GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1
FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: LASSEN COUNTY

DETERMINATION: LAS-2013-1

___________________________________________________________________________________________________________________________________________________________________
                            |          |            |          |              EMPLOYER PAYMENTS            |STRAIGHT-TIME|          OVERTIME HOURLY RATE          
  CRAFT (JOURNEY LEVEL)     |   ISSUE  | EXPIRATION |   BASIC  |  HEALTH  |          | VACATION |          |         |      |TOTAL |          |          |   SUNDAY
                            |   DATE   |    DATE    |  HOURLY  |    AND   |  PENSION |    /     | TRAINING |  OTHER  |HOURS |HOURLY|   DAILY  | SATURDAY |     AND
                            |          |            |    RATE  |  WELFARE |          |  HOLIDAY |          |         |      | RATE |          |          |   HOLIDAY  
# BRICKLAYER, BLOCKLAYER,   |          |            |          |          |          |          |          |         |      |      |          |          |
   POINTER, CLEANER,        |          |            |          |          |          |          |          |         |      |      |          |          |
   CAULKER, WATERPROOFER    |          |            |          |          |          |          |          |         |      |      |          |          |
   (2ND SHIFT)              |02/22/2013|06/30/2013**|A   39.880|     9.690|     7.530|B     -   |     1.250|    0.400|C  8.0|58.750|    78.690|D   78.690|    98.630
   POINTER, CLEANNER,       |          |            |          |          |          |          |          |         |      |      |          |          |
   CAULKER, WATERPROOFER    |          |            |          |          |          |          |          |         |      |      |          |          |
   (3RD SHIFT)              |02/22/2013|06/30/2013**|A   41.620|     9.690|     7.530|B     -   |     1.250|    0.400|C  8.0|60.490|    81.300|D   81.300|   102.110
# BRICKLAYER, BLOCKLAYER:   |          |            |          |          |          |          |          |         |      |      |          |          |
   BRICKLAYER, BLOCKLAYER,  |          |            |          |          |          |          |          |         |      |      |          |          |
   STONEMASON (2ND SHIFT)   |02/22/2013|04/30/2013**|A   36.120|     9.690|     9.020|E    2.500|     0.800|F   1.130|C  8.0|59.260|G   78.570|G   78.570|    97.880
   BRICKLAYER, BLOCKLAYER,  |          |            |          |          |          |          |          |         |      |      |          |          |
   STONEMASON (3RD SHIFT)   |02/22/2013|04/30/2013**|A   37.880|     9.690|     9.020|E    2.500|     0.800|F   1.130|C  8.0|61.020|G   81.210|G   81.210|   101.400
# BRICK TENDER              |          |            |          |          |          |          |          |         |      |      |          |          |
   BRICK TENDER (SPECIAL    |          |            |          |          |          |          |          |         |      |      |          |          |
   SINGLE SHIFT)            |08/22/2010|06/30/2011* |H   33.420|     6.040|     7.160|B     -   |     0.340|      -  |C  8.0|46.960|G   63.670|G   63.670|    80.380
# ELECTRICIAN:              |          |            |          |          |          |          |          |         |      |      |          |          |
   COMM & SYSTEM INSTALLER, |          |            |          |          |          |          |          |         |      |      |          |          |
   SECOND SHIFT             |02/22/2013|11/30/2013**|    26.820|     9.000|I    1.950|J    2.240|     1.100|K   0.110|L  7.5|42.150|    56.030|    56.030|M   69.910
   COMM & SYSTEM INSTALLER, |          |            |          |          |          |          |          |         |      |      |          |          |
   THIRD SHIFT              |02/22/2013|11/30/2013**|    28.040|     9.000|I    1.950|N    2.340|     1.100|K   0.110|O  7.0|43.520|    58.030|    58.030|M   72.540
   COMM & SYSTEM TECH.,     |          |            |          |          |          |          |          |         |      |      |          |          |
   SECOND SHIFT             |02/22/2013|11/30/2013**|    30.890|     9.000|I    1.950|P    2.570|     1.100|K   0.110|L  7.5|46.700|    62.680|    62.680|M   78.660
   COMM & SYSTEM TECH.,     |          |            |          |          |          |          |          |         |      |      |          |          |
   THIRD SHIFT              |02/22/2013|11/30/2013**|    32.290|     9.000|I    1.950|Q    2.690|     1.100|K   0.110|O  7.0|48.270|    64.980|    64.980|M   81.690
   INSIDE WIREMAN, 2ND SHIFT|02/22/2012|05/31/2012* |    45.670|    10.630|I    4.500|B     -   |     1.370|R   0.720|L  7.5|64.990|    88.880|    88.880|M  112.760
   INSIDE WIREMAN, 3RD SHIFT|02/22/2012|05/31/2012* |    51.150|    10.630|I    4.500|B     -   |     1.370|R   0.720|O  7.0|70.720|    97.470|    97.470|M  124.230
   CABLE SPLICER, 2ND SHIFT |02/22/2012|05/31/2012* |    50.230|    10.630|I    4.500|B     -   |     1.370|R   0.720|L  7.5|69.760|    96.030|    96.030|M  122.300
   CABLE SPLICER, 3RD SHIFT |02/22/2012|05/31/2012* |    56.270|    10.630|I    4.500|B     -   |     1.370|R   0.720|O  7.0|76.080|   105.510|   105.510|M  134.940
# MARBLE FINISHER           |          |            |          |          |          |          |          |         |      |      |          |          |
   MARBLE FINISHER (2ND     |          |            |          |          |          |          |          |         |      |      |          |          |
   SHIFT) S                 |02/22/2013|07/31/2013**|T   33.020|     9.690|     2.980|U     -   |     0.450|    0.200|   8.0|46.340|V   62.850|    79.360|    79.360
# MARBLE MASON              |          |            |          |          |          |          |          |         |      |      |          |          |
   MARBLE MASON (2ND SHIFT) |          |            |          |          |          |          |          |         |      |      |          |          |
   S                        |02/22/2013|07/31/2013**|T   45.220|     9.220|    10.560|U     -   |     0.550|    0.210|   8.0|65.760|V   88.370|   110.980|   110.980
# TERRAZZO FINISHER         |          |            |          |          |          |          |          |         |      |      |          |          |
   TERRAZZO FINISHER, 2ND   |          |            |          |          |          |          |          |         |      |      |          |          |
   SHIFT                    |02/22/2013|06/30/2013**|W   37.420|     8.530|     4.580|B     -   |     0.800|    0.790|   7.0|52.120|X   68.750|X   68.750|    85.380
   TERRAZZO FINISHER, 3RD   |          |            |          |          |          |          |          |         |      |      |          |          |
   SHIFT                    |02/22/2013|06/30/2013**|W   37.420|     8.530|     4.580|B     -   |     0.800|    0.790|   7.0|52.120|X   68.750|X   68.750|    85.380
# TERRAZZO WORKER           |          |            |          |          |          |          |          |         |      |      |          |          |
   TERRAZZO WORKER, 2ND     |          |            |          |          |          |          |          |         |      |      |          |          |
   SHIFT                    |02/22/2013|06/30/2013**|W   47.800|     9.690|    13.130|B     -   |     0.800|    0.880|   7.0|72.300|X   93.560|X   93.560|   114.810
   TERRAZZO WORKER, 3RD     |          |            |          |          |          |          |          |         |      |      |          |          |
   SHIFT                    |02/22/2013|06/30/2013**|W   47.800|     9.690|    13.130|B     -   |     0.800|    0.880|   7.0|72.300|X   93.560|X   93.560|   114.810
___________________________________________________________________________________________________________________________________________________________________
                                        GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
                                  PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1


*  EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT
   AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.


** THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED.  IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD
   BE INCORPORATED IN CONTRACTS ENTERED INTO NOW.  CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
#  INDICATES AN APPRENTICEABLE CRAFT.  THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @
   HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.  TO OBTAIN ANY APPRENTICE WAGE RATES AS OF JULY 1, 2008 AND PRIOR TO SEPTEMBER 1, 2012,
   PLEASE CONTACT THE DIVISION OF APPRENTICESHIP STANDARDS OR REFER TO THE DIVISION OF APPRENTICESHIP STANDARDS' WEBSITE AT
   HTTP://WWW.DIR.CA.GOV/DAS/DAS.HTML.
&  THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.

____________
A  INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
B  INCLUDED IN STRAIGHT-TIME HOURLY RATE.
C  SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
D  RATE APPLIES TO THE FIRST 10 HOURS WORKED ON SATURDAY.  ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
E  AMOUNT INCLUDED IN FACTORING OVERTIME RATES.
F  INCLUDES AMOUNT FOR INDUSTRY PROMOTION FUND, INTERNATIONAL MASONRY INSTITUTE (IMI), AND LABOR MANAGEMENT COOPERATION COMMITTEE (LMCC)
G  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY
   RATE.
H  INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
I  IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE  BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES
   BENEFIT BOARD.
J  VACATION/HOLIDAY AMOUNT; AFTER FIVE YEARS OF SERVICE EQUALS $2.85 PER HOUR.
K  IN ADDITION TO THE AMOUNT SHOWN, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER FOR EACH OVERTIME HOUR, $0.11 IS ADDED TO THE TOTAL HOURLY
   RATE AND OVERTIME HOURLY RATES FOR THE LABOR MANAGEMENT COOPERATION COMMITTEE FUND.
L  8 HOURS PAY FOR 7.5 HOURS WORKED AT THE STRAIGHT TIME BASIC HOURLY RATE
M  DISREGARD THIS RATE.  USE THE SUNDAY AND HOLIDAY NON-SHIFT DIFFERENTIAL RATE FOR THIS CLASSIFICATION AS PUBLISHED IN THE DIRECTOR'S GENERAL PREVAILING
   WAGE DETERMINATIONS.
N  VACATION/HOLIDAY AMOUNT; AFTER FIVE YEARS OF SERVICE EQUALS $2.98 PER HOUR.
O  8 HOURS PAY FOR 7 HOURS WORKED AT THE STRAIGHT TIME BASIC HOURLY RATE.
P  VACATION/HOLIDAY AMOUNT; AFTER FIVE YEARS OF SERVICE EQUALS $3.29 PER HOUR.
Q  VACATION/HOLIDAY AMOUNT; AFTER FIVE YEARS OF SERVICE EQUALS $3.44 PER HOUR.
R  IN ADDITION, AN AMOUNT EQUAL TO 1.6% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY
   RATE AND OVERTIME HOURLY RATES FOR THE CONTRACT ADMINISTRATION FUND.
S  EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFOLD SHALL BE PAID AN ADDITIONAL $15.00 PER DAY ABOVE THE WAGE RATE.
T  INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.
U  INCLUDED IN BASIC HOURLY RATE.
V  RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
W  INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
X  RATE APPLIES TO THE FIRST 3 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAY.  ALL OTHER TIME IS PAID AT THE
   SUNDAY/HOLIDAY OVERTIME RATE.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE
   COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH
   THE DIRECTOR OF INDUSTRIAL RELATIONS.  IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING
   RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE.  YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS
   ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/PWD.  HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINAT

TRAVEL AND/OR SUBSISTENCE: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH
   WORKER TO EXECUTE THE WORK.  YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT
   HTTP://WWW.DIR.CA.GOV/OPRL/PWD.  TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE
   OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.