GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: KINGS COUNTY

DETERMINATION: KIN-2016-2

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE DATE OF NEXT INCREASE 1 AMOUNT OF INCREASE 1 INCREASE FOOTNOTE 1 DATE OF NEXT INCREASE 2 AMOUNT OF INCREASE 2 INCREASE FOOTNOTE 2 DATE OF NEXT INCREASE 3 AMOUNT OF INCREASE 3 INCREASE FOOTNOTE 3 DATE OF NEXT INCREASE 4 AMOUNT OF INCREASE 4 INCREASE FOOTNOTE 4 DATE OF NEXT INCREASE 5 AMOUNT OF INCREASE 5 INCREASE FOOTNOTE 5
BRICKLAYER, BLOCKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON 08/22/2016 04/30/2017** 05/01/2017 $1.500 A 05/01/2018 $1.750 A
BRICKLAYER, BLOCKLAYER: POINTER, CLEANER, CAULKER, WATERPROOFER 08/22/2016 06/30/2017** 07/01/2017 $1.700 A
BRICK TENDER 08/22/2016 06/30/2017** 07/01/2017 $1.000 A 07/01/2018 $1.000 A 07/01/2019 $1.200 A
CARPET, LINOLEUM, RESILIENT TILE LAYER 02/22/2016 12/31/2016** 01/01/2017 $1.250 A 01/01/2018 $1.250 A
ELECTRICIAN: COMM & SYSTEM INSTALLER 02/22/2016 11/30/2016** 12/01/2016 $1.760 A
ELECTRICIAN: COMM & SYSTEM TECH. 02/22/2016 11/30/2016** 12/01/2016 $2.000 A
ELECTRICIAN: INSIDE WIREMAN, TECHNICIAN 08/22/2016 02/28/2017** 03/01/2017 $0.770 B 09/01/2017 $0.770 B 03/01/2018 $0.770 B
ELECTRICIAN: CABLE SPLICER 08/22/2016 02/28/2017** 03/01/2017 $0.770 B 09/01/2017 $0.770 B 03/01/2018 $0.770 B
MARBLE FINISHER C 08/22/2016 01/31/2017** 02/01/2017 $0.050 A 08/01/2017 $1.850 A 08/01/2018 $2.200 A
MARBLE MASON C 08/22/2016 01/31/2017** 02/01/2017 $0.400 A 08/01/2017 $3.000 A 08/01/2018 $3.250 A
PAINTER TAPER 02/22/2016 12/31/2016** 01/01/2017 $3.560 A 01/01/2018 $3.000 A
PAINTER: 02/22/2016 12/31/2016** 01/01/2017 $1.650 A 07/01/2017 $0.500 A
PAINTER: PAPERHANGER, SPRAY PAINTER 02/22/2016 12/31/2016** 01/01/2017 $1.650 A 07/01/2017 $0.500 A
PAINTER: SANDBLASTER 02/22/2016 12/31/2016** 01/01/2017 $1.650 A 07/01/2017 $0.500 A
PAINTER: REMEDIAL PATCHER 02/22/2016 12/31/2016** 01/01/2017 $1.650 A 07/01/2017 $0.500 A
PLASTER TENDER 08/22/2016 06/30/2017** 07/01/2017 $1.600 A 07/01/2018 $1.650 A
PLUMBER: PLUMBER, STEAMFITTER, REFRIGERATION FITTER (HVAC) 08/22/2016 12/31/2016** 01/01/2017 $1.250 A 07/01/2017 $1.250 A 01/01/2018 $1.250 A 07/01/2018 $1.250 A
PLUMBER: UNDERGROUND UTILITY PIPEFITTER 08/22/2016 06/30/2017** 07/01/2017 $1.250 D 07/01/2018 $1.500 E
PLUMBER: LANDSCAPE PIPEFITTER 08/22/2016 06/30/2017** 07/01/2017 $1.250 D 07/01/2018 $1.500 E
PLUMBER: UNDERGROUND UTILITY ASSISTANT JOURNEYMAN F 08/22/2016 06/30/2017** 07/01/2017 $1.250 D 07/01/2018 $1.500 E
PLUMBER: LANDSCAPE ASSISTANT JOURNEYMAN F 08/22/2016 06/30/2017** 07/01/2017 $1.250 D 07/01/2018 $1.500 E
PLUMBER: UNDERGROUND UTILITY TRADESMAN G 08/22/2016 06/30/2017** 07/01/2017 $1.650 H 07/01/2018 $1.900 I
PLUMBER: LANDSCAPE TRADESMAN I J 08/22/2016 06/30/2017** 07/01/2017 $1.650 H 07/01/2018 $1.900 I
PLUMBER: LANDSCAPE TRADESMAN II J 08/22/2016 06/30/2017** 07/01/2017 $1.650 H 07/01/2018 $1.900 I
PLUMBER: FIRE SPRINKLER FITTER (PROTECTION AND CONTROL SYSTEMS, OVERHEAD AND UNDERGROUND) 08/22/2016 12/31/2016** 01/01/2017 $0.550 K 04/01/2017 $1.660 L 01/01/2018 $0.700 M 04/01/2018 $1.950 N 01/01/2019 $0.550 O
TERRAZZO FINISHER P 08/22/2016 06/30/2017** 07/01/2017 $1.000 A 07/01/2018 $1.250 A
TERRAZZO WORKER P 08/22/2016 06/30/2017** 07/01/2017 $1.750 A 07/01/2018 $2.000 A
TILE FINISHER 08/22/2016 09/30/2016** 10/01/2016 $0.700 Q
TILE SETTER 08/22/2016 09/30/2016** 10/01/2016 $0.700 Q 04/01/2017 $3.250 A 04/01/2018 $3.400 A

Return to wage page

FOOTNOTES

**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
A
THE PREDETERMINED INCREASE SHOWN IS TO BE ALLOCATED TO WAGES AND/OR EMPLOYER PAYMENTS. PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 WHEN THE PREDETERMINED INCREASE BECOMES DUE TO CONFIRM THE DISTRIBUTION. PLEASE ALSO EXAMINE THE IMPORTANT NOTICES TO SEE IF ANY MODIFICATIONS HAVE BEEN ISSUED, AS THERE MAY BE REDUCTIONS TO PREDETERMINED INCREASES.
B
$0.75 TO THE BASIC HOURLY RATE AND $0.02 TO NEBF.
C
EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFFOLD SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.
D
$0.25 INCREASE TO BASIC HOULRY RATE AND $1.00 TO HEALTH AND WELFARE
E
$0.25 INCREASE TO BASIC HOURLY RATE, $1.00 TO HEALTH AND WELFARE AND $0.25 TO VACATION/HOLIDAY
F
THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE.
G
THERE SHALL BE NO MORE THAN THREE TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON EACH JOBSITE.
H
$0.65 INCREASE TO BASIC HOURLY RATE AND $1.00 TO HEALTH AND WELFARE
I
$0.65 INCREASE TO BASIC HOURLY RATE, $1.00 TO HEALTH AND WELFARE AND $0.25 TO VACATION/HOLIDAY
J
THERE SHALL BE NO MORE THAN FOUR TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON EACH JOBSITE. MAINTENANCE WORK, BOTH DURING AND AFTER THE PLANT ESTABLISHMENT PERIOD, MAY BE PERFORMED BY LANDSCAPE TRADESMEN WITHOUT THE SUPERVISION OF A JOURNEYMAN PIPEFITTER.
K
$0.40 TO HEALTH AND WELFARE AND $0.15 TO PENSION.
L
$1.49 TO THE BASIC HOURLY RATE, $0.15 TO PENSION AND $0.02 TO TRAINING.
M
$0.50 TO HEALTH AND WELFARE AND $0.20 TO PENSION.
N
$1.65 TO THE BASIC HOURLY RATE, $0.25 TO PENSION AND $0.05 TO TRAINING.
O
$0.35 TO HEALTH AND WELFARE AND $0.20 TO PENSION.
P
THE RATIO OF TERRAZZO FINISHER HOURS TO TERRAZZO WORKER HOURS SHALL NOT EXCEED TWO (2) TO ONE (1).
Q
$0.15 TO HEALTH & WELFARE AND $0.55 TO PENSION.