GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: SANTA BARBARA COUNTY

DETERMINATION: STB-2016-2

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE DATE OF NEXT INCREASE 1 AMOUNT OF INCREASE 1 INCREASE FOOTNOTE 1 DATE OF NEXT INCREASE 2 AMOUNT OF INCREASE 2 INCREASE FOOTNOTE 2 DATE OF NEXT INCREASE 3 AMOUNT OF INCREASE 3 INCREASE FOOTNOTE 3 DATE OF NEXT INCREASE 4 AMOUNT OF INCREASE 4 INCREASE FOOTNOTE 4 DATE OF NEXT INCREASE 5 AMOUNT OF INCREASE 5 INCREASE FOOTNOTE 5
BRICK TENDER A 08/22/2016 06/30/2017** 07/01/2017 $1.650 B 07/01/2018 $1.600 B 07/01/2019 $1.600 B 07/01/2020 $1.550 B
BRICK TENDER: FORKLIFT OPERATOR 08/22/2016 06/30/2017** 07/01/2017 $1.650 B 07/01/2018 $1.600 B 07/01/2019 $1.600 B 07/01/2020 $1.550 B
CARPET, LINOLEUM, RESILIENT TILE LAYER 08/22/2016 04/30/2017** 05/01/2017 $1.750 C 05/01/2018 $1.500 D 01/01/2019 $1.500 D
PAINTER INDUSTRIAL PAINTER E 08/22/2016 06/30/2017** 07/01/2017 $0.850 F 01/01/2018 $0.200 G 07/01/2018 $1.050 H
PAINTER: PAINTER, LEAD ABATEMENT E 08/22/2016 06/30/2017** 07/01/2017 $0.700 I 01/01/2018 $0.200 G 07/01/2018 $0.900 J
PAINTER: REPAINT PAINTER, LEAD ABATEMENT E 08/22/2016 06/30/2017** 07/01/2017 $0.700 I 01/01/2018 $0.200 G 07/01/2018 $0.900 J
PAINTER: IRON AND STEEL E 08/22/2016 06/30/2017** 07/01/2017 $0.700 I 01/01/2018 $0.200 G 07/01/2018 $0.900 J
PAINTER: INDUSTRIAL REPAINT PAINTER E 08/22/2016 06/30/2017** 07/01/2017 $0.850 F 01/01/2018 $0.200 G 07/01/2018 $1.050 H
PLASTERER 08/22/2016 08/01/2017** 08/02/2017 $1.750 B
PLASTER TENDER K 08/22/2016 08/01/2017** 08/02/2017 $1.750 B
PLASTER TENDER PLASTER CLEAN-UP LABORER 08/22/2016 08/01/2017** 08/02/2017 $1.750 B
PLUMBER: PLUMBER, INDUSTRIAL AND GENERAL PIPEFITTER 08/22/2016 06/30/2017** 07/01/2017 $2.430 B
PLUMBER: SEWER AND STORM DRAIN PIPELAYER 08/22/2016 06/30/2017** 07/01/2017 $1.870 B
PLUMBER: SEWER AND STORM DRAIN PIPE TRADESMAN L 08/22/2016 06/30/2017** 07/01/2017 $0.970 B
PLUMBER: SERVICE & REPAIR (PLUMBER/HVAC-FITTER) 08/22/2016 06/30/2017** 07/01/2017 $2.430 B
PLUMBER: LANDSCAPE/IRRIGATION FITTER 08/22/2016 06/30/2017** 07/01/2017 $1.820 B
PLUMBER: FIRE SPRINKLER FITTER (PROTECTION AND CONTROL SYSTEMS, OVERHEAD AND UNDERGROUND) 08/22/2016 12/31/2016** 01/01/2017 $0.550 M 04/01/2017 $1.660 N 01/01/2018 $0.700 O 04/01/2018 $1.950 P 01/01/2019 $0.550 Q

Return to wage page

FOOTNOTES

**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
A
THE RATIO OF BRICK TENDERS TO BRICKLAYERS SHALL BE AS FOLLOWS: ONE (1) BRICK TENDER TO NO MORE THAN THREE (3) BRICKLAYERS DURING THE INSTALLATION OF BLOCK ON A TYPICAL MASONRY PROJECT.
B
THE PREDETERMINED INCREASE SHOWN IS TO BE ALLOCATED TO WAGES AND/OR EMPLOYER PAYMENTS. PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 WHEN THE PREDETERMINED INCREASE BECOMES DUE TO CONFIRM THE DISTRIBUTION. PLEASE ALSO EXAMINE THE IMPORTANT NOTICES TO SEE IF ANY MODIFICATIONS HAVE BEEN ISSUED, AS THERE MAY BE REDUCTIONS TO PREDETERMINED INCREASES.
C
$1.25 TO BASIC HOURLY RATE AND $0.50 TO FRINGES
D
$1.50 TO THE BASIC HOURLY RATE.
E
AN ADDITIONAL $0.25 PER HOUR WILL BE ADDED TO THE BASIC HOURLY RATE WHEN PERFORMING PAPERHANGING WORK.
F
$0.20 TO HEALTH AND WELFARE AND $0.65 TO WAGES AND/OR FRINGES.
G
$0.20 TO HEALTH AND WELFARE.
H
$0.40 TO HEALTH AND WELFARE AND $0.65 TO WAGES AND/OR FRINGES.
I
$0.20 TO HEALTH AND WELFARE AND $0.50 TO WAGES AND/OR FRINGES.
J
$0.40 TO HEALTH AND WELFARE AND $0.50 TO WAGES AND/OR FRINGES.
K
THE RATIO OF PLASTER TENDERS TO PLASTERERS SHALL BE AS FOLLOWS: THERE SHALL BE A PLASTER TENDER ON THE JOBSITE WHENEVER THERE IS A PLASTERER PERFORMING WORK ON THE JOBSITE, EXCEPT ON SMALL PATCH WORK WHERE ONLY ONE PLASTERER IS PERFORMING WORK. FOR INSIDE BROWN COATINGS THERE SHALL BE 2 PLASTER TENDERS FOR UP TO EVERY 3 PLASTERERS. FOR INSIDE FINISH COATINGS THERE SHALL BE 1 PLASTER TENDER FOR UP TO EVERY 3 PLASTERERS. ON OUTSIDE FINISH AND BROWN COATINGS AND FOR ALL OTHER WORK, THERE SHALL BE 1 PLASTER TENDER FOR UP TO EVERY 2 PLASTERERS.
L
PIPE TRADESMEN SHALL NOT BE PERMITTED ON ANY JOB WITHOUT A JOURNEYMAN.
M
$0.40 TO HEALTH AND WELFARE AND $0.15 TO PENSION.
N
$1.49 TO THE BASIC HOURLY RATE, $0.15 TO PENSION AND $0.02 TO TRAINING.
O
$0.50 TO HEALTH AND WELFARE AND $0.20 TO PENSION.
P
$1.65 TO THE BASIC HOURLY RATE, $0.25 TO PENSION AND $0.05 TO TRAINING.
Q
$0.35 TO HEALTH AND WELFARE AND $0.20 TO PENSION.