GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: SAN BERNARDINO COUNTY

DETERMINATION: SBR-2016-1

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE DATE OF NEXT INCREASE 1 AMOUNT OF INCREASE 1 INCREASE FOOTNOTE 1 DATE OF NEXT INCREASE 2 AMOUNT OF INCREASE 2 INCREASE FOOTNOTE 2 DATE OF NEXT INCREASE 3 AMOUNT OF INCREASE 3 INCREASE FOOTNOTE 3 DATE OF NEXT INCREASE 4 AMOUNT OF INCREASE 4 INCREASE FOOTNOTE 4
ELECTRICIAN: COMM & SYSTEM INSTALLER 02/22/2016 12/25/2016** 12/26/2016 $1.500 A 01/01/2018 $1.750 A 01/01/2019 $2.000 A
ELECTRICIAN: INSIDE WIREMAN - ZONE A B 08/22/2015 05/31/2016** 06/01/2016 $1.800 A 06/01/2017 $1.900 A 06/01/2018 $1.950 A 06/01/2019 $2.000 A
ELECTRICIAN: CABLE SPLICER - ZONE A B 08/22/2015 05/31/2016** 06/01/2016 $1.800 A 06/01/2017 $1.900 A 06/01/2018 $1.950 A 06/01/2019 $2.000 A
ELECTRICIAN: TUNNEL WIREMAN - ZONE A B 08/22/2015 05/31/2016** 06/01/2016 $1.800 A 06/01/2017 $1.900 A 06/01/2018 $1.950 A 06/01/2019 $2.000 A
GLAZIER 02/22/2016 05/31/2016** 06/01/2016 $1.330 C
MARBLE FINISHER 08/22/2015 05/31/2016** 06/01/2016 $1.000 A
PLASTERER 08/22/2015 08/02/2016** 08/03/2016 $1.750 A 08/02/2017 $1.750 A
PLASTER TENDER D 08/22/2015 08/02/2016** 08/03/2016 $1.750 A 08/02/2017 $1.750 A
PLASTER TENDER PLASTER CLEAN-UP LABORER 08/22/2015 08/02/2016** 08/03/2016 $1.750 A 08/02/2017 $1.750 A
PLUMBER: PLUMBER, INDUSTRIAL AND GENERAL PIPEFITTER 08/22/2015 06/30/2016** 07/01/2016 $2.020 A 07/01/2017 $2.430 A
PLUMBER: SEWER AND STORM DRAIN PIPELAYER 08/22/2015 06/30/2016** 07/01/2016 $1.560 A 07/01/2017 $1.870 A
PLUMBER: SEWER AND STORM DRAIN PIPE TRADESMAN E 08/22/2015 06/30/2016** 07/01/2016 $0.800 A 07/01/2017 $0.970 A
PLUMBER: SERVICE & REPAIR (PLUMBER/HVAC-FITTER) 08/22/2015 06/30/2016** 07/01/2016 $2.020 A 07/01/2017 $2.430 A
PLUMBER: LANDSCAPE/IRRIGATION FITTER 08/22/2015 06/30/2016** 07/01/2016 $1.520 A 07/01/2017 $1.820 A
ROOFER 02/22/2016 07/31/2016** 08/01/2016 $1.800 F 08/01/2017 $1.800 G 08/01/2018 $1.850 H 08/01/2019 $1.900 I
ROOFER PITCH WORK 02/22/2016 07/31/2016** 08/01/2016 $1.800 F 08/01/2017 $1.800 G 08/01/2018 $1.850 H 08/01/2019 $1.900 I
ROOFER PREPARER 02/22/2016 07/31/2016** 08/01/2016 $1.800 F 08/01/2017 $1.800 G 08/01/2018 $1.850 H 08/01/2019 $1.900 I
SHEET METAL WORKER 08/22/2015 06/30/2016** 07/01/2016 $2.100 J 07/01/2017 $2.000 K 07/01/2018 $2.000 A 07/01/2019 $2.000 A
TILE FINISHER 08/22/2015 05/31/2016** 06/01/2016 $0.850 A
TILE LAYER 08/22/2015 05/31/2016** 06/01/2016 $1.150 A

Return to wage page

FOOTNOTES

**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
A
THE PREDETERMINED INCREASE SHOWN IS TO BE ALLOCATED TO WAGES AND/OR EMPLOYER PAYMENTS. PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 WHEN THE PREDETERMINED INCREASE BECOMES DUE TO CONFIRM THE DISTRIBUTION. PLEASE ALSO EXAMINE THE IMPORTANT NOTICES TO SEE IF ANY MODIFICATIONS HAVE BEEN ISSUED, AS THERE MAY BE REDUCTIONS TO PREDETERMINED INCREASES.
B
ZONE A IS DEFINED AS THE PORTION OF THE COUNTY 80 ROAD MILES FROM U.S. POST OFFICE, 455 W. ORANGE SHOW ROAD, SAN BERNARDINO. ZONE B IS DEFINED AS ANY WORK OUTSIDE OF ZONE A (80 MILE FREE ZONE) WHICH REQUIRES AN ADDITIONAL $12.00 PER HOUR FOR TRAVEL/SUBSISTENCE. PAY SHALL BE ON A SEPARATE CHECK.
C
$1.00 TO THE BASIC HOURLY RATE, $0.25 TO HEALTH & WELFARE, AND $0.08 TO PENSION.
D
THE RATIO OF PLASTER TENDERS TO PLASTERERS SHALL BE AS FOLLOWS: THERE SHALL BE A PLASTER TENDER ON THE JOBSITE WHENEVER THERE IS A PLASTERER PERFORMING WORK ON THE JOBSITE, EXCEPT ON SMALL PATCH WORK WHERE ONLY ONE PLASTERER IS PERFORMING WORK. FOR INSIDE BROWN COATINGS THERE SHALL BE 2 PLASTER TENDERS FOR UP TO EVERY 3 PLASTERERS. FOR INSIDE FINISH COATINGS THERE SHALL BE 1 PLASTER TENDER FOR UP TO EVERY 3 PLASTERERS. ON OUTSIDE FINISH AND BROWN COATINGS AND FOR ALL OTHER WORK, THERE SHALL BE 1 PLASTER TENDER FOR UP TO EVERY 2 PLASTERERS.
E
PIPE TRADESMEN SHALL NOT BE PERMITTED ON ANY JOB WITHOUT A JOURNEYMAN.
F
$0.80 TO BASIC HOURLY RATE ($0.10 TO DUES CHECK OFF, INCLUDED IN BHR), $0.25 TO HEALTH & WELFARE, $0.65 TO PENSION AND $0.10 TO TRAINING
G
$0.95 TO BASIC HOURLY RATE, $0.25 TO HEALTH & WELFARE, $0.53 TO PENSION, $0.02 TO TRAINING AND $0.05 TO OTHER
H
$1.05 TO BASIC HOURLY RATE, $0.25 TO HEALTH & WELFARE, AND $0.55 TO PENSION
I
$1.40 TO BASIC HOURLY RATE, $0.25 TO HEALTH & WELFARE AND $0.25 TO PENSION
J
$1.20 TO PENSION AND $0.90 TO WAGES AND/OR FRINGES. PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 WHEN THE PREDETERMINED INCREASE BECOMES DUE TO CONFIRM THE DISTRIBUTION. PLEASE ALSO EXAMINE THE IMPORTANT NOTICES TO SEE IF ANY MODIFICATIONS HAVE BEEN ISSUED, AS THERE MAY BE REDUCTIONS TO PREDETERMINED INCREASES.
K
$0.28 TO PENSION AND $1.72 TO WAGES AND/OR FRINGES. PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 WHEN THE PREDETERMINED INCREASE BECOMES DUE TO CONFIRM THE DISTRIBUTION. PLEASE ALSO EXAMINE THE IMPORTANT NOTICES TO SEE IF ANY MODIFICATIONS HAVE BEEN ISSUED, AS THERE MAY BE REDUCTIONS TO PREDETERMINED INCREASES.

Return to main page