TO PREDETERMINED INCREASES.
B
THE RATIO OF BRICK TENDERS TO BRICKLAYERS SHALL BE AS FOLLOWS: ONE (1) BRICK TENDER TO NO MORE THAN THREE (3) BRICKLAYERS DURING THE INSTALLATION OF BLOCK ON A TYPICAL MASONRY PROJECT.
C
$1.50 TO THE BASIC HOURLY RATE.
D
$1.60 TO THE BASIC HOURLY RATE, $0.40 TO HEALTH & WELFARE, $0.25 TO PENSION AND $0.10 TO OTHER PAYMENTS.
E
DICTIONARY OF OCCUPATIONAL TITLES, FOURTH EDITION, 1977, U.S. DEPARTMENT OF LABOR.
F
$0.25 TO H&W, $1.10 TO PENSION, $0.08 TO OTHER AND $1.25 TO BE ALLOCATED TO WAGES AND/OR FRINGES.
G
$0.25 TO H&W, $1.10 TO PENSION, $0.17 TO OTHER AND $1.25 TO BE ALLOCATED TO WAGES AND/OR FRINGES.
H
$3.46 DECREASE TO PENSION.
I
AN ADDITIONAL $0.25 PER HOUR WILL BE ADDED TO THE BASIC HOURLY RATE WHEN PERFORMING PAPERHANGING WORK.
J
$0.40 TO HEALTH AND WELFARE AND $0.65 TO WAGES AND/OR FRINGES.
K
$0.40 TO HEALTH AND WELFARE AND $0.50 TO WAGES AND/OR FRINGES.
L
$0.40 TO HEALTH & WELFARE AND $0.44 TO VACATION/HOLIDAY.
M
$0.40 TO HEALTH & WELFARE AND $0.58 TO VACATION/HOLIDAY.
N
PIPE TRADESMEN SHALL NOT BE PERMITTED ON ANY JOB WITHOUT A JOURNEYMAN.
O
TRADESMEN SHALL ONLY BE USED IF THE FIRST WORKER ON THE JOB IS A LANDSCAPE/IRRIGATION FITTER, SECOND WORKER MUST BE A LANDSCAPE/IRRIGATION FITTER OR APPRENTICE LANDSCAPE/IRRIGATION FITTER. THE 3RD AND 4TH MAY BE A TRADESMAN. THE 5TH MUST BE A LANDSCAPE/IRRIGATION FITTER AND THEREAFTER TRADESMEN WILL BE REFERRED ON A 50-50 BASIS, TO JOURNEYMAN OR APPRENTICE.
P
RATE APPLIES TO REMAINDER OF COUNTY.
Q
$1.45 TO THE BASIC HOURLY RATE, $0.25 TO PENSION AND $0.05 TO TRAINING.
R
$0.35 TO HEALTH AND WELFARE AND $0.20 TO PENSION.
S
RATE APPLIES TO ORANGE COUNTY, EXCEPT THE FOLLOWING CITIES OR COMMUNITIES: ALISO VIEJO, CAPISTRANO BEACH, COTO DE CAZA, DAINA POINT, EL TOROUSMC AIR STATION, EMERALD BAY, LAGUNA BEACH, LAGUNA HILLS, LAGUNA NIGUEL, LAKE FOREST, LEISURE WORLD (LAGUNA BEACH AREA), MISSION VIEJO, MODJESKA, RANCHO SANTA MARGARITA, SAN CLEMENTE, THREE ARCH BAY, SAN JUAN CAPISTRANO, SAN JUAN HOTSPRINGS, SILVERADO CANYON, SOUTH LAGUNA & TRABUCO CANYON.
T
$1.05 TO BASIC HOURLY RATE, $0.25 TO HEALTH & WELFARE, AND $0.55 TO PENSION
U
$1.40 TO BASIC HOURLY RATE, $0.25 TO HEALTH & WELFARE AND $0.25 TO PENSION

Return to main page