GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: PLACER COUNTY

DETERMINATION: PLA-2016-1

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE DATE OF NEXT INCREASE 1 AMOUNT OF INCREASE 1 INCREASE FOOTNOTE 1 DATE OF NEXT INCREASE 2 AMOUNT OF INCREASE 2 INCREASE FOOTNOTE 2 DATE OF NEXT INCREASE 3 AMOUNT OF INCREASE 3 INCREASE FOOTNOTE 3 DATE OF NEXT INCREASE 4 AMOUNT OF INCREASE 4 INCREASE FOOTNOTE 4
BRICKLAYER, BLOCKLAYER, POINTER, CLEANER, CAULKER, WATERPROOFER (2ND SHIFT) 08/22/2015 06/30/2016** 07/01/2016 $1.650 A 07/01/2017 $1.700 A
BRICKLAYER, BLOCKLAYER, POINTER, CLEANNER, CAULKER, WATERPROOFER (3RD SHIFT) 08/22/2015 06/30/2016** 07/01/2016 $1.650 A 07/01/2017 $1.700 A
BRICKLAYER, BLOCKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON (2ND SHIFT) 02/22/2016 04/30/2016** 05/01/2016 $1.000 A 05/01/2017 $1.500 A 05/01/2018 $1.750 A
BRICKLAYER, BLOCKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON (3RD SHIFT) 02/22/2016 04/30/2016** 05/01/2016 $1.000 A 05/01/2017 $1.500 A 05/01/2018 $1.750 A
BRICK TENDER BRICK TENDER (SPECIAL SINGLE SHIFT) 08/22/2015 06/30/2016** 07/01/2016 $1.000 A 07/01/2017 $1.000 A 07/01/2018 $1.000 A 07/01/2019 $1.200 A
ELECTRICIAN: COMM & SYSTEM INSTALLER, SECOND SHIFT 02/22/2016 11/30/2016** 12/01/2016 $1.000 A
ELECTRICIAN: COMM & SYSTEM INSTALLER, THIRD SHIFT 02/22/2016 11/30/2016** 12/01/2016 $1.000 A
ELECTRICIAN: COMM & SYSTEM TECH., SECOND SHIFT 02/22/2016 11/30/2016** 12/01/2016 $1.000 A
ELECTRICIAN: COMM & SYSTEM TECH., THIRD SHIFT 02/22/2016 11/30/2016** 12/01/2016 $1.000 A
ELECTRICIAN: INSIDE WIREMAN, 2ND SHIFT 02/22/2016 05/31/2016** 06/01/2016 $2.000 B
ELECTRICIAN: INSIDE WIREMAN, 3RD SHIFT 02/22/2016 05/31/2016** 06/01/2016 $2.000 B
ELECTRICIAN: CABLE SPLICER, 2ND SHIFT 02/22/2016 05/31/2016** 06/01/2016 $2.000 B
ELECTRICIAN: CABLE SPLICER, 3RD SHIFT 02/22/2016 05/31/2016** 06/01/2016 $2.000 B
FIELD SURVEYOR: CHIEF OF PARTY (NIGHT SHIFT) C 02/22/2016 02/28/2017** 03/01/2017 $2.000 A
FIELD SURVEYOR: INSTRUMENTMAN (NIGHT SHIFT) C 02/22/2016 02/28/2017** 03/01/2017 $2.000 A
FIELD SURVEYOR: CHAINMAN/RODMAN (NIGHT SHIFT) C 02/22/2016 02/28/2017** 03/01/2017 $2.000 A
MARBLE FINISHER MARBLE FINISHER (2ND SHIFT) D 08/22/2015 07/31/2016** 08/01/2016 $1.300 A 02/01/2017 $0.050 A 08/01/2017 $1.850 A 08/01/2018 $2.200 A
MARBLE MASON MARBLE MASON (2ND SHIFT) D 08/22/2015 07/31/2016** 08/01/2016 $2.100 A 02/01/2017 $0.400 A 08/01/2017 $3.000 A 08/01/2018 $3.250 A
TERRAZZO FINISHER TERRAZZO FINISHER, 2ND SHIFT E 02/22/2016 06/30/2016** 07/01/2016 $1.000 A 07/01/2017 $1.000 A 07/01/2018 $1.250 A
TERRAZZO FINISHER TERRAZZO FINISHER, 3RD SHIFT E 02/22/2016 06/30/2016** 07/01/2016 $1.000 A 07/01/2017 $1.000 A 07/01/2018 $1.250 A
TERRAZZO WORKER TERRAZZO WORKER, 2ND SHIFT E 02/22/2016 06/30/2016** 07/01/2016 $1.500 A 07/01/2017 $1.750 A 07/01/2018 $2.000 A
TERRAZZO WORKER TERRAZZO WORKER, 3RD SHIFT E 02/22/2016 06/30/2016** 07/01/2016 $1.500 A 07/01/2017 $1.750 A 07/01/2018 $2.000 A

Return to wage page

FOOTNOTES

**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
A
THE PREDETERMINED INCREASE SHOWN IS TO BE ALLOCATED TO WAGES AND/OR EMPLOYER PAYMENTS. PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 WHEN THE PREDETERMINED INCREASE BECOMES DUE TO CONFIRM THE DISTRIBUTION. PLEASE ALSO EXAMINE THE IMPORTANT NOTICES TO SEE IF ANY MODIFICATIONS HAVE BEEN ISSUED, AS THERE MAY BE REDUCTIONS TO PREDETERMINED INCREASES.
B
$2.00 TO OTHER PAYMENTS (LMCC).
C
ALL CREWS, WITHOUT CONSIDERATION TO THE NUMBER OF INDIVIDUALS IN THE CREW, SHALL INCLUDE A CHIEF OF PARTY. A CREW CONSISTS OF ONE (1) OR MORE EMPLOYEES PERFORMING FIELD AND CONSTRUCTION SURVEY WORK.
D
EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFFOLD SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.
E
THE RATIO OF TERRAZZO FINISHER HOURS TO TERRAZZO WORKER HOURS SHALL NOT EXCEED TWO (2) TO ONE (1).